Error message

  • User error: "podcast_view_all" is an invalid render array key in Drupal\Core\Render\Element::children() (line 98 of core/lib/Drupal/Core/Render/Element.php).
  • User error: "podcast_view_all" is an invalid render array key in Drupal\Core\Render\Element::children() (line 98 of core/lib/Drupal/Core/Render/Element.php).
  • User error: "podcast_view_all" is an invalid render array key in Drupal\Core\Render\Element::children() (line 98 of core/lib/Drupal/Core/Render/Element.php).
  • Deprecated function: pathinfo(): Passing null to parameter #1 ($path) of type string is deprecated in Drupal\image\Entity\ImageStyle->supportsUri() (line 385 of core/modules/image/src/Entity/ImageStyle.php).
  • Deprecated function: pathinfo(): Passing null to parameter #1 ($path) of type string is deprecated in Drupal\image\Entity\ImageStyle->supportsUri() (line 385 of core/modules/image/src/Entity/ImageStyle.php).
  • Deprecated function: pathinfo(): Passing null to parameter #1 ($path) of type string is deprecated in Drupal\image\Entity\ImageStyle->supportsUri() (line 385 of core/modules/image/src/Entity/ImageStyle.php).
  • Deprecated function: pathinfo(): Passing null to parameter #1 ($path) of type string is deprecated in Drupal\image\Entity\ImageStyle->supportsUri() (line 385 of core/modules/image/src/Entity/ImageStyle.php).
  • Deprecated function: pathinfo(): Passing null to parameter #1 ($path) of type string is deprecated in Drupal\image\Entity\ImageStyle->supportsUri() (line 385 of core/modules/image/src/Entity/ImageStyle.php).
  • Deprecated function: pathinfo(): Passing null to parameter #1 ($path) of type string is deprecated in Drupal\image\Entity\ImageStyle->supportsUri() (line 385 of core/modules/image/src/Entity/ImageStyle.php).

Status message

  • Debug: Could not apply image style favorites. in Drupal\twig_tweak\TwigExtension->imageStyle() (line 1076 of modules/contrib/twig_tweak/src/TwigExtension.php).
  • Debug: Could not apply image style favorites. in Drupal\twig_tweak\TwigExtension->imageStyle() (line 1076 of modules/contrib/twig_tweak/src/TwigExtension.php).
  • Debug: Could not apply image style favorites. in Drupal\twig_tweak\TwigExtension->imageStyle() (line 1076 of modules/contrib/twig_tweak/src/TwigExtension.php).
  • Debug: Could not apply image style favorites. in Drupal\twig_tweak\TwigExtension->imageStyle() (line 1076 of modules/contrib/twig_tweak/src/TwigExtension.php).
  • Debug: Could not apply image style favorites. in Drupal\twig_tweak\TwigExtension->imageStyle() (line 1076 of modules/contrib/twig_tweak/src/TwigExtension.php).
  • Debug: Could not apply image style favorites. in Drupal\twig_tweak\TwigExtension->imageStyle() (line 1076 of modules/contrib/twig_tweak/src/TwigExtension.php).

Favorites

Content type
(0 Selected)
Select Content type(s)
Selected: None

Design Vault Ep. 2 Vanderbilt University with Steve Knight

ABOUT THE ARCHITECT: 

steve knight

 

Steve Knight, AIA is a Principal with David M. Schwarz Architects, Inc. he studied at North Carolina State University where he received his Master of Architecture, that same year he joined David M. Schwarz Architects. Steve primarily focuses on his firm’s performing arts venue projects. He served as Project Architect for the design of Schermerhorn Symphony Center, The Palladium at the Center for the Performing Arts, the Gaillard Center, and most recently an 8,000-seat amphitheater in Huntsville, Alabama. He is currently leading the office’s team on the design of a neighborhood center for Chevy Chase Lake in Maryland and the multi-phase Residential College project at Vanderbilt University. Steve is active in preservation advocacy, serving as President of the Art Deco Society of Washington and on the board of the International Coalition of Art Deco Societies.

 

 

vanderbilt university

 

Featured Products

Molded Collection

You May Also Be Interested In

We Can Help With Your Next Project

Discover the latest + greatest in design trends, industry news & pro tips from pros.

For all of your project needs, you’ll find everything you need at a Supply Center.

Let Us Know How We Can Help!

Design Vault Ep. 11 Surf Avenue with Jay Valgora

ABOUT THE ARCHITECT: 

jay valgora

 

Inspired by the industrial architecture in his hometown of Buffalo, from the grain elevators to the steel mills where his father worked, Mr. Valgora pursued his passion for architecture. Receiving degrees from Cornell University, Harvard University GSD, and a Fulbright Fellow to the United Kingdom, he gained valuable experience in firms from Boston to London. Finally arriving in New York City, he honed his experience at classic firms before founding STUDIO V Architecture, a practice dedicated to the reinvention of the city. Mr. Valgora’s work is defined by an extraordinary range of projects and scales, encompassing new construction, adaptive re-use, renovation, and interiors. His designs have been internationally recognized for engaging history, culture and context with innovative contemporary design: creating inspirational public spaces, encouraging diversity, restoring historic artifacts, and bringing new life to the edges and interstices of our city while reconnecting communities.

 

 


You May Also Be Interested In

We Can Help With Your Next Project

Discover the latest + greatest in design trends, industry news & pro tips from pros.

For all of your project needs, you’ll find everything you need at a Supply Center.

Let Us Know How We Can Help!

Design Vault Ep. 9 PA State Archives with Paul Neuhaus

ABOUT THE ARCHITECT: 

paul neuhaus

 

Paul Neuhaus, AIA, LEED AP is a senior designer for HGA in their Minneapolis office, and has been practicing for 30 years. Working in their Arts, Community and Education (ACE) practice group, Paul's project work includes studio arts and performing arts facilities, science labs, student centers, and life science classrooms for higher education; as well as libraries, a church, and very recently, a paper archive for the State of Pennsylvania.

 

Paul strives to engender a sense of community and belonging for those who visit and work in the buildings his team designs. Paul's process centers on discovering how the project site, culture, and program can shape space and take form, to reflect his client's aspirations and give dignity, purpose, and pleasure to people's lives.

 

 


You May Also Be Interested In

We Can Help With Your Next Project

Discover the latest + greatest in design trends, industry news & pro tips from pros.

For all of your project needs, you’ll find everything you need at a Supply Center.

Let Us Know How We Can Help!

Brick Blueprint with DS Architecture

Cleveland, OH

Architecture Firm
DS Architecture
Director of Design
Eric F. Pros
Distributor
The Thomas Brick Company
Brick Blueprint with DS Architecture

DS Architecture maximizes client involvement, from design conception to the final stages of construction. DS Architecture encourages clients to join the design team by reviewing and approving every major milestone of the architectural process.

When we asked Eric F. Pros, Director of Design at DS Architecture, about his recent project, Lakewood’s Fire Station Number 2, this is what he had to say:

Q: What was your inspiration for this project?
A: We were inspired by the history of the Lakewood Fire Department and the surrounding neighborhood. This project was a renovation and addition to an existing historic fire station in Lakewood, Ohio which is the most densely packed city in Ohio. The existing building’s character was recognized and celebrated while we improvised on its character and introduced innovative new ideas to not only honor the history of the building, but also elevate its identity with some contemporary style.

The urban context of this site was an inspiration. Because land is in high demand in this city, we had to make the most of every bit of the property, while still being a good neighbor. These conditions which initially seemed like restraints were used as helpful parameters for the project and helped us make informed decisions about the building’s placement, scale, massing, and rooflines.

The people that would be the end users of this facility were an inspiration. The first responders have a great deal of pride in their community and are recognized by the neighborhood as a symbol of civic pride. The long, tall façade of the apparatus bay that could have felt imposing or out of scale with the rest of the neighborhood was instead leveraged as an opportunity for public art and innovative wayfinding signage. The flemish bond brick pattern was articulated in a way that gave the field of brick depth through a textured backdrop for a metal sculpture. The corner of the building that faces the roadway received some special brick detailing attention by rotating the stretcher units 30 degrees in a way that formed a block number 2 that is reminiscent of the fire department’s insignia on their vehicles. In this way, a standard off-the-shelf masonry unit was used to create unique dramatic effects.

Q: What was the overall goal, or desired outcome, for this project?
A: The first goal of the project was to upgrade an existing fire station to suit the needs of modern firefighting and emergency medical services. The pre-existing facility did not offer appropriate space for the new fire trucks and did not have adequate bunk space for first responders. As public safety continues to evolve, the way that fire fighters performed their duties 100 years ago is very different from today. The vertical growth of the city has made it necessary to have longer ladder trucks to respond to emergencies that may occur in high rises.

A secondary goal was to give the first responders a facility that they can be proud of. In a similar way, the residents of the City of Lakewood should be proud of the buildings that represent their rich community and the diverse history of their neighborhood.

Q: Why did you choose brick for this project? How important is material to your approach?
A: There are many reasons why brick made sense for this project. There is a sense of symbology for the fire stations to be constructed of brick. Red brick is somewhat synonymous with fire stations and contributes to their iconic presence in communities. “Fireproof” buildings constructed predominantly with masonry became popular and embraced by fire departments.

Because fire stations are public buildings that are occupied 24 hours a day and often maintained by the crew, low maintenance materials, like brick, are preferable. The long-term durability of fired clay masonry products makes them a good investment for such buildings. The longevity of this material ensures that the building will be a building that the City of Lakewood can be proud of for many years to come.

Material choices greatly impact the perception of a building by the public. As a symbol of safety and civic pride, this fire station needs to evoke a sense of stability and permanence. Glen-Gery brick effectively communicates these ideas in a way that not only fits into its historic context but suggests a long-lasting presence.

Q: What interested you most while designing this project?
A: The people that would be using this building 24 hours a day, 7 days a week are really what this project kept coming back to. Providing a sense of dignity for the first responders that keep the City of Lakewood safe are what this project is all about.

The ability to collaborate with local artist Scott Goss on his metal sculpture installation was truly an honor. The building itself is focused on many of the practical considerations for a fire department, but Scott’s “Shielded Together” installation takes the building a step further and truly pays tribute to the men and women who have dedicated their lives to service. The metal sculpture is highly visible and is lit at night so that it can be appreciated around the clock.

Q: What features of brick are most important to you? What made you choose Glen-Gery?
A: Each project is unique, and every masonry application presents opportunities for innovation. In this project, finding a brick that matched the historic color and texture was our first challenge. Thankfully, Glen-Gery’s robust catalog of clay colors and textures allowed us to have several options to consider that were very close to the original brick from 1919, and the later addition. We were fortunate enough to test several sample panels in natural light next to the existing brick to see which option would give us the best match. Our final selection was Wavetex Red Bark. This brick perfectly complements the existing brick from a century ago. Additionally, because we were using brick in some unique ways with multiple faces exposed to the exterior, finding the right texture that would receive light correctly was critical to the success of the project.

The quality that Glen-Gery provides is an additional reason for our selection. The long-term endurance of the material gives the owners of the building a particular level of comfort because masonry is known for its resilience. On the design side of the equation, the brick’s quality is an added benefit.

Q: What made this design process different from others you have worked on?
A: This project presented several challenges, and seemingly limited opportunities for innovative solutions. A collaborative design process with the client and our team helped to streamline the design process and established goals. Where our innovation came into play was in how we treated the material and the installation that made this project truly unique.

Special care was given during the design phase to enable the project to be built while the facility can serve its primary purpose of serving the community. It’s not uncommon for public buildings to remain operational while a capital improvement project is underway, but this project proved to be more challenging since there was minimal extra space on site. The builders worked diligently to keep the construction from interfering with the spaces needed for the firefighters to perform their duties.

Q: How did you utilize the International Masonry Institute (IMI) for this project, and what was your experience like?
A: The IMI is an incredible resource for designers and contractors. They provide technical expertise on proper masonry detailing and installation and advice on unique designs. The Ohio Regional Director is Tom Elliott, and I owe him a great deal of gratitude for his knowledge and dedication to masonry design over the years. The IMI partners with local BAC training centers to provide hands on training for masonry apprentices and continued educational opportunities for skilled craftworkers.

Once we had developed a design, I reached out to Tom to get his feedback on our concept. We reviewed the details together and decided this project could benefit from a full-scale mockup. I generated some drawings of the brick detail that we were working on that not only showed the detail in elevation and isometrics, but also a course-by-course series of plans that allowed the craftworkers the ability to easily understand the design intent at each course. The bricklayers knew exactly which units needed to be solid or cored, and which ones were to be rotated 30 degrees. Although we shrunk the overall scale of the detail down vertically for safety reasons in the training center, the intent of the design was appreciated.

Q: What is a typical timeline for a project of this scale?
A: The scope of this project was well defined from the beginning which allowed us to streamline the process into 2 distinct phases. This scope of work also allowed the contractors to construct the project while keeping the station fully operational during construction with limited interruptions to their service. The design timeline was approximately 8 months with the construction duration taking nearly 12 months due to the unique phasing of the project and sensitivity to keeping the facility operational.

Q: Has this project won any awards?
A: The Lakewood Fire Station Number 2 was recognized in the 2022 JBC Masonry Innovation Competition through the International Masonry Institute (IMI).

Brick Blueprint with STAT Architecture

New York, NY

Architecture Firm
STAT Architecture
Principal
Suzanna Tharian
Project Manager
Carina Naula
brick blueprint

The goal of STAT Architecture is to provide quality architecture services by understanding client needs, working with budgets, and adhering to deadlines, while providing reliable services. Their focus and expertise lies in new construction projects and the gut rehabilitation of existing buildings. With services that extend through all aspects of the design and construction process, STAT Architecture prefers to work with projects from the inception of the design right through construction completion.

When we asked Suzanna and Carina about their recent project, Soundview Townhomes, this is what they had to say:

Q: What was your inspiration for this project?
A: Soundview Townhomes are located in the Bronx, across from Soundview Park, which opens to the Bronx River. We wanted our architecture to celebrate this unique park frontage, formalizing it with elegant townhomes and maximizing pedestrian access to the park. We looked to the tradition of garden and cooperative apartments in the Bronx and Queens as a point of reference. These building traditions sought to provide equitable and affordable access to light, air, and green space by proposing low-rise units adjacent to parks or gardens. In this vein, we were looking at the affordable housing built by Andrew J. Thomas in the 1930s, but also projects of a more modest scale, like the Regional Planning Association’s Sunnyside Garden. I should note that all these projects, building conventions, and typologies we referenced during design are brick buildings.

Q: What was the overall goal, or desired outcome, for this project? Why?
A: Site for this project is a former parking lot on a NYCHA property. Relatedly, our goal with this project is to replace an automobile infrastructure with a pedestrian infrastructure. The production of street friendly space has a lot to do with the subtleties of façade design. Layout questions—e.g. How far from the street? Where to place entrances? What rhythm and height for windows?—tend to dominate. However, materials tend to best convey care. So, when we selected our façade materials, we really sought proud, durable, stand-out materials to make this project a good neighbor to the Soundview community.

Q: Why did you choose brick for this project? How important is material to your approach?
A: Clients, neighbors, preservationists all seem to like brick best. Brick converses easily with New York’s historic fabric and the local authorities in the Bronx were also very keen on brick. Building practices are an evolving set of conventions. Buildings aren’t made the way they used to be, but neither are bricks. Buildings and aesthetics evolve in parallel conversations between builders, producers, designers, and the public. Our office has been working for 20 years with Sal Pate at Consolidated Brick. From Sal, we learn not just the cost of various bricks, but where and how they were made. All these aspects are important to us as designers. The manufacturing processes and location tell us about the embodied carbon cost of the materials we choose, while finish and color communicate contextuality and care.

Q: What features of brick are most important to you? What made you choose Glen-Gery?
A: For any material, our first priority is due diligence regarding its health and carbon cost. When it comes to aesthetics, the biggest differentiator is the finish texture. Some bricks can look clay-like and awkward, but we’ve had a lot of good experiences with Glen-Gery. It’s a reliable and attractive brick. Your team is very skilled at emulating the molded brick look that gives a project that majestic old New York feeling we all look for.

Q: Why did you select Sioux City product?
A: To be honest: color. We pick out bricks in person. We browse the showroom, pull things we like and put them all up on the wall. Ebonite smooth literally sparkled. We needed an attractive base; ebonite was an easy choice. We choose to complement it with glacier gray which is buff brick speckled with blues and creams.

Brick Blueprint with Architecture Plus Information

New York, NY

Architecture Firm
A+I
Products
Livenza Raw
brick blueprint with archtiecture plus information

A+I is a New York based strategy-driven architecture and design agency focused on the future of work.

The name stems from Architecture + Information and encapsulates the firm’s investigative approach and creative curiosity. A+I was founded in 1996 by Brad Zizmor and Dag Folger who met at Columbia University. At the time, the blossoming dot-com era spotlighted architecture’s ability to push the boundaries of workplace design and meet the evolving needs of its workers. Since then, A+I has grown to be an internationally renowned firm with a diverse practice that encompasses branding, strategy, design, and architecture, specializing in workplace, retail and development projects.

A+I is recognized for its thought leadership in workplace strategy and design, its award-winning projects, and its meticulous, research-based designs. Recently completed projects include the Headquarters for Le Truc (part of Publicis Groupe), Peloton, Squarespace, Equinox, and Hines, as well as the elevated repositioning of theMART and PENN 1 for Vornado Realty Trust, and ‘The Gardens’ at 780 3rd for Nuveen Real Estate.

Q: What was your inspiration for the Peloton Headquarters?
A: Our greatest inspiration was the community of creators we met at Peloton, and their collective mission to support and empower their members. They aspired for their workplace environment to be egalitarian and of the highest quality, giving everyone throughout the organization equal treatment. That ambition informed the creative direction for the project and served as an anchor for design decisions. As a result, central to the design was the idea of a shared experience – one of connectivity and community.

Q: What was the overall goal, or desired outcome, for this project?
A: Our goal was to support every creator uniquely and equally, while maintaining perspective on the collective mission. We met and interviewed a wide range of creators with diverse workplace needs who were united by a commitment to a shared vision, and we wanted to support and celebrate that commitment.

Q: Why did you choose brick for this project? How important is material to your approach?
A: We chose brick after a thorough material research phase for a central “spine” wall that connects every floor of the project through a shared open space. We needed a material that would be constructed through aggregation, a process in which countless individual elements are combined to create an effect greater than its parts. In this way, the wall became an embodiment of our architectural mission. 

Q: What interested you most while designing this project?
A: We spent a lot of time engineering a system for the brick wall that could achieve the complex stacking and rotating pattern we designed. This pattern was developed in response to Peloton’s branding collateral, which uses similar gradient patterns to express dynamic movement, appropriate for this active and stacked space.

Q: What features of brick are most important to you? What made you choose Glen-Gery?
A: In addition to its construction logic, we chose Livenza Raw for its tactile qualities and variation in color and texture. For the desired effect to be achieved, each individual unit in the wall needed to have a distinct and “handmade” quality that set it apart.

Q: What made this design process different from others you have worked on?
A: Because of the complexity inherent in the design, there was a lot of back and forth between the overall design intent of the wall and the details built into each brick. This feedback loop between scales is different from other materials and led to the success of the end result.

Q: What is a typical timeline for a project of this scale?
A: For a project of this scale, the timeline varies greatly depending on a number of factors, from the extent of the strategic interrogation to the complexity of the design. A+I carefully designs the approach and schedule for a project based on our client’s unique needs and desires. On average, a project of this kind takes approx. 18-24 months.

Q: Has this project won any awards?
A: SARA National Design Awards 2022, Fitwel Impact Award 2022 (“Highest Scoring Project of All Time”)

 

Project Team
Phil Ward, Peter Knutson, Sohee Moon, Chris Shelley, Hannah Lee, Vané Broussard, Nico Martin, Maria Lozano, Anjali Patel, Catalina Rivera, Jara Mira, Josipa Baricevic, Katherine Salamat

Ebonite Smooth, Glacier Gray Western

Front+Center

Whether you’re building a new home or planning a special project, you’ll find everything you need at a Brickworks Supply Center.