In this episode we’re exploring the Best of Mixed Use Styles. Discover how brick plays a starring role in creating dynamic spaces that blend residential, retail, and commercial elements. From vibrant urban centers to innovative suburban developments, this episode highlights the versatility and beauty of mixed-use design. Tune in for expert insights and creative inspiration that bring communities to life. |
Front + York
Michelle Wagner
Morris Adjmi Architects
Gansevoort Row
David Kubik
BKSK
Park + Elton
David E. Gross
GF55 Architects
TRANSCRIPT
00;00;00;02 - 00;00;05;10
DP (Doug Pat)
Let's go inside the vault. The design vault.
00;00;05;12 - 00;00;33;19
JI (Jeremy Iannucci)
So the site's essentially just a rectangle. It's the size of a full city block. So the way that we've organized the buildings around the site is in this U-shape, where they start up in the northwest corner. Move around down West Street and then below, creating a U that opens up towards the water. We try to open up the view corridors from the building and leave as much view towards the water and towards the horizon from the rest of Greenpoint as we can.
00;00;33;22 - 00;02;07;13
DP
In this special series, we're unlocking some of the most powerful conversations we've had so far. We're connecting the dots, revealing hidden gems, and unearthing insights that might have slipped by. All to spark your next big idea with brick. Whether you're looking for fresh inspiration or innovative solutions, this series is designed to fuel your creativity. So let's dive in.
Hi, I'm Doug Pat and this is Design Vault.
Today we explore mixed use developments, a type of urban design that integrates multiple uses such as residential, commercial, cultural, institutional, and entertainment into one cohesive space. Mixed use projects aim to create vibrant, interconnected communities by physically and functionally blending these diverse components, often prioritizing pedestrian friendly environments. This bonus episode highlights three remarkable mixed use projects from past episodes, emphasizing insights from architects Jeremy Iannucci, John Zimmer, and Vincente Quiroga.
We'll explore the architectural design process, construction challenges and the thoughtful use of materials, particularly brickwork, to bring these complex developments to life.
Jeremy Iannucci discussed One Java, a residential project in Greenpoint, Brooklyn. This ambitious development balances sustainability, affordability and marketability with cutting edge features.
00;02;07;19 - 00;02;36;27
JI
The site's 200ft in the North south and then between West Street and the East River around 600ft, with 40ft reserved for a waterfront esplanade. We actually pulled back even a little bit further from that, and it's located right on the waterfront in Greenpoint. There was recently a rezoning that allowed for a whole redesign of the waterfront, and our project is one of the earlier projects in that redevelopment.
00;02;36;29 - 00;02;42;19
DP
So could you give us an idea of what the scope of the project is and the programmatic requirements?
00;02;42;26 - 00;03;03;06
JI
So it's a residential project of around 834 units, encompassing a total of around 800,000ft². This also comes with a series of amenity spaces, a series of retail spaces, as well as that waterfront park and also a collection of rooftop amenities in greenspace.
00;03;03;08 - 00;03;10;03
DP
So let's talk about the building design. Stylistically, were you guys borrowing from anything locally?
00;03;10;05 - 00;03;35;06
JI
We like to think that the entire project comes from the community around it. We looked at a series of precedents in the Greenpoint neighborhood historically, and Greenpoint specifically on the waterfront, to inspire the way that we detail these facades. We have a collection of different brick styles that help to break up the massing of the building, different articulations, as well as material bricks with the two precast towers.
00;03;35;08 - 00;03;40;11
DP
So what was on the site before you guys ended up building the new architecture?
00;03;40;13 - 00;04;04;25
JI
Previously, there was a two story warehouse on the site, and it really was kind of a beautiful space in its own right before. We got the chance to tour around, before it was demolished. And I think walking around really inspired us just with these qualities of light and materials and things that were really native to the waterfront before all of this redevelopment.
00;04;04;28 - 00;04;14;08
DP
And the project, as I said, very large. Could you tell me a little bit about the zoning requirements and any challenges you guys had in terms of planning?
00;04;14;10 - 00;05;11;19
JI
So the project is as of right. It follows the zoning guidelines. The lot itself is actually split up into two different zones. So towards the inland it's mostly low rise. We had a height cap of 65ft with portions that were allowable to go up to 100. And then towards the waterfront. The zoning actually got a little more complicated where there were a few different conditions that you could meet.
It opened up these different paths for how the building could be formed. One path was a one tower scheme, which would bring you up to 360ft. And then the other was actually a two tower scheme where if one tower made it to 200ft, the other would be allowed up to 400ft. We took advantage of that in order to move more of the mass to the waterfront.
It helped gradually declined building back into the fabric of the community, and it provided more waterfront views.
00;05;11;21 - 00;05;19;14
DP
John Zimmer shared insights on The Lively, an 18 story tower in Jersey City's Powerhouse Arts District.
00;05;19;17 - 00;06;12;23
JZ (John Zimmer)
The Powerhouse Arts District in Jersey City is so named because there is a somewhat iconic powerhouse there. It had been an industrial area that was targeted for redevelopment, and they had design standards for the entire district that were meant to maintain that character. Not necessarily industrial, but loft style, focus on the arts. The entire district has a strong focus on the arts, which is part of the reason we have the black box theater in The Lively.
It's experienced a lot of new development over the course of the last decade, and it's pretty great today. When I first started going over to the powerhouse ten years ago, I'd get out of meetings and the sidewalks would be deserted, and today it feels like Brooklyn. It feels like the East Village. I mean, it is incredibly, for want of a better word, lively.
So it's a great neighborhood now, and it's all happened in the last decade. It's an exciting thing to have been a part of, honestly.
00;06;12;26 - 00;06;20;01
DP
This mixed use development includes retail spaces, a black box theater, and residential units.
00;06;20;03 - 00;07;17;00
JZ
180 residential units. Lennar is one of the biggest home builders in America, but they were mostly doing suburban subdivision work. They got into the urban markets. I can't tell you exactly one, but they were still a little bit new to it. When we took this project on and they were ambitious, they wanted to be at the absolute top of the market for a residential building in Jersey city.
And obviously, as any developer does, they wanted to maximize rentable square footage and get the most bang for their buck. And they had this requirement for the black box theater. You know, the project came with this with its approval, but it got a zoning bonus for having the theater in the base of extra height. It was a give back to the community that was written into the zoning, and we always knew it was going to be a theater, and we always knew it was going to be for a nonprofit arts group.
And that arts program as part of the building was in the DNA of the project from the very beginning, and informed a lot of the decisions moving forward became part of the personality of the building throughout, not just the theater itself, really.
00;07;17;03 - 00;07;23;18
DP
Vincente Quiroga discussed 29 Huron, a two tower development in Greenpoint, Brooklyn.
00;07;23;20 - 00;08;40;15
VQ (Vincente Quiroga)
The history of the site, you know, it's a long, narrow site. Our building massing is 100ft in the north south direction. It's over 500ft in the east west direction. So it's very distended and lengthened and narrowed. The original site was a one story warehouse, which was kind of the context of the neighborhood. I lived in that neighborhood many years ago, and that was the context.
The context is changing primarily because in a sort of Bloomberg era, there was up zoning plan, but then the 2008 crisis stalled those plans, and it took a while for that increase, zoning and development to come to fruition. And so we were part of that increased zoning for the site. In terms of the massing, we wanted to take a sense of the character that was there and honor that.
Not all the projects that we see built. Really take that into account. And we were thinking, what is the context now and what was the context in the past? So we really thought about selecting a one story podium and selecting brick as the foundation for that, and also being practical about the openings and where they are located. The emphasis for the target population would be families.
So large units, lots of two bedroom and three bedroom units, a lot of outdoor access and the views because of its waterfront proximity.
00;08;40;18 - 00;09;05;15
DP
Yeah, the site is unbelievable and you guys really take advantage of just about everything out there. It's a great project. So let's talk about the design. So first let's talk about the building stylistically. So to me it looks a lot like a very contemporary warehouse space right. So there's lots of glass. It almost appears lantern like in the photos that I saw at dusk.
It's beautiful.
00;09;05;18 - 00;09;34;00
VQ
The choice of the materials was very specific. The neighborhood has a unique grid orientation to the world, and so it captures the light in the sunrise and sunset, in particular the brick. We chose to be a rough molded brick with a dark mortar, and the metal panel has a mica flake to it that captures the light and changes throughout the day.
So some times it looks orange and coppery. Sometimes it actually looks bronze toned and it has a chocolate Sienna under glass to it.
00;09;34;07 - 00;09;42;01
DP
Each project faced unique challenges. 29 Huron is situated in a flood zone requiring innovative solutions.
00;09;42;04 - 00;10;20;28
VQ
The first story is about 17ft in height, and so there's some very high ceiling experiences there, ranging from 12 to 14ft ceilings within the amenities alone. And that also gave us the room to deal with some of the flood constraints as well. Being that the site is adjacent to the East River, the predicted flood zones right now are anywhere from 5 to 6ft above grade.
So that was a challenge and a constraint early on where we had to coordinate. We certainly decided we weren't going to excavate because of the high water table. So some of the functions that you would put in the cellar, we put a grade, but we often had to elevate the critical services six feet above where you normally would place them.
00;10;21;01 - 00;10;27;26
DP
So I'm curious, when you're digging that close to the water, do you get a lot of water, a lot of groundwater coming in when you're creating your foundation?
00;10;27;27 - 00;10;56;08
VQ
Yes. You do. Yes. Early on there was a lot of pile driving very deep anywhere from, I would say 30 or 40ft down. And those piles were linked up with large caps, pile caps, and then mat foundations at the towers. The slab itself, because of, you know, you have to think more like a boat or a bathtub. The slab itself was anywhere from 24in to 18in thick at various points throughout it, and it has to resist uplift.
00;10;56;11 - 00;11;01;27
DP
Well, that's really interesting. So when you're driving piles and there's a lot of bedrock, how do you do that?
00;11;01;29 - 00;11;21;04
VQ
The nature of the historic waterfront is often landfilled. So a lot of it is just trash or sediment. Over 200 years, people just dump things in the river. And it created a new shoreline, which was often the case, as you see in lower Manhattan as well. So we knew that we were going to have to go deep to hit rock.
00;11;21;10 - 00;11;25;28
DP
So you're driving the piles then 25 or 30ft in?
00;11;25;29 - 00;12;21;29
VQ
Yeah. And another challenge relating to the waterfront edges we had to deal with actually coordinate with the marine architect because the edge condition was failing and we needed to remediate it. So we coordinated a new driving a new sheet edge along the shore to create that. The site actually is interesting in that it has a natural cove condition that other areas along the waterfront don't.
And so we recreated that in the remediation. But we also worked with the landscape architect to create this, We're obligated by zoning to create a setback for public access on the site. So they really leaned into that curved cove condition that's set back and stepped it down to the water gradually from grade, and incorporated eco concrete blocks that have various pockets that allow kind of tidepool action to happen.
And so we thought about breaking down the shoreline a little bit and not just a hard edge.
00;12;22;02 - 00;12;31;12
DP
It sounds really interesting. I mean, when somebody owns a piece of property like that and it's really sitting on debris, in many cases, it's kind of unusual.
00;12;31;14 - 00;13;07;28
VQ
I mean, we tried to find opportunities to maximize the value of the site with the two towers strategy. We put lots of valuable floor area up high and took advantage of the views. We made double the amount of corner units that you could have by having a two towers. We also separated them over 100ft apart, so that the west tower really gets out there in front of other buildings that are it's alongside the east tower is a setback for the east to kind of get around other buildings that could obscure it.
And we were actually surprised at how good the views are as it was being built. We knew it was going to be good, but it actually turned out to be better than we anticipated.
00;13;08;00 - 00;13;14;27
DP
It's really beautiful about the design as the corners are opened up, then to become porches, right? Terraces. Is that correct?
00;13;15;00 - 00;13;34;04
VQ
That's right. So as part of that is a response to some zoning constraints. At a certain height, you also had to setback in multiple directions. And one of the things that we like to do is incorporate our balconies into the building facade and not just look like appendages. So we really took advantage of that setback rule and created these covered, protected balconies.
00;13;34;07 - 00;13;44;23
DP
The Lively was also situated in a flood zone, requiring solutions such as deployable barriers, elevated critical systems and flood resistant glazing.
00;13;44;25 - 00;14;09;02
JZ
The unique topographic feature would be that it's below the 100 year flood elevation. That's always a big deal. And the sidewalks there, I think are about five feet above sea level. So flood protection resiliency, ground floor uses. How do you enter the building? How do you avoid nuisance flooding when it's not a 100 year storm? Those were all big aspects of the design of the ground floor or the pedestrian experience.
00;14;09;05 - 00;14;10;16
DP
So breakaway walls?
00;14;10;23 - 00;14;40;01
JZ
There are deployable flood barrier systems designed in. So the flood elevation is seven feet above the sidewalk. In the event of a massive tech, a hurricane Sandy kind of thing, they would deploy these flood barrier systems. I don't know if you're familiar with them, but they keep them in storage and they come out and they both enter the building, or they spread them around the building.
They can be self-supporting, and they have to be deployed in a certain amount of time because it's an emergency response system. So a big part of all the projects in this area.
00;14;40;06 - 00;14;44;17
DP
And what about zoning codes? You had mentioned you had a height issue.
00;14;44;19 - 00;15;27;12
JZ
Yeah. So the building got, I think, 65 additional feet for having the black box theater in it. That was one zoning aspect. You can see the cantilever here over the sidewalk. There was a sidewalk widening requirement in the zoning. So that made it obviously challenging. You've got 17 stories of residences coming down over a cantilever that allows the sidewalk to be wider at the base.
That was an interesting challenge. There's a little bit of parking in the building that came from the zoning. So obviously some structural challenges there as well. Whenever you're putting that many residences over the top of a parking garage. The second floor here that you see through the window, that is also designated art space in the zoning also requirement.
00;15;27;14 - 00;15;32;26
DP
So I don't do tall buildings. How many extra floors to 65ft get you?
00;15;32;29 - 00;15;59;27
JZ
I think it was basically five because the top floor is an amenity space, rooftop amenity, which was specifically permitted by the zoning bonus. I think it really made the building, the massing and the expression of these mid-range buildings is a little bit tricky. They're not as tall as they want to be to be a tall building, and they're not as low rise as they want to be to be a low rise building.
And I think the extra stories really help to give it a little bit more verticality. It's a better piece of architecture for it.
00;16;00;02 - 00;16;03;22
DP
So tell us about the building plan. You said there's a sharp corner.
00;16;03;24 - 00;16;47;10
JZ
Yeah, very acute corner. There's two lot lines and it has a corner lot. So right where you have your corner window with two exposures, there's a very acute corner and I can't remember the actual degrees. But anytime you have a building it's not just the corner that's a problem. In fact the corner isn't really a problem. You may not be able to put a sofa in that corner, but the corner per se is not a problem.
It's kind of a cool room to be inside of, but what it means is that the apartments on each of those two different streets are on different geometries. And so if you're going to have a rectilinear apartment on streets that are at such different geometries that all crashes into each other at the corner and at the corridors and at the courtyards, so it becomes very challenging to plan buildings that feel sensible and projects that have this kind of site.
00;16;47;12 - 00;16;59;02
DP
The narrow, irregular site of The Lively, demanded creative massing strategies to optimize space while meeting zoning requirements and maintaining contextual sensitivity.
00;16;59;05 - 00;18;01;13
JZ
From its get go. There was never any question it was going to be a contemporary building. As far as where we drew our inspiration from and what we were looking at, you know, I mentioned the difficulty, the massing for these midnight buildings. I think the gathering together, the window openings into these vertical slots helps to emphasize the verticality of the building.
We have this prominent gold portal for the black box theater and the building entrance, and that became an idea that we repeated throughout the facade frame, these moments on the facade. And I think generally we try to be pretty rigorous about how the facades are designed. Obviously you've got structural continuity, but then you've got what always happens in residential design is you've got living rooms that are one width and you've got bedrooms that are a different width.
And so a strictly rational grid is probably not going to serve you well for a residential building the way it does for a commercial building. So you're often trying to find a way to manage that. If your interest is fundamentally and having a kind of rigorous and rational facade, you're trying to find a way to manage those partitions hitting the wall.
00;18;01;13 - 00;18;19;27
JZ
And what does that mean? And at the same time, I think creating a facade with movement and interest and dynamism and that play on the facade, I think was always an important part. And you could say it is part of the emphasis on the arts and the theater and dance, but also obviously just an interest in creating something fresh.
00;18;19;29 - 00;18;28;25
DP
At One Java for the project prioritized views and thoughtful use of materials which elevated the design and ensured long term durability.
00;18;28;28 - 00;18;56;15
JI
So the site's essentially just a rectangle. It's the size of a full city block, and on three sides on the north, the east and the south, we have streets. And then the west side is the waterfront. It's the East River. So the way that we've organized the buildings around the site is in this U-shape where they start up in the northwest corner, move around down West Street and then below, creating a view that opens up towards the water.
00;18;56;18 - 00;18;59;18
DP
So it's really all about the views, which it should be.
00;18;59;20 - 00;19;14;19
JI
Yes, it's something that it needs to be on the waterfront as well as it is about the views back into the neighborhood. We try to open up the view corridors from the building and leave as much view towards the water and towards the horizon from the rest of Greenpoint as we can.
00;19;14;22 - 00;19;24;13
DP
So tell us a little bit about the material choices. We've got a series of different materials and colors there. What were the decisions behind that?
00;19;24;15 - 00;20;16;04
JI
The building massing itself is broken up into five unique buildings, and out of those we have two towers that are precast, and those are the buildings on the waterfront. And then inland, there are three different buildings that range from ten stories to six stories. And those three buildings are brick, and that we really wanted to draw back from a lot of our inspirations in the Greenpoint community.
There's no shortage of brick precedents there. There's beautiful buildings such as The Astral, which is this queen in red brick terracotta building. There's Saint Anthony's Church, which is red brick and limestone trim. It's really beautiful, striking building. We looked towards kind of the history of the waterfront, those manufacturing industrial buildings, and used that precedent to define these brick colors, these three different brick buildings.
00;20;16;06 - 00;20;44;28
DP
So interestingly, the facades. So we've got the shorter or we've got the less tall architecture, which are brick buildings, and the facades are a series of what I'll call punctures with spandrel. It looks like spandrel brick in between each one of these vertically in between each one of the window openings. Correct? Yes. So how many studies did you guys end up doing to decide what these facades looked like?
00;20;45;00 - 00;21;23;17
JI
Everything kind of melded together. At some point, it's hard to break it down into a number because it was just this completely iterative process where we'd look at something, we'd make a model, we draw it, we'd look at it again, we'd make another model, we draw it. And this evolved from the concept, schematic designs all the way through to the construction document development.
This idea of the different brick details that actually came from wanting to streamline the project. So we use the same details on each of the brick buildings, but we remix them in each one. We use them in a different order to create a different identity for each of these.
00;21;23;19 - 00;21;40;29
DP
I think what's really interesting about these facades too, so you separate them facades into squares or rectangles, and then they have this very well. It looks subtle in elevation from far away, but it's actually a very large construction joint in between each one of these square rectangular panels. Correct?
00;21;41;02 - 00;21;56;02
JI
Yes. We use that construction joint and we overemphasize it. We use this double soldier coursing reveal tool as a way to further break up the massing and kind of imply this subdivisions within the buildings.
00;21;56;05 - 00;21;59;01
DP
And how deep is that, is that one brick thickness?
00;21;59;04 - 00;22;00;20
JI
It's two inches.
00;22;00;20 - 00;22;11;11
DP
Two inches. It's nice because when you look at the facade, I mean, it looks quite homogenous. But if you look at it a little bit more deeply, it's separated into these squares and rectangles. It's very pretty.
00;22;11;16 - 00;22;30;20
JI
Yeah. That's the effect that we really want to go for in terms of how this fits into the fabric of Greenpoint. We like the idea of there being this large scale massing that breaks down and continues to break down the closer you get, and it relates to more of your scale relative to the way that you're viewing it.
00;22;30;22 - 00;22;52;26
DP
You know, as an aside, what's really pretty, the red brick that you guys use there, there are a lot of lighter bricks in that facade, and so it makes it look almost pink in color, but you get up close to it and you can see a lot of variations in these colors in the red colored brick, a lot of like I'll call it value, but it's light and dark red brick.
00;22;52;29 - 00;23;57;04
JI
For that facade we're using a blended brick, and we wanted that to echo some of the red brick buildings that you already see on West Street, on the waterfront. That was kind of our launching point for coming up with this brick palette. We knew that there was going to be a red brick building. We knew that it was going to be relative to those warehouses.
And then the other two bricks were kind of an offshoot that based on how we wanted to frame this story of the building as you move around the site. So to the north, there's a lighter brick. It's something that we see as a little more modern. We try to keep the tones of the brick and mortar and the sills and other materials a little more homogenous.
And then on the flip side of that, on the southern street of the building, Java Street, we wanted to use something with a bit more variation. We wanted a higher contrast between the ground and the brick, a higher variability within the bricks. And that's something that we saw as a little more nostalgic to some of those worker housings and the smaller buildings that you begin to see as you move more inland.
00;23;57;07 - 00;24;41;16
DP
These mixed use projects demonstrate how brick and thoughtful architectural design can serve as a bridge between the past and future. By blending functionality with design, each project contributes to its community while addressing practical and esthetic goals.
Jeremy, John and Vincenet emphasize the importance of collaboration, innovation, and a deep understanding of site context in achieving these outcomes. Ultimately, these developments showcase how mixed use projects can create vibrant, connected urban environments, enriching neighborhoods through thoughtful integration of diverse uses and attention to detail in design and execution.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!
Design Vault Ep. 4 Morgan Parc with Gavri Slasky
ABOUT THE ARCHITECT:
|
Mr. Slasky started his career at SBJGroup as the project manager for an eleven story, 311 unit residential building in Long Island. Since then, together with Mr. Stephen Jacobs, he has designed and managed over 3 million square feet of residential new construction projects throughout New York and developed an expertise in the Building Codes of New York City and New York State.
A major focus of Mr. Slasky’s work is in Transit Oriented Development, where he seeks to strengthen historic town centers in the greater New York region with mid and high-rise multifamily and mixed-use buildings adjacent to commuter train stations. Mr. Slasky has piloted these projects from conception to completion, testifying at local municipality Zoning Boards, producing documentation for Building Department approval, overseeing construction administration and working together with the general contractor and owner in achieving building occupancy. As a testament to their success, two of these projects received the Long Island Smart Growth Award.
In New York City, Mr. Slasky has designed and managed high-rise hotel projects, and performs peer reviews on many SBJGroup projects for compliance with Building and Energy Code.
Mr. Slasky received his Masters in Architecture from Princeton University and his B.A. from Columbia University, majoring in architecture. Prior to joining SBJGroup, Gavri worked at Kohn Pedersen Fox on supertowers in Korea, megablocks in China and urban planning for the Boston Seaport and New York City’s Hudson Yards. |
|---|
ABOUT THE PROJECT:
The design of Morgan Parc is inspired by the best traditions of late-nineteenth and early-twentieth century mercantile buildings that were widespread throughout the northeast. Their major architectural features responded directly to the needs and functional requirements of the new industrial age and thus were a precursor to the modern movement which developed in subsequent decades. Their most distinguishing features included a repetitive, structural system that was often expressed on the exterior with brick piers that permitted the introduction of large windows that would maximize the amount of daylight required for the manufacturing process. Typically the exterior walls were built of brick, which at the time was the most utilitarian and economic material available. Very often the exuberance of the builders was expressed by intricate brick detailing that helped to humanize buildings that often have a scale to them. Morgan Parc is a U-shaped building opening up the site to Second Street. The building center is a courtyard and event space in the heart of Mineola. The building is composed of a central tower at the far side of the square, flanked by two symmetrical wings, gradually stepping down from Front Street to the more pedestrian Second Street.
The approach to the building is from Second Street through the paver drive in the courtyard. Arriving at the corrugated glass and steel porte cochere, one enters the double heighted residential lobby at the center of the building. The tall first floor is occupied by retail tenants that fronts onto the arcaded courtyard and retail valet parking. The parking garage entrance and exit are on Front Street.
The masonry facades draw upon turn-of-the-century mill buildings whose architecture is expressed in their strong deep structural piers and intricate brick detailing. The building façade is composed of deep articulated masonry piers that extend the full height of the building, opening up at the ground floor to create a retail arcade that wraps the courtyard. Large industrial size window units span between the deep piers, flooding the apartments with natural light. The building is capped by glass-enclosed rooftop amenity spaces, an outdoor pool and terracing roofs overlooking Long Island’s expansive landscape below. The cascading roofs will also offer a landscaped public area for the residents, as well as private terraces adjacent to the apartments. The building’s three cellars contain parking for the building’s residents as well as attended parking for the retail valet.
Morgan Parc
Gavri Slasky, SBJ Group
See MoreTRANSCRIPT
00;00;00;00 - 00;00;05;19
Doug Patt (DP)
Let's go inside the vault. The design vault.
00;00;05;21 - 00;00;28;06
Gavri Slasky (GS)
We were given the site. Needed to build as many units as we could, but to keep the center open and accessible to the public. This courtyard, this Village Green, was intended to be used by the Village for tree lighting ceremonies or other public events. The idea was to try to incorporate the public into the building as much as possible.
00;00;28;14 - 00;02;31;27
DP
This is my guest, Gavri Slasky. I'll share more about him shortly. In this episode from the Design Vault will highlight Gavri’s project Morgan Parc. The Morgan Parc Project is comprised of 267 residential units situated above retail space. The nine story building is composed of a central tower at the far side of the square, flanked by two symmetrical wings, the masonry facades draw upon turn of the century mill buildings whose architecture is expressed in their strong, deep structural piers and intricate brick details.
The building facade is composed of masonry piers that extend the full height of the building, opening up a ground floor to create a retail arcade that wraps a courtyard. Large industrial sized window units span between the deep piers. The building is capped by glass, enclosed rooftop amenity spaces, an outdoor pool and terracing roofs, which overlook Long Island.
Hi, I'm Doug Pat and this is Design Vault.
Today we're talking to Gavri Slasky, AIA, LEED AP. Gavri received his master’s in architecture from Princeton University and his B.A. from Columbia University in Architecture. Gavri started his career at Stephen B. Jacobs Group as the project manager for an 11 story 311-unit residential building in Long Island. Since then, together with Mr. Stephen Jacobs, he has designed and managed over 3 million square feet of residential new construction throughout New York and developed an expertise in building codes of the city and state.
Gavri specializes in piloting projects from conception to completion, testifying at local zoning boards, producing documentation for building department approval, overseeing construction administration and working together with the general contractor and owner in achieving building occupancy. Today, we're going to talk to Gavri about SBJ's Morgan Parc project. So welcome, Gavri.
00;02;32;00 - 00;02;34;00
GS
Thank you, Doug. Good to see you.
00;02;34;02 - 00;02;47;26
DP
And it's great to see you. It's nice to have you with us today. So, before we get started, tell us a little bit about Stephen B. Jacobs Group. Where are they located in New York? What's the size of the firm? And what type of work too they do?
00;02;47;28 - 00;03;38;20
GS
So, we are a mid-sized firm, about 30 architects and interior designers in Manhattan, where we're on Park Avenue South and 27th Street. So just north of the side iron building there. Our firm has been around for quite a long time. The founder of the firm, Stephen Jacobs, created the firm in 1967. So, it's been over 50 years. And the amount of work that he's done in New York is uncountable. So, over this time, you go to any street in New York and there's a building by SBJ Group.
For the most part, we specialize in multifamily housing. We've done quite a number of hotels and we've diversified recently into school buildings, commercial buildings, and we do quite a range of work.
00;03;38;23 - 00;03;46;15
DP
That's pretty impressive walking around New York City. Do you ever count on how many buildings they've done? Is it like a hundred? Like 200?
00;03;46;17 - 00;03;49;09
GS
No, there's definitely thousands, for sure.
00;03;49;10 - 00;03;50;04
DP
Oh, my goodness.
00;03;50;11 - 00;04;05;00
GS
We have this old Sanborn book, and every time that we got a project, I remember one of the former principals of the firm, Herb Weber, would just shade the lot in and so he would be able to flip through and keep track of it that way.
00;04;05;06 - 00;04;30;07
DP
Those Sanborn maps are pretty incredible. When I was at Penn State. My thesis was Housing for the Homeless in Times Square, if you can believe it. But I sent away for the specific Sanborn maps for that location, and I believe they were used by firemen. Yeah, they had to have been 75, 80 years old. They were updating at one point. I don't even know what they do today. Can you even get Sanborn maps?
00;04;30;14 - 00;04;48;05
GS
You can. Now, everything is digitally available. You have digital tax maps. They're super precise and updated. You can rewind history and go back to see what this looked like a decade ago or a hundred years ago and see how the site has evolved. Just a fun site analysis.
00;04;48;07 - 00;05;11;22
DP
Yeah. The maps have a footprint of the building at that particular location at the particular time, and then they have the heights of the buildings of various heights as you move around the building so you can literally build a model from them. So, tell us a little bit about yourself. So, this interview's pretty unique because you're in Israel and we oddly enough, know one another. Why don't you tell us a little bit about that?
00;05;11;25 - 00;05;15;22
GS
Yeah. It's great to see you. It's been almost 20 years.
00;05;15;23 - 00;05;17;15
DP
Oh, my goodness gracious.
00;05;17;17 - 00;05;35;14
GS
That's hard to say. The summer of 2004, I had just graduated Columbia. My teacher, Joeb Moore, offered me a summer internship at his firm in Greenwich. My seat was actually right next to your seat. I was wondering if you would remember me. It's been a long time.
00;05;35;16 - 00;05;45;20
DP
I do. I was like Gavry Slasky. Yes! I remember the name! It was a long time ago.
00;05;45;24 - 00;05;49;10
GS
It was. And to be fair, I was only there for a summer.
00;05;49;11 - 00;06;04;04
DP
So yeah. I joined Joeb in 1999, I believe, and I worked with him for about 20 years, 15 of those as a consultant. So, it was a great experience. He's an amazing architect, one of the most talented men I've ever met in my life.
00;06;04;07 - 00;06;09;26
GS
He's an amazing architect and such a kind person. Does such beautiful work.
00;06;09;28 - 00;06;21;15
DP
He does. If you're interested, Joeb Moore, joebmoore.com. Check it out. So how long have you been with Stephen B Jacobs group? Tell us more about your role in the Office.
00;06;21;17 - 00;06;22;13
GS
So I've been.
00;06;22;13 - 00;08;06;24
GS
At group for about a decade, and the first project I worked on, which he mentioned actually was in Mineola. It's not this Morgan Parc project. It was sort of the predecessor to this. We were working on a 300 plus unit apartment building, around the corner from this Morgan Parc project, called One Third Avenue, and that was my first project working with Stephen, and with this same client, Kevin Lalezarian.
That was a new experience for me. I had previously worked on single family homes. I worked for a year at KPF, so that was completely different, working on Super Towers in Asia. This was New York. This was something that was extremely practical. It's going to get built. It was going to get built, and fast. And the people in the office, they knew what they were doing. They done that type of work for a long time. So, it was quite a learning curve for me. That was a great project.
And during construction of that project, One Third Avenue, the client decided to go ahead with the second project around the corner from that. He had faith that he wouldn't be competing with himself. He'd be able to fill up all of his units.
We started designing Morgan Parc. That was such a rewarding project for me because I was on that from day zero, going with the client and Stephen to the Planning Board meetings and really seeing how a project starts from its conception, being in every single meeting, hearing how the building gets massed out, all the different considerations of it through the years of approvals and construction. And it opened about three years ago, during the pandemic, actually.
00;08;06;26 - 00;08;39;17
DP
So, let's talk a little bit about the building. Just as an aside, so I met Isaac Daniel Astrachan a couple of weeks back. He also works for SBJ. I was a host for a panel discussion here at the Brickworks Design Studio on 5th Avenue, and Isaac was on the panel talking about the Morgan Parc project. So, I know a little bit about it, but let's get into the details. So, you just explained how your office got the project. Your client wanted to do another building with you guys. Had SBJ worked with those clients for a number of years, even before the project you came in on?
00;08;39;20 - 00;09;13;28
GS
Yes. The Lalezarians are a family of real estate developers and property owners, second generation and repeat clients for us, as are many of our clients. That's what they do. They build buildings, they hold on to the buildings, they manage them, and we try to give them the best service that we can, be as efficient as possible and make the most beautiful building that we can with the budget. And they come back to us. That is basically the goal. So, most of our clients are repeat clients like that.
00;09;14;00 - 00;09;36;04
DP
Well, it's really impressive. It's the most important thing for an architect, right, to get word of mouth business. You're not marketing your company all the time. You've got a steady stream of people that are coming back to you after they get to work with you, you know, the first time. So that's wonderful to hear. So, tell us a little bit about the history of the location of Morgan Parc and what impact that might have had on the design.
00;09;36;08 - 00;10;24;05
GS
So, Morgan Parc is on a piece of property right in the center of Mineola, which is the seat of Nassau County. The property is right across the street from the train station, so it is uniquely located for a transit-oriented development. It is right in the center of their downtown.
Prior to our client owning the property, all that existed on that property was a single Citibank building and a sea of parking. Actually, during the construction of One Third Avenue that I mentioned before, our client, when he purchased the Morgan Parc property, moved the Citibank tenants into One Third Avenue building and making way for this second development.
00;10;24;08 - 00;10;25;12
DP
That's really interesting.
00;10;25;15 - 00;11;00;26
GS
It's located at the heart of their downtown right next to the train station. NYU Langone is right across the street there as well. So, it's a busy area. And on Mineola’s master plan from a few decades ago, this site was labeled as the village green. It was their sort of center, their downtown. But that was a sort of future hope that somebody would make that a reality. Village Green was actually a working name of our project until marketing came along and made it into Morgan Parc. But that was always in the forefront of the design.
00;11;00;28 - 00;11;05;24
DP
So, that's a good segway. So, tell us a little bit about the programmatic requirements from the client.
00;11;05;27 - 00;12;00;08
GS
We were given the site. Needed to build as many units as we could, but to keep the center open and accessible to the public. This courtyard, this Village Green, was intended to be used by the Village for tree lighting ceremonies or other public events. The idea was to try to incorporate the public into the building as much as possible – or when I say the building, the site. It's a large square shaped property. While it was a parking lot for Citibank, people would use it as a cut through, as a shortcut to get to the train station. And so that also became part of the program. The client wanted to maintain access, crisscrossing through the site so people can still get to the train station without having to walk all the way around the block. So, we created these openings between the different wings of the building so people can get from one side to the other.
00;12;00;11 - 00;12;02;21
DP
Describe the building plan to us then.
00;12;02;24 - 00;12;44;18
GS
It's a U-shaped building which has its tallest portion on the tracks, which is that front street. So it’s the back of the building. So that's a nine story structure at that point. It has the two wings of the “U” that gradually step down to six stories at Second Street, which is the downtown street.
The scale of the building respectfully interacts with the existing context there. The larger buildings that I mentioned at NYU and some other buildings are situated at the train tracks in that zone. And then the historic downtown is lower scale, three- or four-story buildings.
00;12;44;20 - 00;12;47;29
DP
So, you're a little bit of an expert on zoning codes.
00;12;48;01 - 00;12;50;29
GS
I've had my share of reading-
00;12;51;01 - 00;13;04;22
DP
Right! So, it sounds to me like a project like this, you really got pretty good at what's going on with the city – what the requirements are. So, tell us a little bit about the project restrictions for this particular job, maybe a little bit about the zoning codes.
00;13;04;25 - 00;13;39;19
GS
They don't quite have a zone sort of set up for this. So, what we had to do is go in and propose what it is that we wanted to build there – look around at other developments in that area and see what would be appropriate and then open that up to discussion to the public. And that project was in front of the planning board maybe four times. These meetings, which started about 7 p.m. or so, they would go till 11 p.m. they would have standing room only of people giving comments pro and against.
00;13;39;25 - 00;13;47;25
DP
Their local people come to the meeting, and they want to say what they think of the architecture. So, this is like an architectural review board, right?
00;13;47;29 - 00;15;02;11
GS
Sorta. You know, it's interesting because the comments were less about the architecture, more about planning, traffic, and heights of buildings and schoolchildren. So those were the major concerns that they had, but it was the democratic process. So, watching it play out, seeing everybody given the opportunity to have a voice, and through that process, the building changed as well. In reaction to that, the building got smaller.
And we were given the opportunity also to present the benefits of the building and what the building would be offering the city, because as we were designing this, this wasn't a building that we were designing in isolation from far away and imposing it onto the local town, but rather with the village of Mineola in mind constantly. And so, so much of the building was being built and designed not just for the residents but for the people of the town. And I used to go out there during construction every week or two and go to the coffee shop across the street and really got to see this downtown come together where there used to be, essentially, a hole in the middle of it with this enormous parking lot. The building has so many different facets to it, but the public side of it was really rewarding.
00;15;02;13 - 00;15;10;09
DP
Well, again, a good segway. Why don't you talk a little bit about the style choice and how it reflects or relates to the buildings that are around and in the neighborhood?
00;15;10;12 - 00;16;11;05
GS
So, when Stephen conceived of the design of this building, he was thinking of historic mill buildings, turn of the century factory buildings that were made of brick, that had large openings, had repeated structural piers. They were built in an efficient way, allowing for large openings to light up the factories where the work would be taking place in. And they were often clad in brick by masons who were extremely talented. And it's hard to find people of that talent today, but that was their craft.
So that was in the back of Stephen's head and a lot of the work that he did in the early period of his career in the late sixties, early seventies was adaptive reuse. He had taken these types of buildings and turned them into lofts, but at this point he was creating this new building that based off of its old historic model.
00;16;11;08 - 00;16;28;14
DP
So, when the clients came to you guys and you talked a little bit about aesthetics, did they give you any historical precedents or did they say, hey, this building has got to match the aesthetic of what's around it? And then maybe talk a little bit about your use of brick and why you guys chose that particular brick and that color.
00;16;28;17 - 00;17;47;13
GS
I had mentioned that these were repeat clients, so we knew them very well. We knew their tastes. We knew their preferences. They came to us, and they said that they wanted a timeless building, a building that wasn't a fad that would be dated in a decade or so. They wanted something timeless. They don't build buildings and then sell them. They build them, and then they keep them and maintain them as part of their portfolio. So, they were looking to create something for the long run.
So, I think at that point, Stephen started to think about these historic buildings that are so beautiful that they become historic landmarks and get adapted for one use, changing to another, use. I brought people to see this building after it was completed and they asked me, what was this building before? It's funny to think that this is a brand-new building, but I thought that that was actually quite a compliment. We are trying to emulate historic buildings. We never thought that we would be able to fool people that this was historic. That wasn't the intent, but it just fits. And when the client asked for timeless, I feel like that type of reaction from people that visit the building didn't know the site before. I feel like that accomplished the goal that the client was looking for.
00;17;47;20 - 00;18;28;19
DP
Yeah, Issac said the same thing when he was here that people had asked how long the building had been there, you know, after the building had been constructed. So interestingly, when you go to school, when you go to architecture school, one of the first things I learned was that the architect is striving for timelessness in their work, right?
Not all architects choose to do that, but at Penn State they talked about that a lot. I found it pretty interesting. I like to ask people that come in whether or not brick solved any design challenges or design problems for you guys. And clearly it did in this aesthetic realm. But can you think of any other way that you were able to use Masonry and it solved some design challenges?
00;18;28;22 - 00;19;51;00
GS
There's a lot of different facets of this building, but I think the brick is one of the key factors that brought this whole building together. It's a large building. There could have been other approaches to take using different materials to break up the mass, and you see that quite a lot around the suburbs. What Stephen wanted to do was to embrace that this was a large building and take one material, being brick, and use it as many ways as possible and unify the building, make one unified building out of it.
We worked on a few details. We worked on them and reworked them and got feedback from masons, reworked them again. We created a couple of unique shaped bricks. We were playing with all sorts of articulation, ins and outs and we ended up with a detail for the pier and detail for the cornice, a detail for a second-floor band – it was really about three or four typical details that we worked out. And then repeated it in a rhythm and executed it. And it was wonderful working with the masons on site as well, because as architects we can draw what we want, but at the end of the day it's all about the execution of the craftsperson. We were fortunate to have a great mason on the project.
00;19;51;07 - 00;19;55;05
DP
So, did you guys build actual physical mock ups that were out there?
00;19;55;07 - 00;20;18;10
GS
Yes, we did. We built a couple of mockups and made a couple of adjustments during that period. And then they started and they were able to start low down on the building, did a few portions, and then once they got those couple of details down, they're able to run with it. And it was a long process and a lot of brick, and the client had faith in it. I was very fortunate about that and it came out great.
00;20;18;12 - 00;20;38;12
DP
So, two quick questions about how long everything took. I'd like to think about how large is the set of drawings when you're going to build a building like Morgan Parc? Did you guys draw the thing in 2D and 3D? And how long did this whole process take? Through Planning, city review, design, and then construction.
00;20;38;14 - 00;21;42;03
GS
Great question. The way that we work, we work in 3D and 2D. At the same time, we usually model the building in Revit. We’ll work out the massing, the elevations, study different details in three dimensions and color, testing out different color combinations. We had gone back and forth on whether the windowsills should be metal or cast stone or brick. And we tested out these options in three dimensions and 3D models.
The working drawings at the end of the day were all done two dimension CAD, and they were, you know, as precise as we could get. It's actually interesting. The building is a U-shaped plan, but it's two Ls that are joined at the center to make this U-shaped. So, the building is actually mirrored down that center. So, we were able to draw it, one L, and mirror it. That was part of my struggle over the years, was to try to keep it as symmetrical as possible so that we can keep on using that for efficiency.
00;21;42;06 - 00;21;45;16
DP
That's pretty cool. So, you really only had to draw half the building, right?
00;21;45;19 - 00;21;47;11
GS
For the most part.
00;21;47;13 - 00;22;13;14
DP
I'm sure there's way more that goes into it, but when you first say that, you say, Oh wow, that's pretty cool. So, the thing is simply mirrored. I'm sure there's a lot of differentiation that goes from one L to the other, but it's pretty interesting.
So, what's, kind of, top of mind for a lot of people today is sustainability. Did you guys talk about that at all in terms of using masonry, or was that a request that the client had that you guys had to keep in mind?
00;22;13;19 - 00;24;17;16
GS
Sustainability is something that's viewed in every project that we do in one sense or another. Brick buildings allowed for a cavity wall and continuous insulation on the exterior of the backup wall. And so, it allows for a beautiful finish, but a very sustainable envelope. And the amount of insulation that you put in that cavity wall is really dependent on how large of a relieving angle you can get for the brick because the more insulation you have, the further the brick has to be on the backup wall. That's sort of the only limitation.
00;22;52;09 - 00;22;54;03
DP
And what did you guys end up doing?
00;22;54;04 - 00;24;17;16
GS
Yeah, it's been a couple of years. I don't remember exactly. We put as much as we could. We put insulation on the inside as well.
This is not exactly related to brick, but one of the most interesting, sustainable anecdotes from this building that I remember is in the excavation of the building. Long Island is built on sand primarily, and it's a great site for foundations to build shallow foundations. The sand takes the load, but another advantage of it was the contractor who excavated out the sand, and I don't know how many hundreds or thousands of truckloads of sand have to go out of this building – I didn't even mention that the building has three cellars for parking – so they went down 30, 40 feet into the ground for the entire site. So maybe a million and a half cubic feet.
The contractor who was excavating that, taking that sand away, sold that sand to a construction company for concrete. So concrete is a very carbon heavy building material. But what I like to think about was that the sand in the foundations in the site for this building, actually went back into the building process. I'm sure it didn't go to our building. It probably went to someone else's, but it wasn't just shipped off to someplace and dumped somewhere.
00;24;17;24 - 00;24;39;16
DP
We always have interesting experiences, right? So, was there anything as you went through this process of building Morgan Parc, designing it and ultimately going through the various stages with the town, with the city, then getting the thing built? Was her anything that you or your team learned that was really interesting for you? It was kind of a first.
00;24;39;19 - 00;25;48;27
GS
There's so many firsts. Every building process is a learning experience. There's this one lesson learned that was interesting. It was during the brick installation, actually. I noticed that there was this one detail at the corner of the building that wasn’t correct, and I was wondering how could they make that mistake?
It doesn't have the usual frame around it. The brick checker pattern just died into the side and I looked at our drawings and then I realized that the elevation was taken with a pier, hiding a portion of the elevation behind it. And so, it looked like that was the end of the building, but it actually continued another foot or so. And the mason was looking at the elevation and they didn't see that.
So, they just continued the same pattern until the end that maybe they thought there was a dimensional mistake or something. So, every week I would go to them and say, are you going to fix that detail? And he was like, at the end. And I was thinking to myself, oh, you better fix that at the end before Stephen comes to take a look at that. But he did. And that was an interesting lesson learned – to make sure that every elevation is drawn, nothing is being hidden by any portion of the building in and of itself.
00;25;49;00 - 00;26;36;13
DP
Well, I think about that a lot, I go out on to the job site and I see something and it's not exactly the way I had drawn it. And sometimes you're just not paying attention, sometimes I didn't cover it well enough in the drawings and unless you're out there on a weekly basis, these things just completely get away from you.
So, one last question before you go. This is very interesting to me. So, you're an expert on zoning and building codes. So, this is an incredibly valuable asset for any office. I would imagine at some point you could probably become an attorney with all the knowledge that you have. Was that something that you always gravitated toward that side of the business over time, or is that just you were kind of thrown into it? It was interesting to you. You were good at it, and that's how it evolved.
00;26;36;16 - 00;28;25;23
GS
It's funny, it's not the part of architecture that people are usually interested in, and it definitely wasn't so in the beginning for me. But the more I read through these things, the zoning – New York City, or every different town has their own zoning ordinances - there are so many nuances there, and these words that are written down there were written very carefully, and they create what you're building is going to be. And so, careful reading through these documents are critical, whether it's zoning or building code. And I came to really enjoy creating it. And it is probably the dorkiest thing, but I enjoy it and I enjoy getting emails or calls from colleagues saying, “Gavri, can you check what are we allowed to do here?” I love being able to look it up and learn. Each time I look at it, I learn more and then the codes change from 2008 to 2014, New York City now 2022, and New York State has their own codes. And then to compare in New York City versus New York State and to see what's allowed in one versus the other. They don't tell you why in these things, they just tell you what's allowed or what's not allowed.
You try to think about what is a consideration, what's the difference between New York and New York City in New York State. So, New York State has larger sites. So, their stair cores are allowed to be further away from the center. They try to direct people to have their egress stairs at the edges of the building. The dead end distances are shorter than they are in New York City. In New York City, they allow you to have scissor stairs in residential buildings because you have a small footprint and you don't really have much of a choice. These rules, they end up shaping the plan. They end up shaping every aspect of the building.
00;28;26;00 - 00;28;39;28
DP
Well, Gavri, I can tell you really love this stuff. And I'm sure Stephen B. Jacobs Group is very happy to have you. So, thank you very much for spending some time with us today. Where can people go to learn more about SBJ architects?
00;28;40;01 - 00;28;49;00
GS
Yeah, you can go to our website sbjgroup.com.
We are on 27th and Park Avenue South. Looking forward to hearing from everybody.
00;28;49;07 - 00;28;51;08
DP
It's a small world, man. It’s great to see you.
00;28;51;10 - 00;28;53;12
GS
It's great to see you, Doug. Thank you so much.
00;28;53;18 - 00;29;21;00
DP
Thanks, Gavri.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!
Design Vault Ep. 29 29 Huron with Vicente Quiroga
ABOUT THE ARCHITECT:
|
Vicente is a project manager with over 10 years of experience and a diverse portfolio encompassing various building typologies, the restoration of historic structures, complex interior layouts, and both public and private work. He is currently managing the construction administration of 1 Huron—a 266,000-square-foot multifamily building with ground-floor retail and a generous package of high-end amenities located along the East River within Brooklyn’s Greenpoint neighborhood. Based on his involvement in the design of the project, Vicente has an intimate understanding of New York City's building codes and requirements related to waterfront development and building within flood zones. |
|---|
ABOUT THE PROJECT:
The building is defined by 2 13 story towers connected by a shared lobby whose step forms narrow on the higher floors. The two tower massing maximizes unobstructed views across the East River, taking advantage of its exceptional waterfront location. Due to the building's location in a flood zone, Morris Adjmi coordinated closely with consultants to provide active flood protection solutions such as deployable flood barriers, temporary stairs, flood vents and flood resistant glazing at storefronts. Located within the building's podium, many of the Huron's amenity spaces fall within the design flood elevation, including the indoor pool. Flood resistant glazing within these spaces maintains transparency. The building's glass and steel towers reflect Greenpoint's industrial heritage, while the rough brick podium is inspired by the materials and scale of surrounding warehouses. The heavily gridded facade is comprised of a window wall system featuring I-beam profiles on the pillars.
TRANSCRIPT
00;00;00;02 - 00;00;05;10
Doug Pat (DP)
Let's go inside the vault. The design vault.
00;00;05;12 - 00;00;31;14
Vincente Quiroga (VQ)
We actually decided early on that we would adopt the one story podium and also set back sooner than we actually needed to. It increases the lighting there allows for breezes that blow through. It also allows for multiple outdoor terracing to happen. So those units that aren't particularly high and don't have the same views can step out onto your terrace and see the water.
And so really maximizes the value and effectiveness and the quality of those spaces.
00;00;31;16 - 00;01;05;23
DP
This is my guest, Vicente Quiroga. I'll share more about him shortly. In this episode from the Design Vault we highlight, Vicente’s project 29 Huron in Greenpoint, Brooklyn. The Huron is a mixed use multifamily 13 story 266,000 square foot building with ground floor retail and high end amenities. In order to account for the narrow site geometry and flood zone, multiple massing schemes were studied with an objective to maximize height and floor area distribution and prioritize views.
The building is defined by 2 13 story towers connected by a shared lobby whose step forms narrow on the higher floors. The two tower massing maximizes unobstructed views across the East River, taking advantage of its exceptional waterfront location. Due to the building's location in a flood zone, Morris Adjmi coordinated closely with consultants to provide active flood protection solutions such as deployable flood barriers, temporary stairs, flood vents and flood resistant glazing at storefronts. Located within the building's podium, many of the Huron's amenity spaces fall within the design flood elevation, including the indoor pool. Flood resistant glazing within these spaces maintains transparency. The building's glass and steel towers reflect Greenpoint's industrial heritage, while the rough brick podium is inspired by the materials and scale of surrounding warehouses. The heavily gridded facade is comprised of a window wall system featuring I-beam profiles on the pillars.
Hi, I'm Doug Pat and this is Design Vault. Vicente is a registered architect and project manager at Morris Adjmi Architects in New York City. He holds a Bachelor of Arts in Architecture from New York University and a master of architecture from the City College of New York. He has a diverse portfolio encompassing various building types, such as historic renovations, interiors, hotels, art exhibition spaces, educational facilities and high end residential buildings in the Northeast, the United Kingdom and Spain.
Vicente also has a broad and unique understanding of New York City's building codes and requirements related to waterfront development and building within flood zones. He's currently managing the Construction Administration of 1 Huron on a 266,000 square foot multifamily building along the East River in Brooklyn's Greenpoint neighborhood. Prior to joining Maurice and me, Vicente worked on public restoration projects for the New York City School Construction Authority and the New York City Department of Design and Construction.
So welcome, Vincente. It's nice to have you with us today. Now, for those of you listening who have not heard our interview with Michelle Wagner from Morris Adjmi during the first season. Vicente, could you tell us a little bit about the firm? So where are you guys located? What's the size of the firm? How long has it been around and what kind of work do you do?
00;03;38;11 - 00;04;12;25
VQ
We're based in New York City, near the financial district and Wall Street. We also have a New Orleans office as well, because Morris is originally from there. So we have a broad practice, decades of experience, really working first in New York, and particularly in landmark districts and contexts as well as broadening that to sort of a national practice and also very holistic practice involving urban design, placemaking architecture, interiors, furniture and art services.
The New York office is approximately 70 people, and I think we have about 10 to 20 people in the office as well.
00;04;12;27 - 00;04;18;07
DP
So how long have you been with Morris Adjmi? How long have you been a registered architect and what do you do there?
00;04;18;10 - 00;04;58;00
VQ
So I've worked for about six years there and I've been a registered architect for 12 to 13 years in practice. Prior to that, over 15 years of experience since graduate school. So my role is project manager and flex project architect position, just really responsible for anything and everything to do with the project from client management, coordination, staffing, everything, being accountable for the project throughout the life of it.
And this one in particular has been special because, you know, in a large practice you often inherit projects or people come and go. This project for me has been involved since day zero through completion, so it's very special to me.
00;04;58;07 - 00;04;59;16
DP
And how long has it been?
00;04;59;19 - 00;05;10;24
VQ
Started in 2018, so, you know, approximately five or six years. Some of that was due to the pandemic. There is some slow down pausing during that time where it would have sort of completed a little bit faster.
00;05;10;27 - 00;05;18;03
DP
So most architects at Morris Adjmi are with one project the entire way through and are working on other jobs at the same time.
00;05;18;09 - 00;05;31;02
VQ
Everyone's multitasking. I myself have about six projects actively in different stages of a construction administration or schematic and design development as well. We like to flex our brain.
00;05;31;05 - 00;05;33;02
DP
And how do you like being a project manager?
00;05;33;09 - 00;06;04;25
VQ
It's good. It's a very challenging role because you're juggling practical logistics as schedule and staffing and the finances, but you're also deeply involved with building the client relationship and trust and working with the team to get to the milestones of the project and deliver what you're trying to do, but also take a higher view and really emphasize what are we trying to do here?
What is the objective from a practical standpoint to meet their needs of the project, But also what is the design move? What's the inspiration? What are we trying to do and maintain that throughout the life of the project, which isn't easy?
00;06;04;27 - 00;06;08;14
DP
No, it's not. And how big is the team for the Huron Project?
00;06;08;21 - 00;06;41;06
VQ
It's ebbed and flowed. At some points you have ten people during extensive documentation process. During CA, I think we have about five people. It's particularly because it has extensive interiors. We've staffed sort of an architecture team as well as an interiors team, and then they also have taken on the furnishings and art for the project. So we have over 30,000 square feet of interior amenity with pools and meeting rooms and kids rooms, as well as some outdoor activities where we also collaborated with the landscape architects. So there's a lot of things going on.
00;06;41;09 - 00;06;43;06
DP
And how did your office get the job?
00;06;43;08 - 00;06;59;03
VQ
Well, we were selected from a RFP process with the client. They had tried to develop it into a different solutions in the past and weren't very happy with those studies. So they approached us in a feasibility concept phase to sort of see what they could do as of. Right.
00;06;59;06 - 00;07;00;27
DP
And did you guys know the clients?
00;07;01;00 - 00;07;27;12
VQ
We knew them. It's really our first project with them. We've heard of them before. The client is interesting in that they have a range of experiences of multifamily and hospitality projects in their portfolio and they're also client. That's up for a challenge. You know, the site dimensionally was challenged, the site conditions in terms of remediation of the industrial sites and also its waterfront access, those are all challenges to the design that they were up for.
00;07;27;14 - 00;07;33;25
DP
So tell us a little bit about the history of the location of the site. What was going on there before you guys got there?
00;07;33;28 - 00;08;39;17
VQ
The history of the site, you know, it's a long, narrow site. Our building massing is 100 feet in the north south direction. It's over 500 feet in the east west direction. So it's very distended and lengthened and narrowed. The original site was a one story warehouse, which was kind of the context of the neighborhood. I lived in that neighborhood many years ago, and that was the context.
The context is changing primarily because in a sort of Bloomberg era, there was a zoning plan, but then the 2008 crisis stalled those plans, and it took a while for that increased zoning and development to come to fruition. And so we were part of that increased zoning for the site. In terms of the massing, we wanted to take a sense of the character that was there and honor that.
Not all the projects that we see built really take that into account. And we were thinking, what is the context now and what was the context in the past? So we really thought about selecting a one story podium and selecting Brick as the foundation for that, and also being practical about the openings and where they're located.
00;08;39;20 - 00;08;45;24
DP
Right. So that's a good segue to my next question. So what was the scope and the programmatic requirements for the project?
00;08;45;27 - 00;09;00;14
VQ
For a residential project to build as of right and the emphasis for the target population would be families. So large units, lots of two bedroom and three bedroom units, a lot of outdoor access and the views because of its waterfront proximity.
00;09;00;17 - 00;09;25;13
DP
Yeah, the site is unbelievable. And you guys really take advantage of just about everything out there. It's a great project. So let's talk about the design. So first let's talk about the building stylistically. So to me it looks a lot like a very contemporary warehouse space, right? So there's lots of glass. It almost appears lantern like in the photos that I saw at dusk. It's beautiful.
00;09;25;16 - 00;09;53;28
VQ
The choice of materials was very specific. The neighborhood has a unique grid orientation to the world, and so it captures the light in the sunrise and sunset, in particular. The brick we chose to be a rough, molded brick with a dark mortar and the metal panel has a mica flake to it that captures the light and changes throughout the day.
So sometimes it looks orange and copper. Sometimes it actually looks bronze toned and it has a chocolate sienna undertones to it.
00;09;53;28 - 00;10;05;23
DP
I noticed that in the photographs that the metal definitely takes on a bunch of different colors. So let's back up a little bit. Let's talk about the project restrictions, zoning, any historical requirements for you guys?
00;10;05;26 - 00;10;56;16
VQ
So the site isn't within a landmark district, but as our office really emphasizes context in our practice. So even when there's not those kind of historical restrictions, we like to start there and say, what does it want to be? And so we actually decided early on that we would adopt the one story podium and also set back sooner than we actually needed to.
First, to take a cue from that one story warehouse context, but also how that kind of massing relates to the street and the experience of the street. It increases the light and air and allows for breezes to blow through. It also allows for multiple outdoor terracing to happen. So those units that aren't particularly high and don't have the same views can step out onto your terrace and see the water.
And so really maximizes the value and effectiveness and the quality of those spaces.
00;10;56;19 - 00;11;05;22
DP
So let's talk a little bit about the building and plans. I'm assuming it's along because the lots a long rectangle, the building matches that although it steps back.
00;11;05;24 - 00;11;47;08
VQ
It steps back immediately after the first story. The first story is about 17 feet in height. And so there are some very high ceiling experiences there, ranging from 12 to 14 foot ceilings within the amenities alone. And that also gave us the room to deal with some of the flood constraints as well. Being that the site is adjacent to the East River the predicted flood zones right now are anywhere from 5 to 6 feet above grade. So that was a challenge and a constraint early on where we had to coordinate. We certainly decided we weren't going to excavate because of the high water table. So some of the functions that you would put in the cellar, we put a grade, but we often had to elevate the critical services six feet above where you normally would place them.
00;11;47;10 - 00;11;54;05
DP
So I'm curious, when you're digging that close to the water, do you get a lot of water, a lot of groundwater coming in when you're creating your foundations?
00;11;54;05 - 00;12;22;21
VQ
Yes, you do. Yes. Early on there was a lot of pile driving very deep anywhere from I would say 30 or 40 feet down. And those piles were linked up with large caps, pile caps and then mat foundations at the towers. The slab itself, because of, you know, you have to think more like a boat or a bathtub.
The slab itself was anywhere from 24 inches to 18 inches thick at various points throughout it. And it has to resist uplift.
00;12;22;23 - 00;12;28;07
DP
That's really interesting. So when you're driving piles and there's a lot of bedrock, how do you do that?
00;12;28;10 - 00;12;47;14
VQ
The nature of the historic waterfront is often landfill, so a lot of it is just trash or sediment over 200 years people just dump things in the river and it created a new shoreline, which was often the case, as you see in lower Manhattan as well. So we knew that we were going to have to go deep to hit rock.
00;12;47;20 - 00;12;50;29
DP
So you're driving the piles then 25 or 30 feet.
00;12;50;29 - 00;12;51;18
VQ
Exactly.
00;12;51;18 - 00;12;52;09
DP
I got it.
00;12;52;09 - 00;13;48;10
VQ
Yeah. And another challenge relating to the waterfront edge is we had to deal with actually coordinate with a marine architect because the edge condition was failing and we needed to remediate it. So we coordinated a new driving a new sheet edge along the shore to create that. The site actually is interesting in that it has a natural cove condition that other areas along the waterfront don't.
And so we recreated that in the remediation. But we also worked with the landscape architect to create this. We're obligated by zoning that create a setback for public access on the site. So they really leaned into that curved cove condition that's set back and stepped it down to the water gradually from grade and incorporated eco concrete blocks that have various pockets that allow kind of tide pool action to happen.
And so we thought about breaking down the shoreline a little bit and not just a hard edge.
00;13;48;12 - 00;13;57;21
DP
It sounds really interesting. I mean, when somebody owns a piece of property like that and it's really sitting on debris, in many cases, it's kind of unusual.
00;13;57;24 - 00;14;34;06
VQ
I mean, we tried to find opportunities to maximize the value of the site. With the two tower strategy. We put lots of valuable floor area up high and took advantage of the views. We made double the amount of corner units that you could have by having a two towers. We also separated them over 100 feet apart so that the West Tower really gets out there in front of other buildings that it's alongside.
The East Tower is set back for the east to kind of get around other buildings that could obscure it. And we were actually surprised at how good the views are as it was being built. We knew it was going to be good, but it actually turned out to be better than we anticipated.
00;14;34;09 - 00;14;41;08
DP
It's really beautiful about the design as the corners are opened up then to become porches, right? Terraces, is that correct?
00;14;41;10 - 00;15;04;06
VQ
That's right. This is part of that is a response to some zoning constraints is at a certain height you also had to step back in multiple directions. And one of the things that we like to do is incorporate our balconies into the building facade and not just look like appendages. So we really took advantage of that setback rule and created these covered protected balconies.
Also, it's quite windy, so that coverage helps screen it a little bit.
00;15;04;08 - 00;15;08;14
DP
So an open terrace meets the setback requirements then?
00;15;08;21 - 00;15;09;04
VQ
Yes.
00;15;09;07 - 00;15;13;25
DP
Wow, that's really interesting. So did you guys max out the building height then?
00;15;14;01 - 00;15;36;14
VQ
Yes, we had a R six zoning. We were adjacent to R eight. So there's some taller buildings in the surrounding area. But we did try to sort of maximize it. Part of also with the flood zoning, when you have extreme water table situation, you are allowed to increase up to a certain height. So we were able to utilize the various zoning restrictions to our benefit.
00;15;36;17 - 00;15;39;19
DP
So how long did the building review take with the city?
00;15;39;26 - 00;15;57;14
VQ
Well, certainly just even the public park portion we started in 2008. It probably took a year and a half to two years alone. At the same time, we were overlapping with our design and documentation, so it probably took another two years to really finish all the documentation.
00;15;57;17 - 00;16;09;00
DP
So let's talk a little bit more about the parameters for the building materials and the use of masonry, which from what I can tell from the photos is at the base and then the circulation tower, is that correct?
00;16;09;02 - 00;17;40;06
VQ
The circulation towers are actually stucco with a color to match the metal panel facade. They were really thought of as almost like a concrete massing for the podium. We selected a Glen-Gery Brick that was a molded modular brick. It has orange undertones and some brown tones as well along its finish, and it's a bit city, and we specifically selected it for its character.
It has texture, it catches the light in an interesting way. It's a very practical brick. And so we tried to think about just in the same way that we thought about the rest of the massing and even some of the interior design elements is to marry a practical industrial esthetic that was indigenous to the neighborhood, but also elevated and make it a bit of a luxurious esthetic as well as a hybrid.
So we selected the brick, we selected a dark mortar and did simple moves with the design in terms of let the program and the adjacencies define where those openings wanted to be, because again, 500 feet, we weren't over doing the modulation of that. We really wanted it to say this is where the windows want to be based off of the function of the plan.
And when we knew where those openings would be, we also decided upon simple detailing, corbelling of 1 to 2 inches stack stretcher, bond patterns, soldier brick patterns, which would have been indicative of the kind of twenties, thirties or earlier warehouse context. You know, again, just trying to tie it back to what would have been if it had been built 100 years ago.
00;17;40;08 - 00;17;50;25
DP
Well, I noticed there's a really pretty detail where you're setting the masonry back from the facade to create a reveal for the headers and for some of these openings.
00;17;50;28 - 00;18;03;17
VQ
Yes. And it creates a lot of interplay of light and shadow along the facade. And that was always thought about, you know, how do you deal with such a long facade that would have a lot of opacity to it, but create interest in that opacity.
00;18;03;19 - 00;18;05;17
DP
So did you guys draw the building in BIM?
00;18;05;17 - 00;18;06;17
VQ
Yes.
00;18;06;24 - 00;18;07;29
DP
You guys work in Revit?
00;18;08;04 - 00;18;10;12
VQ
Yeah, we're predominantly a Revit office.
00;18;10;14 - 00;18;19;08
DP
So the studies that you did initially, did you guys draw the whole building in 3D and then show the clients and so they got to see the model? Or did you guys build a physical model too?
00;18;19;10 - 00;18;43;16
VQ
We always start with the Revit process because it has its advantages, sort of quick moves and early viewing studies as well as planning. We did some early models, for the sales we did a full scale model of the whole building as well as the interiors. There's actually a drawer that pulls out of the base of the model and you can see all of the amenities articulated, which is incredible.
00;18;43;18 - 00;18;51;25
DP
Again, I'm curious how large of a set does a project like this create? How many pages just for architecturals?
00;18;51;27 - 00;19;11;26
VQ
That was always a challenge for the documentation was the East West Towers had their own articulations. Between the architectural division and the supporting engineering divisions, we had four volumes of documents just on drawings alone, and I want to say the architectural volume was easily 100 sheets or more unto itself.
00;19;11;28 - 00;19;24;27
DP
Another detail I really like is the exterior facade. So you made the piers and to some extent the floor slabs as they’re exposed on the exterior. It's not really a slab, it looks like steel. It's a really pretty detail.
00;19;24;29 - 00;19;50;24
VQ
Yeah, it's a simple C channel profile that's in ACM, Aluminum Composite Metal panel, and it's an open range screen. We really worked with our facade consultants and structural to simplify the detail as much as possible and maximize the windows. You know, again, this project, by its site positioning and daylighting it wants big windows. So we wanted to coordinate that with slab covers and the column covers.
00;19;50;26 - 00;20;01;15
DP
So could you give me more of an idea of how that open rain screen works? I mean, when I'm looking at the exterior photographs does not look like a rain screen at all. I mean, it looks like an enclosed system.
00;20;01;17 - 00;20;35;18
VQ
The profile clips the slab edge and tacked on to a fin that is part of the window wall extrusion. And that sort of stabilizes the top and bottom relationship and sets the datum for every floor and at every joints we leave it open behind that paneled system is a mineral wall assembly and waterproofing behind that and at the open joints, we coordinated with the shops to return the finish and bend, partly to stiffen the profile, but also finish it off and create a sense of closure.
00;20;35;20 - 00;20;40;20
DP
And what would be the advantage of doing a rain screen versus doing a closed system there?
00;20;40;22 - 00;20;56;05
VQ
It was more practical from an installation and sequencing standpoint and also just maintenance, you know, tall buildings, having to deal with caulking and repairing it later. It's a challenge and you have to think about that for clients’ maintenance. You know, it's a real concern.
00;20;56;07 - 00;21;32;06
DP
Yeah. I'm just getting myself familiar with rain screens. I'm behind residential work and we did a rain screen for my most recent home in New York State and was a real education. It's such an interesting system and I would say I think I tested on it for some CE units that I took maybe a couple of years ago and I thought, Wow, this is a really interesting idea where the facade is actually wide open in some ways and water's allowed just kind of move through it, dry back out again.
You're eliminating a lot of challenges long term by using rain screens.
00;21;32;08 - 00;22;01;14
VQ
I actually have an extensive experience from my school construction authority days of working on rain screens that we often would take existing schools that are 100 year old buildings that were solid wall assemblies, and we found water infiltration. We would take back the finish to the back up and create narrow cavity drainage plains with brick or precast or GFRC elements.
It's definitely in my wheelhouse to work in that context.
00;22;01;17 - 00;22;19;29
DP
It makes perfect sense to allow a wall to dry out rather than capture water behind the facades. All right. But it took us hundreds of years to figure this out. Very interesting. So you guys drew the building in BIM. You have the 3D model. How long have you guys been working in Revit?
00;22;20;01 - 00;22;22;00
VQ
15 to 20 years at least.
00;22;22;03 - 00;22;34;21
DP
Again, I'm kind of curious as an offshoot to this discussion. When you hire people, do you hire people who do not know how to use Revit? Maybe they've used Micro Station or they use ArchiCAD or AutoCAD and then you train them.
00;22;34;28 - 00;23;20;13
VQ
It's ever more common for them to have experiences these days. I actually didn't know Revit when I started, and that was a learning experience for me. You know, it has its pros and cons, you know, if you're an old school CAD person, but I value its ability to, you know, you move a wall, it moves everywhere. You don't have to constantly track that element.
And also when we're doing design options for large complicated projects, thinking about, well, what if the window appears or this dimension or that dimension, we can iterate and quickly deploy changes, you know, especially this day and age where you're dealing with value engineering, they come back with bids, you say, it's got to come out of somewhere. It's an important tool to be able to pivot and retool the design, adapt the design to accommodate these requirements.
00;23;20;15 - 00;24;10;27
DP
It's a really good point for those of you who don't know what BIM is, it's building information modeling, so you're giving lots of information up front to building parts like walls and plan, for example. And initially, at least in my experience, it takes a lot longer to draw something in the beginning, but you've got all that information in there.
So Vicente is explaining that what happens is when you need to make a change, the change is really quick because you're just changing one thing out of a series of pieces of information that you've already kind of filled in. So BIM has really changed the business over the last 15, 20 years. So do you guys learn anything interesting through the design and construction process? Maybe something you'd never dealt with before in terms of details or dealing with the client or the?
00;24;10;27 - 00;25;39;01
VQ
GC Well, certainly that flood design is evolving. We came up with some strategies that even the rules have changed since we started this project. So it's constantly evolving target and some of the forecasted flood elevations have changed across time. So that's something that's an ever evolving discipline of knowledge and thinking about active systems versus passive systems. You know, this building relies on a mixture of passive and active systems, some that the building is set up or either elevated spaces or the wall assemblies set up to resist water, the force of water in other elements, it's relying on staff.
We're trained to deploy solutions that are either barriers or stairs to reduce that access throughout the building. And that's a big challenge with any project that's in a flood zone is egress, space planning services and also mitigating cost. The developer and the clients and the residents ultimately will want to experience these views. But those views are difficult if we're anticipating flooding.
Nobody wants to have windows that are six feet off the ground. We were selective in where we put our efforts and said these areas are going to have the views. We're going to coordinate flood resistant glazing there. The same thought process at the commercial retail and lobby. You know, the places that it mattered. We wanted to maximize the glass. In other areas, we dialed it back down to really use opaque assemblies to articulate the design.
00;25;39;04 - 00;25;42;16
DP
So I mentioned deployable flood barriers. What is that?
00;25;42;18 - 00;26;21;26
VQ
I think of them like Lincoln Logs. Well, there's a range of options out there, but they are often aluminum extrusions that gasket together and stack along channels and they'll go to whatever height that is necessary. They often have back bracing or steel or aluminum sections. Those elements either are built into the facade already or tie back into anchor points that really transfer the loads to the structure.
It's a very complicated interaction and coordination of the design that you want these facade protection elements, the superstructure and waterproofing, you know, it all has to work and it takes a lot of effort.
00;26;21;28 - 00;26;25;28
DP
So what happens to that barrier when there is a flood? Do they break away?
00;26;26;00 - 00;26;27;17
VQ
They resist. They act as a wall.
00;26;27;17 - 00;26;28;21
DP
Resist. Okay. Yeah.
00;26;28;22 - 00;26;39;05
VQ
Normally they're stored in a closet until they're needed. The idea is if you have notice of an impending storm or hurricane, then you would deploy them in advance of the storm.
00;26;39;05 - 00;27;06;01
DP
Thus deployable. Yeah. Interesting. So Vicente, you're a relatively young architect. I say that because at one time I was a young architect and I used to tell my students that you were considered young at 40 or 50. I'm now 55, so please don't be offended by my comment. But based on what you know so far, do you have any words of advice for your younger self or even young architects like yourself just getting started, Not just getting started, but getting started.
00;27;06;08 - 00;27;41;19
VQ
I think curiosity and a willingness to learn a variety of things. Architecture is an interesting creative discipline because there's a lot of rigor and science and technology and law backed up into that knowledge. But it's also trying to solve a problem. You have to really embrace the learning curve of that and learning things that you may not have mastery of, but your organizing, those various constraints and knowledge is into a solution.
And I think that's, if you're enthusiastic and go with it and embrace it, I think you get a lot out of it.
00;27;41;22 - 00;27;57;05
DP
Yeah, I totally agree. I like to tell people architecture is a field where you have to know a lot about a lot. It's as simple as that. So, Vicente, it's been great to speak with you today. Thanks for your time. Where can people go to learn more about Morris Adjmi Architects and yourself?
00;27;57;11 - 00;28;05;26
VQ
You can go to MA.com, our website. You can also check out The Huron Instagram. You can also visit the site. It's a beautiful building.
00;28;06;02 - 00;28;08;18
DP
Yeah, it's a great project. Well, thank you very much, Vicente.
00;28;08;22 - 00;28;12;23
VQ
Thank you.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!
Design Vault Ep. 28 55 Brighton with Rob Clocker
ABOUT THE ARCHITECT:
|
Rob joined Hacin in 2014 and assumed the role of Vice President and Managing Principal in 2023, bringing 30 years of experience in award-winning renovation and new construction projects. During his time at Hacin, he has completed The Whitney Hotel in Beacon Hill, the IIDA New England award-winning IDEO Cambridge, Public Garden Townhouse, and Chestnut Townhouse 2. He is also managing the ongoing mixed-use development at 41 Berkeley Street. Previously a Senior Associate at Perkins+Will in San Francisco, Rob led the revitalization of a 26-story Art Deco office tower, the transformation of a historic hospital to apartments in the Presidio of San Francisco, and the P/A award-winning design for the Calexico Land Port of Entry. As an advocate for stewardship of the built environment, he has spoken publicly on adaptive re-use and sustainable design. Rob is a registered architect, LEED Accredited Professional, and member of the Ipswich Zoning Board of Appeals. He holds a Master of Architecture degree from MIT and an undergraduate degree in Architecture from the University of Virginia. In his spare time, Rob enjoys carpentry, travel and photography. |
|---|
ABOUT THE PROJECT:
55 Brighton, a mixed-use commercial project located in the Allston, marks the completion of Packard Crossing, a multi-phase residential development from the Hamilton Company which provides new-build housing options in a densely populated area of the city. Completed in the spring of 2023, this project transforms a once-underutilized site that previously housed an Auto Zone and parking lots into a vibrant and sustainable addition to the community. Spanning nearly 100,000 square feet of finished space, with an additional 70,000 square feet allocated to structured parking, 55 Brighton seamlessly integrates with the surrounding context while addressing the community’s needs.
The project’s architectural concept embraces the reinterpretation of the rhythms and scale of the surrounding block while paying homage to the area's automotive heritage. The façade, with its distinctive fanned design, draws nostalgic inspiration from the winged tails of iconic 1950s automobiles, prompted by the adjacent historic Packard manufacturing facility. The brick detailing, meticulously designed to tie into the fabric of the neighborhood, adds a touch of warmth and familiarity while metal paneling on the top floor creates a dynamic visual contrast to further enhance the depth and character of the building's exterior. The façade design provides different visual experiences depending on the direction of approach along Brighton Avenue.
From the project's inception in 2015, the design team aimed to create a through-block connection, linking 55 Brighton with 83 Gardner, the initial phase of the development (completed by Hacin in 2020). Working in collaboration with Ground, Inc., the team created a pedestrian link through the block that promotes walkability and enhances the area's overall connectivity. By reinforcing the primary street edge with active retail, 55 Brighton contributes to the neighborhood’s bustling environment; the inclusion of 78 rental units contributes much-needed housing, particularly for the area’s large population of college students.
The Packard Crossing complex embraces sustainable design strategies and materials such as low-flow fixtures, solar panels, and ground water recharge, and 55 Brighton has targeted LEED Gold certification. The project's commitment to sustainability is further emphasized by the inclusion of newly planted trees, leaving the site with far more green space than previously existed. By replacing surface lots with 175 covered spaces, the project addresses the parking needs of the community and offers a visually appealing solution to the needs of future development opportunities.
Mirroring the architectural concept, the interior design of 55 Brighton was also carefully crafted to reflect vibrant streetscape patterns and automotive shapes and forms. The team selected materials and finishes that embody the project's goals and create a harmonious blend of functionality and aesthetics. The inclusion of Packard-inspired details honors the area's history and adds a unique touch to the living areas, grounding the space with its specific context and past.
55 Brighton
Featuring Oyster Grey Wirecut
See MoreTRANSCRIPT
00;00;00;02 - 00;00;05;13
Doug Pat (DP)
Let's go inside the vault. The design vault.
00;00;05;15 - 00;00;36;09
Rob Clocker (RC)
This collection of blocks has several landscaped alleys to help connect people from front to back. So having pedestrian connections through the block were an important part of the planning of the project. The project itself is a fairly typical four and five stories of housing overtop of a parking podium kind of housing project, which you see all over the country.
But we had hoped to blend it in with the neighborhood, of course, and so had to find ways to tie it together.
00;00;36;11 - 00;03;34;04
DP
This is my guest, Rob Clocker. I'll share more about him shortly in this episode from The Design Vault. We highlight Rob's project, 55 Brighton Avenue in Boston, Massachusetts. 55 Brighton is a mixed use commercial project that marks the completion of the Packard Crossing housing development in the Allston neighborhood of Boston. The building transforms a once underutilized site that previously housed retail and parking lots.
Transform the site into a vibrant and sustainable addition to the community. The architecture pays homage to the area's manufacturing heritage. The design concept reflects the vibrant streetscape patterns and automotive detailing. The building contains nearly 100,000 square feet of finished space, with an additional 70,000 square feet allocated to structured parking. The project reinterprets the rhythms and scale of the surrounding block, while paying homage to the area's automotive heritage.
The facade, with its distinctive folded fan like design, draws nostalgic inspiration from the wing tails of iconic 1950s automobiles. This design move prompted by the adjacent historic Packard Manufacturing facility. The brick details tie into the fabric of the neighborhood and add warmth and familiarity. While metal panels at the top floor create a dynamic visual contrast to the brick facade.
The complex embraces sustainable design strategies and materials such as low flow fixtures, solar panels and groundwater recharge. Hi, I'm Doug Pat and this is Design Vault. Hi. Rob Clocker holds a master of architecture degree from MIT and an undergraduate degree in architecture from the University of Virginia. Previously a senior associate at Perkins and Will in San Francisco. He's now a vice president and managing principal at Hacin, an award winning interdisciplinary architecture and design firm in Boston.
With 30 years of experience and award winning renovation and new construction projects. Rob's worked on buildings from office towers to land ports of entry. During his time in Hacin, he completed the Whitney Hotel in Beacon Hill, The IIDA New England award winning ideas. Cambridge Public Garden Townhouse and 55 Brighton Avenue. He's also managing the ongoing mixed use development at 41 Berkeley Street.
As an advocate for stewardship of the built environment, he's spoken on adaptive reuse and sustainable design. Rob is a registered architect, LEED accredited professional and member of the Ipswich Zoning Board of Appeals. So welcome, Rob. It's nice to have you with us today. So tell us a little bit about Hacin Architecture and Design firm in Boston. So where are you guys located in the city?
What's the size of the firm? How long have you been around and what type of architectural and design work do you do?
00;03;34;07 - 00;04;42;16
RC
Thank you, Doug. It's really great to be here with you. Hacin is, as you mentioned, an interdisciplinary design firm where 35 people we take the word interdisciplinary pretty seriously. We have architects, we have interior designers, we have visual and graphic designers. And we think of that because as a concept driven firm, we like to take the idea of the design all the way from the outside of the architecture to the inside and throughout to the entire experience.
The firm is located in the south end of Boston, which is one of Boston's many historic neighborhoods. It was founded 30 years ago by our founding principal. David Hacin started at his dining room table and gradually built up to the 35 people we have today. And all that time has been in the South end. So in some sense, we're a neighborhood architecture firm.
In another sense, we think we've learned how to build buildings and do design in places that people love in ways that they recognize. We like to joke that the buildings we build are ones we ourselves are going to have to live with ten, 20, 30 years from now.
00;04;42;19 - 00;04;47;03
DP
So you were at Perkins and well, for a little while and then ultimately found Hacin.
00;04;47;05 - 00;05;36;12
RC
It's a little bit of a convoluted story but yes, those are the facts. My career trajectory had me moving across the country four times to California and back to Boston, and I did each of those moves twice. But the last time when I was in California, I worked with Perkins and Will, and that experience was quite formative in terms of some of the things we may be talking about today because we were an outgrowth of another local firm in San Francisco, which did a lot of adaptive reuse work.
And in that role, I was able to learn surprisingly quite a bit about Brick, even though we were in San Francisco, where you don't think of that as a building material. And there's quite a bit of historic architecture out there, as you might imagine. So learning to work in that context set the stage for some of the projects I do today.
00;05;36;15 - 00;05;47;25
DP
So you've been Hacin how seen relative to all of the other things that you've done in the practice of architecture?
00;05;47;27 - 00;06;31;12
RC
My current role, which is relatively new one, starting as of last year, I'm managing principal of the firm, our founding principal, after 30 years, and a lot of growth, decided that it would be a good idea to get a new batch of principals. So we have five of us now, in addition to David Hacin and as the managing principal.
My job, of course, is to try to help us stay focused on the business side of the practice, which, as you may know, as an architect, isn't the most fun part. However, it does matter tremendously, and I like to think of it as fundamental to helping us do the great design work we do, because ultimately, if we don't do good business work, we're not going to be able to do great design work.
00;06;31;15 - 00;06;37;25
DP
So true. So let's dig in here and talk a little bit about the project. How did you guys get the work?
00;06;37;27 - 00;07;38;12
RC
Sure. As with many projects in Boston, it's a very much relationship based city. This owner, the Hamilton Company, is old company and one of the largest landlords in Boston founded by Harold Brown. And in that very neighborhood that the project exists, we developed a relationship with them and they reached out to us specifically because they understood that we knew how to fit new buildings into existing neighborhoods, as well as to help owners like this company navigate the sometimes complex approvals process, which you find in many East Coast cities.
And Boston is certainly one that has its web of interested parties in every project. The Hamilton Company, however, because of being a longstanding company, has very good relationships with the neighborhood, with neighborhood association owns as well as the city. And so it was a good partnership in coming up with a design that would appeal to a lot of different factions.
00;07;38;14 - 00;07;45;19
DP
So tell us a little bit about the site, the history of the location, what was there and what you guys ultimately built.
00;07;45;21 - 00;08;45;14
RC
This site, which is an area called Packard's Crossing, which is so named because originally it was a location of a Packard car manufacturing plant, is a mixed use site. It has a lot of Boston rowhouses that go further down the street from our location. But the location of the particular project did have some of those more industrial uses.
And in the more recent years it had been transformed somewhat into parking lots and some low rise retail in ways that weren't necessarily sensitive to the neighborhood. As it happens, one of those buildings was the owners primary headquarters, and so it was a very near and dear to them that they do something on this site, which was good.
And because this was their headquarters, they owned numerous properties that adjoins. So they undertook a master planning process with us to think about how they could not only develop a 55 Brighton but 83 Gardiner, which is nearby and tie it all together in a sensitive way.
00;08;45;17 - 00;08;51;19
DP
So what was the ultimate scope and what were the programmatic requirements for the project? The building you designed.
00;08;51;21 - 00;09;52;29
RC
The program for 55 Brighton, on the face of it, is a fairly straightforward program. It's 77 rental units, a housing and parking garage for that housing as well as retail that would line Brighton Avenue, which is a mixed use street. The more interesting or maybe effective overlay of that program is that this collection of blocks has several landscaped alleys to help connect people from front to back.
The streets in this neighborhood aren't necessarily as frequent as some city streets are. And so having pedestrian connections through the block were an important part of the planning of the project, as well as part of the approvals for the project. And the project itself is a fairly typical four and five stories of housing overtop of a parking podium kind of housing project, which you see all over the country.
But we had hoped to blend it in with the neighborhood, of course, and so had to find ways to tie it together.
00;09;53;01 - 00;10;20;18
DP
Yeah, it's an interesting building. So you guys had to do a bunch of things with the architect. Sure. You used a lot of masonry out there, various colors, but the brick patterning and specifically stylistically the building facade as it sort of peels away in a number of locations. Very interesting. So the building's contemporary, particularly the cantilevered folding panels, and yet you utilize brick and various traditional patterns and colors.
So tell us a little bit about that.
00;10;20;21 - 00;12;26;05
RC
Sure. Our approach to the design of the facade, especially on Brighton Avenue, was the kind we take to many of our projects, which is to look carefully at the context. We look at not only what's built today, but what was built in the neighborhood previously and of course, like many of these traditional neighborhoods, there's a strong rhythm of bays and of brick along the street, which on one hand we wanted to pick up some kind of rhythm, but on the other hand, we certainly didn't want to just mimic it.
That's always the challenge we have as designers is how do we build something for today in a neighborhood from yesterday? So what we chose to do in this case, as you mentioned, is we peel the brick facade back in a regular rhythm of bays, which echoes those bays further down the street. But we do it in a way that isn't just your traditional symmetrical bay.
It lifts the facade apart in a sense. So when you're looking at it from one direction, you see a rhythm of brick bays. When you look at it from the other direction, it looks like a number of vertical metal turrets that are more reflective of what you see beyond because in that direction you're looking towards downtown, where you see a lot of the towers of downtown Boston.
So that was an important design aspect as well that you had a different experience of this building from one direction than you do from the other. And then one other aspect of that design choice has to do with how brick is used today. We no longer build load bearing brick walls. There's a lot of reasons for that, as much as we love them, but there are many, many load bearing brick walls in Boston.
So when we peel these elements back, we're just using face brick cavity wall construction like you see on all contemporary construction. But we wrapped it around, so it's the thickness of a load bearing wall, but you can still see that it's suspended in there. It's a little bit of a tongue in cheek acknowledgment of it's both symbolic of a load bearing material, but also it's being used in a way that's contemporary as a way to clad the building and give it a sense of identity.
00;12;26;08 - 00;12;37;26
DP
So let's back up just for a second. I always like to ask the architects about the project restrictions they had in regard to zoning or historical requirements. Could you talk a little bit about that?
00;12;37;28 - 00;12;45;19
RC
This project, like everywhere in Boston, as I mentioned, we have a robust approvals process for any larger projects.
00;12;45;19 - 00;12;50;06
DP
I like the word robust, it's very respectful.
00;12;50;13 - 00;13;49;06
RC
All the intentions are good. Sometimes it can become complex. Of course, this project is larger than would have normally been allowed by the underlying zoning, so it went through this process to approve a larger building and part of those approvals then have a lot to do with review of the design to make sure that the design is going to mitigate the scale of the building fit into the neighborhood in ways that we hope we've been able to be successful here, and that also there are elements to the design which contribute to the neighborhood, which gets back to some of those connections in the landscaping that I mentioned.
And as it happens on top of the rear of the building on one level, up on the parking is an extensively landscaped courtyard which is made for the residents of the building. So to this approval, we of course, had to meet with neighborhood groups. We had to go through numerous public hearings and we think we reached a place where all parties felt like there was a good compromise with this building.
00;13;49;08 - 00;13;51;14
DP
So was there a historical review.
00;13;51;20 - 00;14;02;26
RC
In this particular neighborhood? Interestingly enough, there was not a historic district review. This piece of Boston, although it has a lot of buildings from long ago, is not a designated landmark district.
00;14;02;28 - 00;14;27;09
DP
Interesting. Yeah, I thought the notion of showing this facade as it peels away as a thick masonry wall, this kind of tongue in cheek reference to historic architecture is really interesting. A great idea. Tell us a little bit about the building and plan. It looks like a giant rectangle, and yet you've done an awful lot with the facade and the undulations in the forms.
00;14;27;11 - 00;16;39;13
RC
That's one simple thing about the building is that the site is a rectangle, which we don't get a lot of those in Boston. So we were excited about that. But the housing portion component is an L-shape because as you know, with multifamily housing, there's a dimension which plays itself out really well. The rectangle of the footprint of the building has to do with the parking.
So the front of that is lined with retail on the building lobby. And then above that is the two lengths of the L-shaped housing. What we did with that then is to articulate those different volumes. That's also where we turn to the brick patterning to identify the different areas of the building. And we had to do this though, within some constraints of course, because this is a rental building and the owners wanted to keep the housing reasonably affordable.
So all of the brick we use is actually just standard modular brick, which means it's the kind of brick that we love because it's easy to lay out. It creates an eight inch by eight inch grid on the building and to be creative with modular brick, we had to do things like turn the brick on its side, create soldier courses and find ways to push the brick inward and outwards to create shadow lines.
And one of the aspects of these fins on the front of the building that we've been talking about is that they actually curve outward from the main facade. But we wanted to achieve this curve without buying any special bricks. And when the contractors did their mock up and brought it out in the sun, everybody to our horror, recognized that it was creating all kinds of jagged shadows because the bricks were rectangular and they were trying to create a curve in order to help them with that.
We actually went back to our drawings. We laid out the coursing of those brick courses and created them some full sized brick causing diagrams, which the Masons then used. They relayed out the mockups and it came out looking smooth. And this was one of those cases where what we love about Brick is it depends so much on the Masons and their desire and skill to make things work.
And that back and forth really, I think made the building much better.
00;16;39;16 - 00;17;04;29
DP
So let's start with the parameters for building materials. When you guys got rolling, did you just decide, Well, Boston's got a lot of bricks, so that's what we're going to use for the majority of the building. And then talk a little bit more about some of these coursing tapes that you use, because I did see some soldier coursing.
I saw some regular type of courses. And then, of course, there are all kinds of strategies to create shadow lines in the facade underneath the windows, etc..
00;17;05;01 - 00;18;17;23
RC
Yeah, the decision to use brick, as you say, dug was a pretty foregone conclusion. We were working in a block where all of the existing buildings, the historic buildings were brick, and it's the kind of material that really helps bring identity to the building in a way that people feel like fits with Boston. This was an idea that sometimes we fight as designers, we think we want to do something new in this city that's all made out of bricks.
But I think over time we've come to recognize that the fact of Brick in Boston is one that's time tested. It's one that brings identity to the place. And so we accepted it fairly quickly and then set out to figure out, well, how do we create different proportions, different forms, and articulate the building with these bricks as well as bring different colors to it.
So it's not all just red brick. We did use a much darker brick for the base of the building, which helps ground the building helps those bays feel like they're floating up above. And then in the courtyard we use some yellow brick, which is not what you see from the street. It gives you some variation for the expression of the building and also brightens up that space.
00;18;17;25 - 00;18;24;20
DP
Could you tell us a little bit more about the coursing types and the strategies to create shadow lines in the facade?
00;18;24;23 - 00;19;10;10
RC
Yes, we were constrained to using just regular shaped bricks. One of the coursing techniques we used was to help with the rhythm of the windows of the building. With housing, you get repetitive windows because we want to use the same kind of windows and we have repetitive apartment units. However, we wanted to create some different scale to those windows, and we use this by creating brick panels which frame some of the windows and help the windows appear to create larger patterns on the facade.
And in these brick patterns, we simply stacked the bricks and then pushed every other brick inward by about an inch, which created this nice textured shadow line, which gave it a little bit of depth similar to the depth the window had. That was one of the techniques we used to help give the building some life.
00;19;10;12 - 00;19;28;08
DP
So it's also interesting you guys ended up doing mock ups, which we all as architects end up seeing in the field an awful lot of times when we're using a lot of masonry or when things get complex. How did you do the drawings? The architectural drawings, were there 3D, was it BIM modeling, was it 2D?
00;19;28;10 - 00;20;38;26
RC
On this project, like many of our projects, we have both a design model and then a construction model. So early on we built the building and sketch up that lets us study forms colors fairly quickly and do variations to help dial in some of the aspects of the building which are going to be most conducive to the design as well as lets us be flexible with some of the city approvals processes when different requirements are brought up around the design development phase, though, we certainly built the same model in Revit and that becomes the actual construction model and Revit is where we really get into the brick detailing.
We don't draw every single brick, although we sometimes like our clients to think we're doing that. We use a combination of patterns on the surface of the model, which are very accurate to the brick module with certain areas where we will go in and manually layout the coursing because we know it needs to work in a certain way.
And so we do love using these tools. They really help us make sure that what we draw is what the Masons are going to be able to build.
00;20;38;28 - 00;21;01;25
DP
Yeah, I was really surprised when I was looking at the photographs, the peeling facade, if you will, these fan like projections. There was one photograph I looked at and you can actually start to see the curve the way the brick is manipulated in the facade. So it's not a hard line. I did not expect that when I saw that photograph.
That must have been really interesting to see worked out in the field.
00;21;01;27 - 00;22;01;22
RC
It was very interesting to see worked out in the field. That curve, however simple it seemed to us, was actually somewhat difficult for the Masons to achieve. They did do a mock up of that curve, which was not successful initially because when they laid out that mock up and put it in the sun, we saw immediately that the corners of the bricks were shadowing over top of each other, that they were struggling to make sure the crossing was smooth.
And so we went back to our drawings and we laid out each course a brick for them and printed a full sized drawing of that, causing to have them give that a try because we use the geometry of the curve to lay out where the corners should fall. Then when the Masons used that template and rebuilt the mockup, it actually came out quite smooth, which is the result you see today.
And we're actually kind of excited because that's a 20 degree change in plain between the face of the building and those projections, and it's achieved in two and a half courses of brick.
00;22;01;25 - 00;22;03;16
DP
My gosh, that's incredible.
00;22;03;19 - 00;22;08;04
RC
Flat bricks too. So we didn't have to buy curved bricks, which nobody likes to do.
00;22;08;06 - 00;22;16;15
DP
Did you do that by making the radius larger for that curve rather than having a smaller radius? Am I understanding that correctly?
00;22;16;17 - 00;22;37;28
RC
It was almost simpler than that. The radius didn't change. It's just which parts of the brick touched the radius needed to be adjusted because the Masons were having the corners and the flats of the bricks that were of course with each other overlapping in a way that cast shadows. And if we just moved those back, the shadows faded away.
00;22;38;04 - 00;22;44;01
DP
Very cool. So how many people were on the team working on the building over time?
00;22;44;03 - 00;23;10;16
RC
From the start of the project, we had just a couple of people. We had our project manager, Jeff Brown, as well as a couple of junior designers helping with the various models and presentations. By the time we got to CDs, there were five of us putting the drawings together and then for construction it was down back to just two of us getting through the various needs of the construction site.
00;23;10;18 - 00;23;14;23
DP
And how long was the process start to finish, including reviews.
00;23;14;25 - 00;23;42;12
RC
These kind of projects, tt's always interesting to answer that question because we've been working on this site with this owner for over ten years. This project was in the queue to it's the biggest one on the site, but it was one of the last ones we did with them. So the early ideas for it were probably seven or eight years ago.
But by the time we started the actual design, that took a little over a year and a half, then the construction took about two and a half years.
00;23;42;14 - 00;23;51;03
DP
So I love to ask architects if there was anything interesting through the design and construction process that you guys learned that was kind of new to you?
00;23;51;05 - 00;24;55;27
RC
Yeah, I think this project probably one of the more interesting and challenging but creative aspects of the project is that this client is their own developer and their own contractor. They are the ones who both financed the building and built the building, but they did hire us to design the building and of course hired the subcontractors to build the building with them.
But there were many times when you're working with a client who is building their own buildings that they are in a hurry because they figured they know what they're doing and they want to move forward and so very often we would find ourselves kind of rushing to stay, keep up with them. And what I think was an important lesson for us or something we were glad about is that we did take the time to do a really strong set of drawings during the design phase so that every time the client tried to get ahead of us, we had a good set of documents to help them not get into trouble.
That's not always the case. Sometimes clients will hurry you through the design with the thought that during construction you can figure out some more of the details.
00;24;56;00 - 00;25;00;24
DP
So the project wasn't bid out then to a contractor or it was?
00;25;00;27 - 00;25;11;02
RC
The project was not bid out to a general contractor because the general contractor was the client. However, they did bid out all of the different trades, including the masonry trades.
00;25;11;04 - 00;25;15;01
DP
So it was an extraordinarily thorough set by the time you guys were done.
00;25;15;08 - 00;25;19;17
RC
We did have a very strong set of drawings which always makes us happy and protects us.
00;25;19;19 - 00;25;32;24
DP
Makes things a little easier down the road. So, Rob, you've been an architect for a while. Based on what you know today about being an architect, do you have any words of advice for your younger self or even young architects coming down the pike?
00;25;32;27 - 00;25;56;13
RC
Sure. I think one of the pieces of advice I have learned over the career is it really matters to trust in the simplicity of design and to keep things basic. You may think, as I did as a young designer, that you need to add a lot of ideas and things like Brick are boring. But actually if you just stick with the basics, you can come up with quite an elegant solution.
00;25;56;15 - 00;26;33;06
DP
Yeah, I always find that interesting, this idea that when you have limitations or parameters, many times young people think, Well, I'm not going to be able to do anything creative inside of this notion that things should be simple or minimal in some way. And yet I think that is the key to creating things that have never been done before.
Perhaps I love this idea that when I'm given lots of restrictions, I still have to be, I still want to be creative. So I think that ties a little bit into what you just said.
00;26;33;09 - 00;26;54;11
RC
I completely agree. I think something else we find about trying to stick with the basics is very often when you're trying to tell a story and come up with a concept which other people can understand, you really have to stick to the story and stick to the basics. And so these rules were made for a reason and they're really great to flex and learn from.
00;26;54;14 - 00;27;03;24
DP
Well, Rob, thank you very much for being with us today. And thanks for your time. Where can people go to learn more about Hacin Architecture and Design and yourself?
00;27;03;26 - 00;27;21;20
RC
Thank you, Doug. It's been a great pleasure to be here today. And you can go to www.Hacin.com to learn about us or come to Boston's South End. And we're always happy to give people a tour of both our projects and a lot of the great historic architecture in Boston.
00;27;21;22 - 00;27;27;28
DP
Well, thanks again, Rob. Beautiful project. Congratulations. And we'll see you around Boston.
00;27;28;01 - 00;27;31;10
RC
Thank you, Doug.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!
Design Vault Ep. 27 389 Weirfield with Tom Loftus
ABOUT THE ARCHITECT:
|
Tom’s first exposure to working in the architectural field came from working in wood-frame construction. His passion for the industry grew, and he soon realized that as an architect he would be afforded more creative license to design structures that would have a lasting impact on the community. Tom brings over 14 years of project management experience to the team at Aufgang. Prior to joining the firm, he spent several years at various other firms in the city and Westchester County, where he gained experience leading the development of projects ranging from single family residential units to multi-family mid-rise structures and interiors. As Studio Director at Aufgang, Tom is a leader in all aspects of project development – from designing the beginning concept, to overseeing the project through the construction process to completion. He has extensive knowledge and experience in project management, schematic design, project design development, construction drawings, design quality, and project construction. He is also a leader in building and maintaining client relationships, managing team’s workloads, and client and consultant coordination. Tom is a firm believer in the powerful role that technology plays in design, and avidly follows the latest technology trends as inspiration for efficient and innovative designs. |
|---|
ABOUT THE PROJECT:
389 Weirfield Street is a 12-story, 50,100 GSF rental project consisting of 66 residential units with 66 parking spaces, with 46 market rate and 20 affordable rate units, and including a common roof deck, library, half court, exterior seating, huddle rooms, café, and amenity room. This building was constructed along with 378 Weirfield St., located across the street. The amenities of both buildings are available to both buildings’ residents.
TRANSCRIPT
00;00;00;02 - 00;00;05;13
Doug Pat (DP)
Let's go inside the vault. The design vault.
00;00;05;16 - 00;00;27;11
Tom Loftus (TL)
So we really had to be mindful of availability of product and the budget. So this is what started driving us to start playing with different bonding patterns. If we stack the brick one way versus another way, if we do a running bond versus a stack bond versus a Flemish bond, how can we play around with our stacking patterns and try to make something unique?
00;00;27;13 - 00;02;46;23
DP
This is my guest, Tom Loftus. I'll share more about him shortly. In this episode from the Design Vault, we highlight Tom's 389 Weirfield Project in Brooklyn, New York. 389 Weirfield in Brooklyn is a 12 story 50,000 square foot rental project consisting of 66 residential units, a common roof deck, library and cafe. The building was constructed along with a second at 378 Weirfield just across the street.
The building features a very unique singular masonry facade we'll discuss today. The sole decorative facade is done in undulating rail like bricks, which is in a creative vertical design. The bricks are dark and called Ebonite Smooth. They protrude in patterns at equally spaced cadence as the facade climbs. The windows are set apart from the vertical masonry bands with frames of varying height, which capture the windows between the horizontal spans. The singular brick facade was a unique way of setting apart a building that might otherwise be much like any other.
Hi, I'm Doug Pat and this is Design Vault. Tom Loftus has a bachelor degree in architecture from New York Institute of Technology. He also has a certificate in business management from Cornell University and is a licensed architect in New York.
Tom's first exposure to working in the architectural field came from a job in wood frame construction. After a number of years working in Westchester County, he brings over 20 years of project management experience to outgoing architects. As studio director, he has extensive knowledge and experience in project management, schematic design, design, development, construction drawings, design quality and project construction.
He's also a leader in building and maintaining client relationships, managing teams’ workloads, plus client and consultant coordination. So welcome, Tom. It's nice to have you with us today. So tell us a little bit about Aufgang Architects in Suffern New York. So where are you guys located in Suffern? What's the size of the firm? How long has it been around and what kind of work do you guys do?
00;02;47;01 - 00;03;37;20
TL
Great, first and foremost. Thanks a lot, Doug, for having me on the podcast today. I'm really excited to be here. So we're located here in downtown Suffern, right down the street from the train station pretty close to central Manhattan. So our firm is about 50 people right now. We primarily do residential work. I'd say about 90% of our work is in the residential field.
We do everything from low rise to high rise buildings, primarily in the five boroughs. But we also have projects in the tri state area and a few scattered around the country as well. A lot of those projects are mixed use with commercial on the first, second or few floors and then residential apartments above. The residential work that we do ranges in everything from luxury condos all the way to homeless shelters and really a range of everything in between.
00;03;37;22 - 00;03;39;28
DP
So how long has Aufgang Architects been around?
00;03;40;05 - 00;04;19;22
TL
Outgoing has been around. I think we're going about 50 years now. Ari is the third owner of the company, and when I started, I worked together with Ari and our former principal, Hugo, and they partnered for a while and he had also taken over the firm from someone else. So probably in the early seventies, if I have my history of the firm correct.
We started in Rockland County doing small scale residential rehab work and grew in time and in size with our clients and our work type from one partner to the next, and really have kept our foot in our roots in residential and then grown laterally in the industry.
00;04;19;25 - 00;04;27;22
DP
Tom, tell us a little bit about yourself. How long have you been practicing architecture and your role as studio director?
00;04;27;25 - 00;05;16;29
TL
Sure. It feels like forever. Honestly, every once in a while I wonder, am I still really doing this? But I've been in the architecture field now just a little over 20 years, and I started working in Westchester County. Small scale wood frame, residential. It was a natural stepping stone for me. After I got out of high school, I thought I want to be a framer.
And after getting really tired of carrying three quarter inch plywood up a ladder, I said, Nope, time to go back to school and study architecture. And from there I worked at a variety of firms in Manhattan, in Westchester County, doing a variety of different work. And when I found this firm, the scale work that we were doing, the residential work, it tied into something I loved with my single family housing experience.
It kind of stuck and I ended up staying here for quite a while.
00;05;17;01 - 00;05;23;25
DP
It's a long time practicing as an architect. I kind of say the same thing about or to myself about how long it's been.
00;05;23;27 - 00;06;23;12
TL
Sure, I've really grown in the company here. It's been a fantastic partnership with Ari. When I started, I came in really as an assistant project manager. A lot of my experience was not relative to the scale of the projects we were doing, although in other firms I was working in a bit of a leadership role running point on smaller scale projects, so it took a little time to learn the ropes, if you will, in the different construction types.
And I've moved up into the role of studio director now, so I work very closely with our senior management and the rest of our senior staff looking at our workload, our resource management, project proposals, client relationships and really stay involved with the team from the very start of the project until close out to handle the day to day operations of the office as a whole.
Ari, myself and our controller meet frequently to talk about some of the more boring business side of things and then the more fun happens working with the architects on the day to day and the projects.
00;06;23;15 - 00;06;33;19
DP
So let's dig in here and talk about this very interesting facade of yours. How did your office get the project, or is this a project that the office created?
00;06;33;21 - 00;07;57;02
TL
Yeah, this was actually an interesting project that came at a time when everything started shutting down right at the start of the COVID pandemic. And we had a really good recommendation from a long time client that we had worked with, and we had met a new client remotely who was involved on the construction side of things, and we hit it off.
We started talking and it was the first time ever that I met someone virtually and had meetings like this on screens, and we were trying to build a new professional working relationship. So it was very unique in the way that the project started. And again, we do a lot of our work really based on recommendations. We really pride ourselves in building good relationships with our client base, and that's really how the project got started.
They had this unique property in Bushwick and if you know the area in Brooklyn at all, it's a lot of small scale row housing, if you will, maybe 3 to 4 storeys and there really aren't too many open lots. And in this particular project it was unique. There was a large portion of the lot that had an easement that couldn't be built on it, and it provided a good amount of air rights which allowed us to follow the zoning path to do a much taller building than you usually would see in this neighborhood.
Most of the buildings were very close together, and that's really how it started and how the project grew and how we ended up with a 12 storey building in the middle of Bushwick.
00;07;57;05 - 00;08;04;19
DP
So did you guys know right away that you were going to be able to make a tall building there, or did it take a little bit of examination first?
00;08;04;21 - 00;08;48;13
TL
It took a little bit of examination. Usually what we do as architects is we really try to help guide our clients to bring their projects to fruition. This is the property I have. What can you build? How much can you build? There are two different zoning parts you can follow, primarily three different zoning parts in New York City that will help you establish the bulk, the height, the size of the building.
So we'll study that first and foremost with our clients and present them the different options. And based on the geometry of this lot, when we saw the potential to get a little height on this building, be separated from the other surrounding residential buildings, it gave them a nice opportunity to have a building with some great potential for views in an otherwise low height area.
00;08;48;15 - 00;08;53;12
DP
So what was the scope and the programmatic requirements for the project once you got rolling?
00;08;53;14 - 00;09;32;03
TL
Typically and specifically to this project, our scope was everything from working with the development team to help them flush out the parameters of their funding program. So when you work with different agencies in New York City and in the state and you're following certain guidelines to provide certain square footages and distribution of units, we work right at the very beginning with them to help them find the right mix and size of units, right with the development team.
From there, we work through design and construction administration all the way until the close of the project. So we really gave soup to nuts services here. Full scope on the building.
00;09;32;05 - 00;09;48;24
DP
So let's talk a little bit about the building design stylistically. So you guys designed quite a unique facade, while the other three facades, from what I can tell from the photos, are relatively subdued. Tell us about the main idea behind this.
00;09;48;26 - 00;11;17;22
TL
First and foremost, we love Brick. Brick as an architect, for us, it's really a timeless material and it's a durable material and it fits in really well to so many different urban fabrics in so many different places. In my opinion, what made 389 unique was the timing that this project was happening. It was happening at a time where the future was uncertain.
We didn't know what was going to come of this pandemic. We had to be incredibly mindful of the budget. Many times we like to create building facades that are two different materials having a nice dialog or different color bricks. So we really had to be mindful of availability of product and the economics, the budget, and really try to come up with something that would be unique but be something that the client could achieve.
So this is what started driving us to start playing with different bonding patterns if we stacked the brick one way versus another way, if we do a running bond versus a stack bond versus a Flemish bond, how can we play around with our stack in patterns and try to make something unique? So that was really what started pushing us in this direction of going with a single color brick and then really focusing on how to find a challenge enough for the mason that they don't hate us and say these are architects of the worst.
Have something be achievable for them. But that also will give a nice unique context to the neighborhood.
00;11;17;25 - 00;11;24;28
DP
Were there any aesthetic reviews of the building before you guys got rolling with the city?
00;11;24;28 - 00;11;49;21
TL
With the city for this particular project, there were no agencies on the city or state side that had any reason to opine on the design. We were not going for any variances. We didn't really have to go to the community board, although we did not need their aesthetic approvals. It is something that we're always mindful of working within the urban fabric and how it's going to lend itself to the context of the neighborhood is always an important consideration of ours.
00;11;49;23 - 00;12;01;09
DP
So let's back up just a little bit. So the building plan, are we talking rectangle, square, relatively straightforward. Then of course, there's parking on the site. You had said that there was a portion of the site that you could not build on.
00;12;01;11 - 00;13;07;01
TL
That's correct. So for this particular massing to make this building work, the footprint was rather small. It actually made a very efficient floor plate with a very tight core of stairs, elevator and corridor, and then apartments around all sides of that. So it really became a very compact, high efficiency floor plate with very little loss factor. And it was something that we were able to just work all the way up the building.
So there were quite a bit of revisions back and forth, variations that we had worked on to find the right mix and balance of that to fit within the envelope. The same thing then translated to the facade a bit earlier we were talking about what did the design iterations look like there, through the whole process of finding the right solution and the facade design that we felt was the right match for this building.
We did digital 3D models, plenty of sketches and even on site mockups working together with the Masons saying, We know you can do this, we believe in you, please don't kill us. And did plenty of mock ups there to really work it out.
00;13;07;03 - 00;13;11;25
DP
Was it a challenge finding a good mason, or did you guys have somebody lined up right off the bat?
00;13;11;27 - 00;14;04;09
TL
I think that's really one of the keys. You have to have really good subs. So whatever the type of work you're doing in this case, the Masons, you need to have a good working relationship with them. And often it's the architect working directly with the general contractor. But in these cases we invited the Masons into the architecture meetings, we invited them into the AOC meetings towards the end and said, Look, let's work through some of these details.
Let's talk through it. How is this going to work? It wasn't incredibly complex or challenging, but we wanted to make sure that the person who was directing their team to install the Brick really felt confident that they could achieve what we were looking for. We never wanted to come out on site and say, This is all wrong. That's not what we want to do.
And I really think engaging with those professionals early on is important to try to get the end result that you're looking for.
00;14;04;12 - 00;14;16;20
DP
Yeah, we try to bring in a contractor at schematic design. Once we wrap up schematic design, we have them price the project. This is in high and residential work that I do. So single family homes.
00;14;16;22 - 00;14;33;09
TL
Right? And in this case we didn't have a mason lined up. We didn't have a recommendation. The developer slash contractor, they were one and the same here. They had already had an existing relationship with this Mason and we started just working with them early on in the process.
00;14;33;11 - 00;14;54;17
DP
So could you do your best to describe the evolution of the design of that facade and then try to describe the facade? I'm going to encourage our listeners to go to the Glen-Gery site and take a look at some of these photographs because it's really striking. I've never seen anything like it. It's a great idea. The clients must have been thrilled when you presented the drawings.
00;14;54;19 - 00;17;33;18
TL
Thank you very much for that. We've seen a lot of example of brick facade that has quite a bit of movement in it, and these brick facades more often than not, are panelized prefab, and that's a way that you can achieve quite a bit of movement with brick using this idea of this undulation and this movement in the brick as an inspiration.
That's what triggered us to start thinking about how a brick pattern, the stacking pattern, really might help us achieve what we wanted to do here. So if our listeners are familiar with Brick parents, which I hope they are, we're in a brick podcast, we utilized a Flemish bond pattern and a running bond pattern. So the Flemish bond pattern has a standard brick with the long face.
The following brick is then rotated 90 degrees with the short face and the pattern is repeated. Taking this idea of combining a Flemish bond pattern with a running bond pattern, we now have these bricks that are half size, if you will, square proportion to create the movement and the undulation throughout the facade. We detailed a Flemish bond pattern with a large number of running bond, then a increasing increment of Flemish bond and a decreasing increment to running bond.
So we took the pattern and as you got closer to the center of the pattern we created, you had a higher frequency of Flemish bond. And as you moved away towards the end of the pattern that moved vertically up the building, it was stretched out with more running bond. So that's a lot of back and forth with different bond patterns.
Ultimately, by having that Flemish bond brick, we then protruded it out from the facade in the center of the pattern where the Flemish bond patterns are stacked very closely together. The bricks protruded the largest amount. And then as that pattern was separated and pulled apart from top to bottom, the brick became closer and closer to the facade.
So we basically created a formula that the mason can follow. For every increment, the brick would step out a half inch further, and this is what gave the facade that undulation, as you move up the bricks, steps out and back in by using this bonding pattern. It also created a really dynamic shadow which was something that we really loved.
When the sun hits the building the right way, you get a really fantastic shadow where you have that brick and it just really, in my opinion, created a beautiful cadence that worked through that pattern.
00;17;33;21 - 00;17;41;27
DP
So it really does remind one of Braille. So how far what's the furthest protrusion for one brick?
00;17;42;00 - 00;18;01;07
TL
I do like that description of Braille. You instantly have an image in your mind of these protruding points that they create the pattern. The furthest protrusion is about two and a half inches at the center of the pattern. And then as it works its way down in half inch increments, it goes back down to zero and the pattern becomes flush.
00;18;01;10 - 00;18;20;02
DP
So you guys said that you worked on this in 2D and in 3D. I would imagine if you did some sun studies, you got a better sense for how much shade and shadow was going to be produced by these protruding bricks? Did you do the project in BIM? Is it Revit? Because I saw 2D drawings of this?
00;18;20;04 - 00;18;42;25
TL
Yes. It isn't Revit. It is a BIM project. While we were in the design phase, we actually used a few different softwares SketchUp and Enscape and Revit along with AutoCAD, and we really did a series of 2D sketches, 2D drawings and 3D studies, partial facade studies. Just to get a sense of how this all might look.
00;18;42;28 - 00;18;49;26
DP
And how many iterations ultimately did you go through? I mean, big iterations, like is it two or three or ten or?
00;18;49;28 - 00;19;42;12
TL
Once we just came to the conclusion that we need to stick with a singular color brick here in the front, I'd say we probably had about ten different versions. It's a slim, tall building with very large windows, really trying to maintain a nice modulation of those windows in that spacing, but also then maintain a standardized brick dimension. So for a long time we were playing around with the inches of the bricks so that we were at a half size brick or full size brick.
Should we use a stack bond and emphasize the verticality of the building? How often should we introduce a horizontal element so that it's not looking like a stack of pancakes, for lack of a better expression? So really, we had a good amount of iterations here until we got to the point where we really like the running bond, Flemish bonds.
00;19;42;14 - 00;19;58;19
DP
I like the way you describe that. From what I remember looking at these photos, the windows are framed out differently. So you have a series of windows which have an individual frame, and then at one point in the building, that frame actually wraps a few stories of windows, right? So you break up the facade that way, too.
00;19;58;19 - 00;20;26;03
TL
Exactly. Playing with the verticality of the building, we did group a series of windows, two windows stacked vertically, three windows stacked vertically and created a frame around those windows. And this helped take that 12 story building and just give it a little bit of scale as it moved up the building. So these groups have two vertical windows that are now framed together.
Then also had the movement of the undulating brick happening between them.
00;20;26;05 - 00;20;28;28
DP
You guys really thought through it. It's a real beautiful facade.
00;20;29;04 - 00;20;29;29
TL
Thank you.
00;20;30;01 - 00;20;34;06
DP
So how big was the team that worked on the project? Just a few people?
00;20;34;08 - 00;21;17;08
TL
Every project is staffed with a dedicated associate director who are all registered architects, a project manager, and then the support staff. When we were in the design phase, we had the project manager working together with one of our designers. So we really had a team of to playing around with this and then bouncing the idea back off of the associate on the project.
Then once we really ramped it up into production, we would stack two or three people on the project. As you get closer to submission deadlines and trying to get into the Department of Buildings to get permits done, we would build the team up. Usually there was always at least two people on the project that were always there from day one.
They haven't left the project and they stayed on from beginning to end.
00;21;17;10 - 00;21;26;09
DP
So how long did it take to build the building? I would imagine it was pretty cool watching that facade go up. First couple stories. You must have been thinking, Wow, man, this is going to be something.
00;21;26;12 - 00;21;51;29
TL
You know, the construction team, they did a fantastic job. They had a really good crew out there. And around 24 months, the building went up and then all the fine details coming out of the pandemic. It was interesting. There were certain trades that just took longer because of materiality, distribution chain, supply chain, availability of product, which threw little curveballs here and there.
But all in all, the sequence and timing was fairly smooth.
00;21;52;01 - 00;22;01;13
DP
So it seems like I learned something new every project. Was there anything that you guys learned while you were out in the field or doing these drawings or dealing with the client?
00;22;01;16 - 00;22;48;06
TL
There certainly was. You know, I had spoken about the Mason earlier on, and that was certainly a good lesson. Building a good relationship with your Mason early in the project is really important and I joke about it. Sometimes they look at the architect's details and think, Are these guys crazy? We're not going to build this. There's going to be a better way to do it.
And I think that was really the big lesson we took here, establishing that good relationship and also giving the tradesmen the respect that they deserve. They're installing the work. They know some of the nuances of how this gets installed and taking that into consideration, finding that common ground so that you don't bring your ego into the conversation and giving them that professional respect and you're going to get it back.
That was definitely a good lesson here.
00;22;48;08 - 00;23;16;16
DP
That seems like a lesson I've learned over and over again throughout my career. When you're young, you go out there and you think you know everything and you've got an answer for everything, or you're going to fake your way through it, or however you choose to deal with it. But as you get older, you realize that these people that you're working with, many of them have an awful lot of experience, and it would be a good idea to sit and listen to them and actually ask them questions rather than tell them what to do.
00;23;16;18 - 00;23;38;10
TL
That's right. And I always find that working with our up and coming project managers and our younger staff, it's always those lessons that you try to instill in them. It helps them understand how to build those relationships because this industry is built on relationships and if we can do that, we're going to navigate successfully through any project.
00;23;38;13 - 00;23;58;03
DP
Well, you guys have been around a long time, 50 years. Goodness gracious. That's incredible. Congratulations, Tom. You've been an architect for over two decades. Based on what you know today about being an architect, do you have any words of advice for your younger self or maybe some young architects working their way up the ranks?
00;23;58;05 - 00;24;13;16
TL
Yes, don't worry. It's going to work out, if you love it, stick with it. It's a long road. And just when you think maybe you should change your major, you might still be out of college 20 years and asking yourself, Should I change my major? If you love it, stick with it. It's rewarding.
00;24;13;19 - 00;24;28;05
DP
That's really funny. I feel like I've changed my major all the time.
My goodness. So, Tom, it's been great to have you here. Thanks for your time. Where can people go to learn more about Wolfgang Architects and yourself?
00;24;28;07 - 00;24;38;19
TL
They can go right to our web site at Aufgang.com and they can find all the information about us there. They can follow us on LinkedIn and Twitter and all the different platforms.
00;24;38;21 - 00;24;45;21
DP
Well, thank you very much, Tom. It's been great. And I encourage people to go to the site and take a look at this very interesting building. Thank you.
00;24;45;29 - 00;24;50;18
TL
Doug. I really appreciate it. It was great chatting with you here today. I had a great time.
00;24;50;21 - 00;25;18;12
DP
Awesome. Thank you.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!
Design Vault Ep. 15 650 Park Avenue with Christa Waring
ABOUT THE ARCHITECT:
|
Christa is a Principal at CTA Architects P.C. whose journey with the firm began in 1994 when she joined as a member of the technical staff. With a deep-rooted passion for sustainable design and a keen understanding of Building Code and Zoning issues, Christa plays a pivotal role in driving the office's environmental research and implementation of green technologies, including adherence to LEED and Certified Passive House design standards.
Christa has worked on some of the firm's largest projects, and she brings a consistent focus on sustainability to all of her work. The 90,000-square-foot, mixed-use Lower Eastside Girls Club/Arabella 101 was designed to LEED standards, and the Grand Street Guild moderate rehabilitation featured a 3,500-square-foot maintenance building with a seasonally blooming extensive green roof. Her recent projects include the award-winning exterior preservation of the cast iron façade at 54 Bond Street, and she recently oversaw the completion of the conversion of an illegal SRO into low-income housing for formerly homeless elderly residents on the Upper West Side. Her current workload includes the start of construction on a building rehabilitation project that is part of the New York State Energy Research and Development Authority's RetrofitNY pilot program.
In addition to her work as a Principal at CTA, Christa taught at Pratt Institute for a number of years and lectured for the New York City Urban Green Council and the Northeast Sustainable Energy Association. She is also a member of the New York City Department of Buildings Construction Requirement & Materials Committee and the New York City Energy Conservation Code Commercial Advisory Committee.
|
|---|
650 Park Avenue
designed by CTA Architects
TRANSCRIPT
00;00;00;00 - 00;00;05;13
Doug Patt (DP)
Let's go inside the vault. The design vault.
00;00;05;15 - 00;00;28;26
Christa Waring (CW)
It's only exterior work. Right now, we've just mobilized to start the brick restoration. We had great assistants getting a perfect match to the original white glazed brick that they have there. You want to make sure when you're doing this much brickwork that your spackle is right, and it doesn't stand out in the end. And Landmarks approves the work very easily.
00;00;29;03 - 00;03;30;29
DP
This is my guest, Christa Waring. I'll share more about her shortly in this episode from The Design Vault. We highlight Christa's project in New York City, 650 Park Avenue. 650 Park Avenue is located in the Upper East Side Historic District, built in 1963 and designed by Emery Roth and Sons Architects. It's a 21-story apartment building with a white glazed brick facade and setbacks above the 16th floor.
The base of the building maintains the building line of Park Avenue. Recent façade examinations revealed a deficiency in the wall tie system that connects the face masonry to the backup concrete block masonry. CTA designed a program of facade repairs that include face masonry pinning in addition to the restoration of all shelf angles across the façades. The original construction features have finished glazed edge over all the window lintels, which has an impressive impact on the esthetic of the building. Thus, the project entails an extensive masonry rebuild where matching the existing brick is of paramount importance.
Hi, I'm Doug Pat, and this is Design Vault.
Christa Waring is a principal at CTA Architects, P.C. in New York City. She's been with the firm since 1994. She received her Bachelor of Architecture from Pratt Institute. She's passionate about sustainable design and has a keen understanding of building code and zoning issues.
Christa drives her office's environmental research and implementation of green technologies, which includes adherence to lead and certified passive House design standards. She's worked on some of CTA's largest projects, including the 90,000 square foot mixed use Lower East Side Girls Club, Arabella 101, and the Grand Street Guild. Her recent projects include the award-winning exterior Preservation of the Cast Iron Facade at 54 Bond Street.
She also recently oversaw the completion of the conversion of an illegal SRO into low-income housing on the Upper West Side. One of her current projects includes a building rehabilitation project that's part of the New York State Energy Research and Development Authority's Retrofit New York pilot program. Christa taught at Pratt Institute and lectured for the New York City Urban Green Council and the Northeast Sustainable Energy Association.
She's also a member of the New York City Department of Buildings Construction Requirement and Materials Committee, and the New York City Energy Conservation Code, Commercial Advisory Committee. So welcome, Christin. It's nice to have you with us today. So, tell us a little bit about CTA architects, P.C. in New York City. So where are you guys located in New York. What's the size of the firm? How long have you been around and what type of work do you do?
00;03;31;02 - 00;04;46;14
CW
Well, thank you for having me today. CTA Architects. We're located down in the Flatiron District, just a couple of blocks from the Flatiron. We have 60 plus employees at this point, including support staff. We do a variety of work in New York City. All of our work is focused in the five boroughs, frankly, mostly Manhattan. We do have Brooklyn and Queens, some in Staten Island, a couple in the Bronx.
But we originally started out in 1987 or so. We came into being around the time that the first facade laws came into effect. And so, it was something that we naturally fell into. And we have been doing that work ever since I've been there since 1994. Our founding partner, Doug Cutsogeorge was my professor at Pratt and hired me as an intern in my second year there, and I have been there ever since.
So, I was an intern. I typed envelopes that when we had typewriters, I fax things and then went out and did field measurements and climbed around on ladders and hung on scaffolds. And 29 years later, still there. And I've been a partner since 2014.
00;04;46;17 - 00;04;49;16
DP
Real quickly, tell me about these façade laws. What is that?
00;04;49;23 - 00;05;55;20
CW
You know, my business partner Dan, could give you, like, every single date and iteration, but I'll give you the gist, which is that terracotta fell off a building at Columbia University and that initiated a city response, which was at that time called Local Law ten, which mandated that all buildings over six stories have to be inspected every five years by a registered professional and a report submitted to the Department of Buildings.
So, at that point, all of the buildings submitted on the same day, February 21st, every five years, and as the law developed, it keeps developing based on things that have happened in the city. At that point, it was just the street elevation and you just had to look at it with binoculars. Now it's the entire building and you have to look at it from a hanging scaffold or a bucket truck. And depending on the construction type, you have to open probes through the face masonry to expose what's in the cavity.
00;05;55;25 - 00;05;59;20
DP
Wow. So, the incident at Columbia was that in the early eighties?
00;05;59;21 - 00;06;09;27
CW
That was in the early to mid-eighties. So first it was Local ten and then it was local Law 11. And now it's called the Façade Inspection Safety Program.
00;06;10;05 - 00;06;14;05
DP
So, it sounds like a good thing. They're now inspecting buildings for this very issue.
00;06;14;12 - 00;06;25;23
CW
Right. And now they broke up the buildings. There are three sub cycles, so not every report for every building in the city is due on the same day. So now it's broken up. So that makes it a little easier.
00;06;25;26 - 00;06;32;12
DP
So, tell us a little bit about yourself. So how long have you been a practicing architect and what's your role in the office as principal?
00;06;32;19 - 00;06;53;26
CW
I got my license in 2003, But, you know, obviously I was working for the nine years before that. Currently, as principal, I do a lot of things. I wear a lot of hats. I yell at contractors, I hold clients’ hands and bring in work and put out fires where I need to.
00;06;53;28 - 00;06;55;02
DP
Do you like your job?
00;06;55;04 - 00;07;08;05
CW
I do. It is challenging. It's a lot. You have to really want to buy into it and invest. My partners, I've been with them almost 30 years. They're family and it's a good place to be. They're good partners.
00;07;08;12 - 00;07;11;15
DP
That sounds like a really interesting niche market.
00;07;11;17 - 00;07;33;01
CW
It is. And it's funny because, you know, there are a few firms in the city that do this, and we all know each other, and then we all get offshoots from employees have left and hung their own shingle and proceeded to sell focus and exterior restoration work. I would say it's about 70% of our work is exterior restoration.
00;07;33;06 - 00;07;38;04
DP
Gotcha. Let's talk about 650 Park Avenue. So how did you guys get the project?
00;07;38;06 -00;08;21;11
CW
So, I think, like everything in my history at CTA, it was word of mouth. It's kind of a tangled web. So, we use a consulting engineer who was working on a project out and Garden City, Long Island, and they needed an architect. So, he referred me to the owner, and the owner liked us and then brought us on to some of the more buildings that he owns in Brooklyn.
And then they were going around and around with their facade issues at the building that he lives in. And so, then he brought me in over there. So, it was all this chain. I always say, you never know who you're talking to when you're going to run into them again, who they are, who they end up being. To you and professionally. So that's how we got brought into the building.
00;08;21;18 - 00;08;29;07
DP
That's really interesting. So, could you give us a little history of the location? So, what was there prior to 1963, if you know?
00;08;29;13 - 00;08;43;23
CW
I do not know what was there prior to 1963, but it is a typical white glazed brick building of that era with the wedding cake setbacks. Also, during that construction period, the kind of problems that you find typically in that construction.
00;08;43;26 - 00;08;50;06
DP
So, the scope of the project then was only exterior work. Do you guys too any renovation work on the interior?
00;08;50;13 - 00;09;05;21
CW
It's only exterior work right now. We've just mobilized to start the brick restoration and we are going to visit with landmarks, redoing the ground floor, the base of the building as well.
00;09;05;23 - 00;09;07;20
DP
So, the project is currently underway.
00;09;07;26 - 00;09;08;24
CW
It's just started.
00;09;08;24 - 00;09;09;06
DP
Just getting rolling.
00;09;09;06 - 00;09;11;04
CW
Just getting rolling. It's exciting.
00;09;11;11 - 00;09;18;05
DP
So stylistically, the setbacks on those building that's due to the new laws in New York City at the time.
00;09;18;09 - 00;09;21;25
CW
Yes, those were due to zoning.
00;09;21;28 - 00;09;35;22
DP
Project restrictions - so when you guys are working on an exterior facade, what are the rules of the road? How do you guys end up doing a project like that? I would imagine that the exterior is all scaffolding at some point. What does the city make the contractor do?
00;09;35;24 - 00;11;06;28
CW
Okay, so first we started this project with, I would say, upwards of a hundred probes through the face masonry to really define what the issues were, because there was some debate over the extent of the repairs that were necessary. So, I spent a lot of time on the scaffold in the summer of 2022 looking at all the probes and really identifying the same repetitive problem over and over again.
We're just getting mobilized with hanging the rigs and part of all that entails is we had to file drawings at the Department of Buildings to get our permits and landmarks. Landmarks has to approve first, and we had great assistance getting a perfect match to the original white glazed brick that they have there. You would be surprised at how many iterations of white glazed brick there can be, but you want to make sure when you're doing this much brickwork that your speckle is right and it doesn't stand out in the end.
And Landmarks approves the work very easily. We didn't have any issues. I submitted to them the chip that we had custom made for the building. So that was great. To mobilize, the contractor has to pull scaffold permits, so he has to file with the city to install hanging scaffolds. There was already a sidewalk shed in front of the building to protect the pedestrians on the street. It's a corner building, so a lot of sidewalk shed that's been there for a while.
00;11;07;06 - 00;11;11;19
DP
So, let's back up. How did they know they had a problem? There were bricks falling off the building.
00;11;11;26 - 00;11;24;06
CW
It originally came up in a small exterior restoration project before our time that someone identified that they had a problem, and then it just kept developing from there.
00;11;24;10 - 00;11;29;05
DP
And how many sides were that exposed? Two or three. I understand it's a corner. Does it have a back side?
00;11;29;10 - 00;11;35;18
CW
Actually, it's L-shaped in the back. It has a number of large façades. It has the two large corner facades.
00;11;35;20 - 00;11;39;26
DP
So, the building's L-shaped and plan to then open up to a courtyard and-
00;11;39;26 - 00;11;40;05
CW
It does.
00;11;40;06 - 00;11;44;26
DP
Okay. How long does the project then take? Start to finish on a building this size?
00;11;44;28 - 00;12;12;26
CW
So, we're looking at completion in February of 2025. So, it's going to be about a year and a half on the ground. We have to install all of the pins. We have to pin the face masonry back to the backup block, which is a retrofit wall tie and first they pin and then we're going to strip all the shelf angles above and below the shelf angle and address the flashing and repaint the shelf angles.
00;12;12;26 - 00;12;22;12
CW
And sometimes we'll have to replace some of the angles and rebuild the masonry. And we have some parapet work to do, parapets that are not in good shape.
00;12;22;14 - 00;12;35;16
DP
So just so I understand that. So, they put up the scaffolding. Then you end up spending a bunch of time out there. I would imagine your partners are also out there. What I'm getting at is who identifies the structural issue? Who's the expert? Is it the architect?
00;12;35;24 - 00;12;36;27
CW
Oh yes, I did that. Yep.
00;12;37;03 - 00;12;45;06
DP
Interesting. You then document those issues in drawing form, like two dimensional drawings or 3D drawings and present them to somebody.
00;12;45;11 - 00;13;13;02
CW
Yes. Two dimensional drawings and photographs. I think the photos really speak a thousand words on this one. I presented it to the board. It's a condominium, so they have a board of directors and we met with them. I went over what I saw and the resident manager there was also very helpful, and he understands the situation and saw some of the probes that were open, that were closer to the ground and could confirm what we were telling them.
00;13;13;05 - 00;13;25;13
DP
So, you put together a set of drawings and is that priced like a typical architectural set of drawings by a GC? Is it then bid out and the lowest bidder is chosen? What's that process look like?
00;13;25;19 - 00;14;52;03
CW
So, we put together a set of drawings and construction details because we had opened so many probes, there were no questions. A lot of times when you work on a building and there are no existing drawings, which is probably 90% of the time for us, you're making assumptions about how things were built in the period of the building, right?
So inevitably you open it up and there's a surprise, sometimes a minor surprise, sometimes not so minor surprise. But this one, because we had had so many probes opened, we were able to really pin down what was behind the wall. So, we put together elevations, construction details and written specifications. We put them out to bid like the architects having a niche market in exterior restoration in New York City, there are also contractors who are a niche market for exterior restoration in New York City.
So, we bid to five or six or seven of those guys, the majority of whom I've known for many, many years. You know, we all work on the same stuff, and they select the bidder. Because it's private, it doesn't have to go to the lowest bidder. You know, we usually have an interview process so that the board can meet the contractor and get their feel for if they're a good match, that they're going to be a good match with building staff. So we go through the bidding process and then the contract is awarded and they do all that legal stuff on the side that I don't have to worry about.
00;14;52;08 - 00;14;58;04
DP
So, you guys do two dimensional drawings, details, any 3-D stuff? Not really necessary.
00;14;58;04 - 00;15;00;03
CW
Not really necessary for this type.
00;15;00;03 - 00;15;03;21
DP
And how many people end up working on one of your projects like this one?
00;15;03;24 - 00;15;11;00
CW
So, on this project, it was myself, our project manager, Freddy, and his staff member Arefa.
00;15;11;06 - 00;15;24;25
DP
So, let's get into the details. How does this work? Like, how do you do what you're doing? Are you just replacing bricks in specific areas? Are you replacing entire facades? And what does that detail look like?
00;15;24;28 - 00;15;33;29
CW
So, in the scope that we settled on, we are replacing the bricks along every shelf, angled the building, and this building has shelf angles that every floor.
00;15;34;02 - 00;15;36;11
DP
Explained to us what that is, a shelf angle.
00;15;36;13 - 00;16;11;02
CW
This is a concrete framed building. So, it has a concrete structure, and a shelf angle is a continuous steel lintel basically that holds up the masonry at every floor and it's bolted back to the concrete slab at regular intervals. There are shims and bolts, and it holds the slab in there. It holds the brick at every floor, provides the gravity support, and the wall ties provide lateral support. So, the shelf angles that this building were in very good condition. There are a few issues here and there, but nothing terrible.
00;16;11;02 - 00;16;11;20
DP
They’re all steel?
00;16;11;25 - 00;16;18;08
CW
They are steel like three by three, 4x4 angles. Some of them were shallow. So, we're making them a little deeper.
00;16;18;14 - 00;16;20;04
DP
Were they galvanized or painted?
00;16;20;09 - 00;16;46;03
CW
The original ones were not. They were painted. But when we go back, we go back with galvanized and stainless-steel bolts, and then we replace the shims and the bolts, obviously. And where we find a length of deteriorated shelf angle, we will replace that. We have an allowance for that in the contract to deal with that because there were some areas higher up on the building where they get, you know, more weather exposure that we're in worse condition.
00;16;46;05 - 00;16;49;10
DP
Tell us a little bit about the brick. How did you get the matches?
00;16;49;17 - 00;18;25;21
CW
Fortunately, this building hasn't had any huge projects on it, so it was fairly easy to identify which white glazed brick was the original brick, which was good because there were maybe three different bricks on it, different color, white base. You know, one was a little pink, one was a little white, or some had a brown speckle, some had a fine speckle, some had a varied speckle.
So, because there are so many setbacks, we were able to go to somebody's terrace where there hadn't been any work high up on the building because at the base at stone. So, I'm not comparing it at the base of the building. We also walked along the sidewalk shed because that gets you up higher. And we selected - we were like, okay, this is the original brick.
And then I reached out to King's. They are brick distributors in New York City, and the folks there were super helpful and made me all sorts of custom samples and they have little brick chips and brought the brick chips up to site and went through everything with the resident manager and decided on our brick. And then you mentioned in your intro the finished underside of the brick at all of the window lintels.
So, when you have a shelf angle you don't see in the field of the masonry, you don't see the underside, the clay body of the brick. But over the lentils you can see like the little yellow clay body of the brick. And I really got into the fact that it was finished on the underside. I think it's just a little bit like a perfect little thing that I really liked. So, we asked for that as well.
00;18;25;23 - 00;18;29;11
DP
Is that like a space that's about a half hedge, three quarters of an inch wide?
00;18;29;14 - 00;18;43;10
CW
Yeah, it's about a half an inch. If you have the right amount of bearing. And so, they put the glaze on the underside. So, the Masons have to be aware, obviously, when they're rebuilding to look for that. I'm sure I'll catch some in the beginning before they get used to it.
00;18;43;18 - 00;18;45;13
DP
Is it going to be hard to find a good mason?
00;18;45;19 - 00;18;51;10
CW
We have the contractor on board, and he has good masons on hand, so I'm not very worried about that.
00;18;51;16 - 00;19;01;08
DP
So, did you guys learn anything interesting through the construction process, through the inquiry process, anything unusual, Anything you'd never seen before?
00;19;01;14 - 00;20;11;10
CW
Not anything I've never seen before, thank goodness. Because those are never good surprises. I was happy, given the lack of wall ties, that I was happy to find that the backup masonry was still in good condition. We didn't have to worry about the backup masonry because that can also be an issue. We decided to pin the columns, which I was surprised actually worked because I had never pinned columns before because you're pinning into the concrete.
So, when you do the retrofit wall tie, you can call the manufacturers rep and he'll come out and do a test. He'll drill in the wall tie, and then he has like a crank to see what the force is, to see if the tie actually holds. And I had originally planned to strip all of the column locations in the building and rebuild that as well.
But on another project of mine, we had had pull tests done for retrofit pins on that building and they went into the columns, and I was like, wait, what? I didn't think that could happen. So, we called them out. We had had him do the tests in the field, in the masonry before, but we had him come back and do the pull tests and the columns and the pins drilled right in. So, it was great news.
00;20;11;17 - 00;20;15;13
DP
So, these are columns on the exterior facade behind the brick masonry.
00;20;15;16 - 00;20;31;04
CW
Right there, directly behind one wythe of brick behind the masonry. So, the backup concrete block goes right to the column. And then if you were to take all the face masonry off the building, you would see a grid of the columns with the backup block in between.
00;20;31;06 - 00;20;38;00
DP
And all the residents there. Do they get to live through the construction process?
00;20;38;02 - 00;21;04;06
CW
They do...Yeah. It's never pretty. It's just not. I feel bad, but there is going to be a lot of saw cutting, which is dusty. There is going to be a lot of drilling, which is loud. So, I hope that people at 650 Park, if you're listening, maybe you go back to working in the office for a while. What we do is loud and not anything that anyone wants to have to hear all day long if they're home.
00;21;04;08 - 00;21;08;02
DP
Back to the building for a second. I'm really surprised there were no drawings.
00;21;08;03 - 00;21;13;06
CW
We did have some the building super. The resident manager had some drawings.
00;21;13;08 - 00;21;21;10
DP
Yeah. What's always amazing. I mean, to go back further than that, people-built buildings from so little information, right? I mean, it's crazy.
00;21;21;14 - 00;22;05;26
CW
Yeah. So, we didn't really find any wall details. We had elevation drawings and then there's always elevation drawings, probably some plans and lots of plumbing drawings and mechanical drawings, which I don't need and are never accurate because they never built it that way anyway. And it was sixty years ago. So, lots of things have changed. So, we did go through the resident manager's giant bin of drawings in the beginning and got what we could use and it was helpful.
I mean, it helped us locate all of the columns along the facade, right? We wouldn't have had that if we didn't have the original drawings. It would have been more of a guess. But like in this project I said was knock wood a lot of guesswork so far.
00;22;05;29 - 00;22;16;02
DP
Yeah. And you talked a little bit about existing conditions and drawings. Is that something that you still do, do some existing condition sketches when you're out there and then somebody'll draw it up for you or.
00;22;16;09 - 00;22;56;00
CW
Oh absolutely. That's part of the process. You know, I went to site one day with my notebook and my pen and the contractor said, well, the girl who came last time had an iPad. And I said, I don't have an iPad. I have a notebook and a pen. They tried to give me an iPad, but I'm just more comfortable sketching it.
I feel like there is a connection between pencil and paper that makes you understand what you're looking at and what you're drawing. I don't know. When you go to architecture school, you don't really know anything when you start. And I started to understand through drawing, and I went to school in the era where there was no computer drafting.
00;22;56;00 - 00;22;56;16
DP
Yeah, I experienced the same thing.
00;22;56;21 - 00;23;13;25
CW
Yeah, I feel like there's a real connection and I think, you know, a lot of times there's an assumption that the computer program is the be all, end all. Not that just a tool and people don't really sometimes don't understand what it is that they're drawing because the computer's creating the detail.
00;23;13;28 - 00;23;15;14
DP
They miss it in the learning process.
00;23;15;19 - 00;23;35;24
CW
Yeah. And because we do what we do, that's not something that they teach. They don't teach that at school. I actually didn't have to take construction documents in school because I got credit for my job because I was doing actual construction documents. I worked full time. I went to school part time. So, it took me a very, very long time to graduate.
00;23;35;26 - 00;23;37;09
DP
Wow, that's impressive.
00;23;37;11 - 00;23;37;22
CW
Yeah.
00;23;37;29 - 00;23;42;20
DP
Christa, was sustainability an issue for you guys when you took on the project?
00;23;42;27 - 00;24;46;20
CW
Unfortunately, with this project, given the parameters of the scope, we could not really accomplish the integration of additional insulation in the cavity or something to that effect, moving forward, but in our office, we really focus on the concept of maintaining existing buildings and doing rehabilitations as sustainable practice. We have a sustainability coordinator that we brought on about two years ago.
She's fantastic. She keeps us honest. She's always regulating things, making sure we're composting, taking things out of the garbage can and putting them in the compost. We did a full led switch over on our lighting in the office pushed by her. She's changed our specs, you know, she'll give me and my partner Dan markups on the specifications with suggestions and we integrate that into our specifications. We do have a sustainable component in every job and some jobs, we can take it to a whole other level.
00;24;46;27 - 00;25;03;03
DP
Yeah, it would seem to me that have to go to the interior, right, and rip out all of the plasterwork and drywall and then reinsulate. So, I'm curious, a building like that, it gets a new facade, but it's not going to really change the R-value of the walls and it's still probably going to be a cold building.
00;25;03;06 - 00;25;28;21
CW
Right, there is that. And then a lot of times people say, well, I can put in these super-duper windows. And I'm like, Yeah, but your walls are not insulated at all. And you have a PTAC unit, which is basically a hole in the wall. So, you have to look at the balance of how to accomplish what it is you need to accomplish. But we look at the materials and the VOCs, and the location where things are made as well plays into sustainability.
00;25;28;21 - 00;25;29;29
DP
Yeah, it is what it is.
00;25;30;00 -00;26;06;06
CW
Yeah. I was on the Energy Code review Committee, as you mentioned, the advisory committee, but one of the reasons I signed up for that is because it does not answer existing buildings to the extent that I think it should, given that it's the New York City Energy Code and there's still some gaps in there. But, you know, we're conserving these buildings, we’re restoring them, we're not tearing down and building new ones.
And so that's good for the environment. But then how can we make a realistic energy code that you can apply to all of these existing conditions that we can't just change?
00;26;06;09 - 00;26;09;13
DP
I think it's wonderful. It's something most people don't think about.
00;26;09;20 - 00;26;38;04
CW
They don't know. And I lectured for Urban Green on the Energy Code. I gave a scintillating seven-hour long lecture. I ran out of words, though, during COVID, I couldn't do it on a screen. So, I tell my kids I ran out of words because there are a lot of words, but I think even sometimes the people that I was lecturing to depending on, you know, like you said, a normal architecture firm isn't thinking about this stuff because they're not dealing with existing building. They're dealing with a plot of land.
00;26;38;06 - 00;26;59;27
DP
So, Christa, you've been an architect for some time. Based on what you know today about being an architect, do you have any words of advice for either your younger self or young architects coming up? Because what you do is a little different - the 70% of the work that you guys do - is really very different from what many architects end up doing when they get out of school.
00;27;00;05 - 00;27;33;04
CW
One word of advice is not to be too married to the thought of what you think you want to do and to try different things, and you might really find something that surprises you, that you do. I've found along the way I've done some projects I would never imagine when I was in school that I would do something like that, and I really enjoyed it.
When you go to school, you have a vision, I'm going to do this. I want to do this. And if you just open yourself up to different projects and you might find something that really makes an impression on you.
00;27;33;11 - 00;27;35;23
DP
Yeah. What clearly worked for you?
00;27;35;25 - 00;28;13;05
CW
Yeah. And to my younger self, I don't know that I have advised my younger self because I don't know how much I've changed, but I always felt like if you're doing what you enjoy and you're with people that you enjoy doing it with, then little things that might be irksome to contemporary youth don't really register. They're not important in the long run, and you have to see the big picture.
I mean, did I think when I was hired, did I think when I was 23, someday I’ll own the company? No, I didn't think that, but it happened. So you never know. Hard work and a lot of luck is what gets you where you want to be.
00;28;13;10 - 00;28;19;29
DP
Christa, it's been great to have you here. Thanks for your time. Where can people go to learn more about CTA architects and yourself?
00;28;20;02 - 00;28;44;21
CW
We have a website. It's www.ctaarchitects, all one-word dotcom where we showcase all of our finest work. Sometimes people look at our website and get a little, oh that's very fancy, but I always say it's your portfolio, it's your best, but there's everything in there. There's all this stuff that we do that doesn't make it to the portfolio level that's necessary.
00;28;44;24 - 00;28;46;15
DP
Well, thank you very much. Been great to have you.
00;28;46;19 - 00;28;51;09
CW
Thank you for having me. It was nice talking.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!
Design Vault Ep. 14 Lorne Rose Architects with Lorne Rose
ABOUT THE ARCHITECT:
|
Lorne has a true passion for architecture and is inspired by his clients. He loves nothing more than delivering a family the home of their dreams.
Lorne lives in the Lytton Park neighbourhood of Toronto with his family. When he does have free time he loves to coach hockey, work in his garden and travel. Trips to Europe and Africa provide architectural inspiration and many subjects for his newest passion, photography.
|
|---|
Tudor House
designed by Lorne Rose Architects
TRANSCRIPT
00;00;00;02 - 00;00;05;08
Doug Pat (DP)
Let's go inside the vault. The design vault.
00;00;05;10 - 00;00;25;28
Lorne Rose (LR)
They wanted a spacious two car garage with mudroom, and then they like to entertain. So a combined living room, dining room, and then a kitchen. They love to cook. And then a beautiful two-story family room. That's all done at hundred-year-old occupied a beautiful room that some people think looks like a small chapel.
00;00;26;00 - 00;02;37;16
DP
This is my guest, Lorne Rose. I'll share more about him shortly. Today, we're going to talk about Lauren's Tudor home in Toronto. The neighborhood has a number of esthetically diverse architectural gems from the turn of the century, including a traditional Tudor that served as inspiration. Lauren's Tudor home features a variety of signature Tudor brick patterns from diagonal and herringbone to basket weave.
The traditional half timber board work has been replaced with stone and a carved stone belt course that runs across the front facade, separates stone veneer at the base, a steep gable stance across all facades, giving it order and magnifying the Tudor style. The roof is cedar shingle and the overhangs are traditional. The rear of the house has a spacious covered porch with wonderful wood.
Details, and the opposite side features a carved stone entry and a large wood and glass front door. The front landscape is organized, yet slightly whimsical, with a U-shaped drive. The backyard, in contrast, has an oval shaped lawn area surrounded by garden walls, apple trees and a vegetable garden.
Hi, I'm Doug Pat, and this is Design Vault. Lorne Rose Architect was established in Toronto in 1995 as Rose Pegasus Architects Inc. In 2000, his firm became Lorne Rose Architects. Lorne had an idea long ago at the age of ten, in fact, that he wanted to be an architect. He eventually attended the Ohio State University, receiving his Bachelor of Science in Architecture and his master's degree from the University of Michigan. In his practice, Lorne prides himself as hands on and intimately involved in every residential architecture project that comes through the door down to the last detail.
Lorne’s firm has completed many projects, including work in the United States and Canada. Lorne lives in Toronto with his family. He also coaches hockey travels and loves photography. Welcome, Lauren. Nice to have you with us today. So tell us a little bit about Lorne Rose, architect in Toronto. So where are you guys located? Toronto? What's the size of the firm and what type of work do you do?
00;02;37;22 - 00;03;07;16
LR
First of all, thank you for having me. So we are a small critique firm, the architectural side. We are myself and two others. Right now we do have an interior design firm called Empress Design and have recently taken on my side partner who is going to be a partner at the architectural firm. So the architectural side right now it's three of us and that interior design side there is probably about seven, and that supports jobs counting receptions.
00;03;07;18 - 00;03;09;27
DP
And to do only residential work.
00;03;10;00 - 00;03;36;03
LR
We're known for our residential work, but we do do some commercial work, some community work in terms of residential neighborhoods. Oftentimes, it's my residential clients who ask me to do some of their subdivision work or commercial work for them. We are located in Forest Hill neighborhood. Our office is kind of unique. It's really just like a house, except in this case, the kitchen is on the third floor and offices basement ground in second.
00;03;36;05 - 00;03;46;25
DP
So tell us a little bit about yourself. Your original firm was started in 1995, then transitioned in 2000. Tell us a little bit about that and then your role in the office currently.
00;03;46;27 - 00;04;31;15
LR
So I made the job was turning 30. Just got pregnant with her first son and decided it was time to leave. The firm that I was at. Enterprise just set me up in business. Taught me a lot. Worked together with him for many years. He was specialized in new work, high rise work. But I specialized in the residential, and it's really my passion that's dealing with the clients hands on.
The turnaround of projects is a little quicker and not working on a condo for two years or less. So we sort of finally decided that he had no interest in the small residential, which was my passion. So we just separated the first store out of the same office and still I wrote to my new office about six years ago or so.
00;04;31;22 - 00;04;33;24
DP
He's still practicing architecture as well.
00;04;33;26 - 00;04;44;14
LR
Andrew has actually, I think, retired. Some of his associates have taken it over. That first couple, Rafael Augustus, and they're quite successful still friendly with him.
00;04;44;16 - 00;04;56;29
DP
That's great. Now, you had mentioned residential contracts. I'm always curious, most of the jobs that you take on residential projects, how long do they take from kind of start to finish Client walks in the door to they got the keys to the front door.
00;04;57;04 - 00;05;23;01
LR
Right. So typically, I'll tell a client the municipal process in here is quite long. So from the day they hire me to the day they put a shovel in the ground, could be anywhere from 6 to 12 months. Used to take 10 to 12 months to build a house. But since COVID hit, Toronto may be different than other cities that exploded here, we've never been more busy than we were during COVID.
So you're looking at 12 to 18 months to build a home here now.
00;05;23;08 - 00;05;31;11
DP
I mean, it's kind of surprising. As a US citizen, I always hear about how expensive Canada is. And Toronto's extraordinary, isn't it?
00;05;31;17 - 00;06;23;17
LR
It is extraordinary beyond belief. It's surprisingly the fourth largest city in North America. I've been wrong about everything. During COVID, we thought the market would crash. Interest rates were extremely low and people were just buying up homes. People were tired of their own homes. They would renovate or they would actually, surprisingly, they left their neighbors. They decided to tear down their perfectly good house because the cost of getting it aged what we have here called land transfer tax and buy a new home, a tax on new people, said, you know what, I love my street, my neighborhood.
I'm going to tear down this somewhat good home and build a new home. So the industry exploded it very, very expensive to build a house in Toronto because the trades had actually good for too long. It seems to be slowing down a little bit now. But as I said, I'd be wrong about everything. Sure.
00;06;23;19 - 00;06;24;04
DP
You're not.
00;06;24;04 - 00;06;26;20
LR
Alone. I'm not going to make predictions.
00;06;26;23 - 00;06;34;19
DP
Yeah. So today we're going to talk about a Tudor home project that you did. What was the year that it was built and approximately where is it?
00;06;34;23 - 00;07;10;21
LR
So it's in the neighborhood. It was 13 years ago that my clients are again. So we probably started it 15 years ago. It's in a neighborhood or a street that did not have many houses on it. The owner moved a block east. They elected a tutor house that they renovated and decided to do a new Tudor house on this lot.
Since that time, the street has exploded and there are probably six or seven houses under construction on the street, many of which I am doing, which is nice. I don't do also.
00;07;10;25 - 00;07;13;24
DP
So there was nothing on the property when you built that house.
00;07;13;26 - 00;07;30;29
LR
There was an okay Tudor style home in Toronto. Land is at a premium and people are buying perfectly good homes and tearing them down. The home that was there did not meet the client's needs, so tore it down and designed a new house.
00;07;31;01 - 00;07;32;24
DP
And how big was the lot and truck?
00;07;32;24 - 00;07;40;19
LR
So we go by frontage which is very different states. So it was a 64 foot lot by 175 feet.
00;07;40;22 - 00;07;45;21
DP
That 100 foot dimension. Is that the entire length or just the street front?
00;07;45;23 - 00;07;48;05
LR
175 feet long.
00;07;48;12 - 00;07;49;08
DP
Front to back.
00;07;49;09 - 00;08;07;00
LR
Yeah, 64 feet wide. The street is predominately 50 foot lots, so this is probably the widest lot on the street. Right. You went to other 60 footers decided. I think there's a few fourth graders. That's how we call them here. 50 footers for this region.
00;08;07;02 - 00;08;09;22
DP
What were the programmatic requirements for the clients?
00;08;09;24 - 00;09;42;03
LR
Most important things were a two car garage with that mudroom attached garage. Previous house, they had had a detached garage and they never park your car in the back. And as you know, we deal with a lot of snow here, clients. So shoveling the driveway, all that. And then people put junk in there in their garages. So they wanted a spacious two car garage with mudroom and then they like to entertain.
So a combined living room, dining room, the living room here is going a little bit to where a general over these days we're finding people are using them. You have the most expensive furniture and nobody sits in them. They sit in a family room or great room. This family needed a combined living room, dining room because they like to have dining parties, so they could expand their dining table into the living room.
Living room has a piano, just table. That's it. It's mostly dinner just to expand for family occasions, holidays where they host large parties and then a kitchen. They love to cook a great inventory. It's very five feet by 14 feet long, very well organized with an extra fridge, whole wall of spices and sauce charged space, and then a beautiful two story family room.
That's all done at our hundred year old time. There was a dream of the homeowner to do a room out of 100 year old, not a pine. So it was all party boards carved and played down to create a beautiful room that some people think looks like a small chapel.
00;09;42;05 - 00;09;44;08
DP
So how many square feet is the house total?
00;09;44;16 - 00;09;57;06
LR
The home is about 5000 square feet, four bedrooms for best two children. The wife was from the States, so they often have family ties to the business suite at all. Work lunch.
00;09;57;09 - 00;09;59;27
DP
That's awesome. A homework, lunches get used.
00;10;00;01 - 00;10;07;21
LR
It did before the kids moved out. And now she's fighting the headstone for doing some of his hobby work.
00;10;07;23 - 00;10;15;22
DP
So in plan. Then when I looked at the elevations of the building, it looks like a large rectangle set, Correct? Or is it way more complex than that?
00;10;15;24 - 00;10;38;17
LR
It is. The floorplan is garage on the left side looking at the home office across the front door and then the window that is the piano area in the living room. There's actually a garden shed at the back which is attached to the house strip and turn into a cabana the car in order to have a pool because they need it.
So it's a garden shed. They like to garden.
00;10;38;19 - 00;10;42;24
DP
So is the site completely flat? No. Unique topographic features.
00;10;42;26 - 00;10;55;08
LR
Pretty much flat. So much so that the homeowner had to do two huge drainage pits to ensure that drainage worked. The area has a lot of clay in the soil, so it doesn't drain that well.
00;10;55;10 - 00;11;04;18
DP
So this next question is going to be interesting because I'm sure it's at least a little different from the U.S. What were the project restrictions like zoning codes, etc.?
00;11;04;20 - 00;11;35;22
LR
There were variances to the bylaw. We were required to have five front side yard setbacks. We have four foot sideboard setbacks. The density in this neighborhood go by 35% of the lot area is what gross floor area we were slightly over. Not very common in the area to go over 35 is antiquated. Most homes are going to be few across the street.
We did renovation on a smaller block, but we were at 90%. It's not uncommon to get the variance for the density.
00;11;35;24 - 00;11;36;24
DP
And how many stories?
00;11;37;01 - 00;12;12;21
LR
Two stories lot of people thought it had for its story. It could have had a third story, but the family didn't need more space. The covered porch was another very important requirement for the family and served them very well during COVID. Like some parts of the United States where people worked as servants of the rules, Canadians, I can say, were quite observant.
So it was a great place. Covered portraits, heaters for entertaining in the fall. Even in the winter, on a warmer day, family could entertain outside with guests, nice barbecuing area, a dining area sitting here.
00;12;12;24 - 00;12;22;29
DP
So tell us a little bit about the style choice. You had said that the neighborhood had a Tudor style home that you really liked before you designed this one.
00;12;23;06 - 00;13;56;28
LR
Yeah, there were some Tudor, a lot of postwar architecture. Toronto is very much influenced by English architecture, especially at the time. But the home that was an inspiration for this one was a much smaller home for us. So village near where my office is, it was a much smaller home that had beautiful brickwork and the Midband was a homage to that house in Forest Hill, where you describe it, is it orange segment carving it would have been done out of wood on the original house.
These beautiful brick patterns which you would see on other homes or so village that really caught my eye. And nobody really replicates properly these days in addition of spores that were carved, details like that on the old Tudor homes from the turn of the century in the revival of these styles are always left out. So we really wanted to do it correctly on this home, and the homeowner spent extra money to do it properly and more authentic.
Subsequent to that, there were quasi replicas of this house that popped up. People chortle when they see something they like. We started emulating it, but I don't take it as a sense to take it as a form of compliment. I didn't invent anything here. I was borrowing from collecting borrowing details from architecture styles in Italy, and I do it with any style in modern or Georgian or French provincial.
I like to use the most authentic details that clients will allow us to afford.
00;13;57;00 - 00;14;02;20
DP
So was there ever any question then in your mind that this House could be something other than brick?
00;14;02;22 - 00;14;29;19
LR
There were examples that I looked at as well, where the second floor rather than brick, you could use some of these patterns in stone, but red brick was dear to the owners liking, and I don't think there was really another option in this item where the house is a stone skirt, the rocks around the house, but the rest of the house's brick.
And while many people do a out of all stone sites and red brick, it allowed us to tie to breaking all the way around the house.
00;14;29;21 - 00;14;39;07
DP
What I think is really pretty when you look at the exterior gables, the half timber construction has become stone. Talk a little bit about that and where have you seen that in the past?
00;14;39;09 - 00;15;13;00
LR
There were some examples I've seen in the city, but for the most part, even on a lot of houses, we knew that our Tudor will have a cornice, detail are winters are harsh or weather is harsh or summers are hot, sticky and we have extremes. The thought of painting wood timbers, half timbers every now and then was not something the homeowner wanted to do, so we suggested doing them out of stone.
There's no way. So we've done that a couple of times. Just to cut down on this. There are some parts that are would not allow this house the stone.
00;15;13;00 - 00;15;26;17
DP
Details on this home are absolutely stunning. This carved front entry left and right. They did this little custom rose after your name. Now, where did you find somebody that does that? I mean, unbelievable.
00;15;26;19 - 00;16;35;22
LR
Funny enough, little story about the limestone on this house. It came from Indiana and were horrible. What I learned during this house is that Indiana supplies great stone. But in the future, I would never let them cut the stone. We have some great stonemasons in Toronto. We actually had to have some of them fix up the stone that was originally carved in Indiana.
But nowadays we ship the blocks out from Indiana and everything is carved here. I learned that on this house. So we have tons of great carvers here. The guy who did this house is Romanian and he worked for a school back in a communist Romania. And so a lot of great talent from Europe. Toronto is a melting pot, as is Canada, people from all over the world.
So there's no shortage of great transport, although I shouldn't say that as they're aging those artisans, the children do not want to follow in their parents footsteps. So I hope it won't be a lost art. But that's where the C and C machines of today computers are allowing us to still allow for those carved rosettes.
00;16;35;24 - 00;16;39;26
DP
So did you have any challenges finding a good brick Mason No.
00;16;39;26 - 00;16;56;08
LR
In fact, shared signature digitally had always been one of the best masons in Toronto, and I asked to take care of during makes my hair usually mostly stone. He didn't really want to do the brick, but when he saw the intricate brick patterns, it grated your brickwork as well.
00;16;56;16 - 00;17;03;26
DP
So Lorne, we were just talking about the brick. Could you tell us a little bit about the color and whether or not it was a special mixture?
00;17;04;02 - 00;17;51;11
LR
Yeah, at the time I was dealing with a gentleman named Isaac Raposo from King Masonry. Now he had an idea. We worked with Isaac for years. It came straight out of the company's work that he was passionate about brick and Stone. So he said to me, Lord, I have this special brick that's being used in university states, and it's Glengarry brick, and it's 85% Shenandoah and 50% Colt 50 3dd It's been used at the university.
It had a nice tonal range, some fire bricks in there, so it wasn't all flat coloring, a great deal of variation on the brick. And I said, Great, let's do it. Isaac was instrumental in suggesting that Brick and other clients have used a similar mix.
00;17;51;18 - 00;18;01;07
DP
So were there any unique construction details using masonry or brick on the home? Anything that you had never done before? Anything that you do a lot.
00;18;01;10 - 00;19;27;06
LR
This was the first time that I used the stone boards at six feet to bring, and it was the first time, I believe, that these different brick patterns on a house. So it was challenging for the Masons. I remember calls about how do you want to do this? Even on the stonework, we had some smoother blocks, but I wanted them chiseled with different patterns on them, really authentic stuff.
I didn't want perfectly aligned joints. I wanted it a little bit. I called it messy, but when it's done perfectly linear, you can spend the money on a real stone. It doesn't look real because it's so perfectly laid up. Bellies were put on a lot of the stones chopping the edges off. It's a little bit of a mess.
Your joint, Chino. I like to call it a rock joint. I was particular about the laying of the stone brick and quite happy with the way it turned out. The chimneys are quite detailed with different patterns as well. And limestone caps. One of the things I like to do is put superior clay chili pots on jumbo ones. One of the details I loved in traveling in England and there would have many chimneys and different clay pots on top of each.
Normally on our homes we put two of the same. I wanted to do something a little more British and mix them up. So each chimney has two different pots on it just for fun.
00;19;27;09 - 00;19;42;15
DP
So when it comes to a lot of these details, brick coursing, etc., do you guys end up doing a lot of a variety of drawings, series of iterations, looking at different patterns and then go out into the field and look at examples that the Mason puts together? How do you guys do that?
00;19;42;22 - 00;20;03;08
LR
That sounds a little more romantic than how it actually happened. I do have some great books on brickwork that I get to reference, but it was more the Mason gene and I just sitting out there and discussing them and looking at what we could really do. Not quite as romantic as drawing it all.
00;20;03;10 - 00;20;11;15
DP
Yeah, but it's a little more authentic in terms of how we used to do things as architects, right? Walk out onto the site, you tell people what to do so.
00;20;11;17 - 00;20;21;15
LR
That Gino is up for the challenge. We laid them out on the ground just to verify. I had ideas of what I wanted, but we did actually draw on that.
00;20;21;18 - 00;20;26;27
DP
So when you drew the building, are you guys using CAD? Are you drawing in 2D or are you drawing in 3D?
00;20;27;04 - 00;20;49;23
LR
I'm a little bit of a dinosaur. I'm going around my office. Who doesn't use AutoCAD? We now use Revit as well. I know how to use it, but every time I come to the computer, that stuff, you get away with it. I have two very talented staff, one staff member with me 23 years. They sort of know how I think that makes the office much more efficient.
00;20;49;26 - 00;20;59;19
DP
So I'm sure Toronto has rules about energy efficiency. Was sustainability an issue when you built the home in terms of the wall cavities, etc.?
00;20;59;21 - 00;22;19;19
LR
There were some things that we did here differently. I think our energy efficiency rules came into play a little bit more after this House would interconnect. But one of the things differently down here, it's normally called psychiatrist's insulation in the walls. In this case, we did two inches of £2 spread foam against the plywood, more airtight and a higher insulation lets you go over four inches a spray for the added impact of going to six inches is not necessarily worthy.
So we did two inches a separate fall and then three and a half inches of fiberglass insulation to give us a little bit higher our value at the time the spray fall thing was relatively new. The building department wasn't sure if there was still a void, how to deal with it still needed paper barrier. You don't necessarily need it anymore.
We did a blended version and built it. Department accepted it, still liked the system. It was cost effective way to get the air tightness and fill the void. Insulation nowadays where champ moving more to at least one inch exterior insulation and air space. Then Brick, our next building code will probably make that mandatory. And that way you don't lose as much thermal value through the stud cavities.
00;22;19;22 - 00;22;28;06
DP
So I know you do a lot of homes. Was there anything that you or your team learned during the process of building this one, designing it and having it built?
00;22;28;09 - 00;22;53;19
LR
Yes. When you specify certain forgeries dressed, let the lumber yard use a different kind of floor choice. There is a few problems with that. But aside from that, things went relatively urban innovation at home and did a great job. One of the things we did that was unique here. I like skylights a lot, but I don't like looking through a skylight well and seeing the clouds.
00;22;53;21 - 00;23;19;21
LR
So we do these lenses, frosted lenses, they look great, except they can get irksome. So there's a mechanical room in the roof here. So through access, through the mechanical room, it's a little boardwalk where the homeowner can't actually open up a door and vacuum the box off of the skylight. Let's just get rid of this box and we'll have the box get in there.
But they do look up. You know, I see books. That's great.
00;23;19;21 - 00;23;28;25
DP
Very creative spoken just like an architect. So you've been an architect for a long time. If you could give your younger self some career advice, what would it be?
00;23;28;28 - 00;23;29;24
LR
Wow.
00;23;29;27 - 00;23;31;21
DP
We're always learning as architects.
00;23;31;23 - 00;23;40;27
LR
That's a great question. It's not an uncommon question, but I've never really thought about it. I'm passionate and love architectural history and I learned a lot from it.
00;23;41;02 - 00;24;13;09
DP
You know, when I went to college, architectural history was a class I had to take, and it wasn't something that I really enjoyed. And ultimately I ended up with a YouTube channel. And all I do, or most of what I did for many years is make videos about historical architecture, right? So you never really know when you're going to use that information and how passionate you might become about something would seem to me, looking at the breadth of the work that you've done online, that you've got a really nice historical background that you're utilizing all the time.
00;24;13;09 - 00;24;21;17
DP
And it would seem to me if I was the younger you, I'd say to you, Look, man, pay attention, because you're going to be using all this information someday.
00;24;21;19 - 00;25;35;13
LR
So it's interesting. It's an architecture school was great. And the worst part about architecture history, which I loved, was that it was an 80 year class which any college students thought was awful and it was like three times a week. And you'd go to this class tired as can be, and the first thing they do is turn off the lights and show you slides.
So it was hard to stay awake, but I never anticipated the stuff that I did see, which was influenced by Peter Eisenman, who was there at the time, was nothing traditional. And just like I say to anybody, architect, just pay attention to trigonometry. Yes, you do use it. Toronto's a very traditional city. If I had lived in another city, I might have done more modern architecture in my career.
Now we're doing a ton of it and I love it. But just like, you know, Picasso was a classical painter before he did, where he did the traditional architecture and studying the masters in scale proportion, that's the talent that somebody gave me that I can see a proportion. I learned it through architecture styles, and then you can apply that to any style.
So I think that's paying attention in those classes as hard as they were when the lights were really made a difference in my career.
00;25;35;15 - 00;25;42;10
DP
Lauren, it's been great to have you here. Thanks for your time. Where can people go to learn more about Lorne Rose, Architect Inc and yourself?
00;25;42;17 - 00;25;52;14
LR
Lorne Rose dot com And it's not a popular name in the United States. It's very popular Canada the sixties it's aloha Annie RC dot com.
00;25;52;17 - 00;25;53;28
DP
Are you guys on Instagram.
00;25;54;01 - 00;26;09;21
LR
We are. I have to say I'm terrible at social media and I should be doing more because a lot of Americans have reached out based on some of the social media I need to concentrate more on. Yes, I am on Instagram and learn search. So yeah, please look us up.
00;26;09;27 - 00;26;14;02
DP
Well, it sounds like you're very busy. It was wonderful to have you here. Thank you so much for your time, Lorne.
00;26;14;04 - 00;26;18;02
LR
Thank you for having me. It's fun.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!
Design Vault Ep. 13 Smart Design Studio with William Smart
ABOUT THE ARCHITECT:
|
William Smart is the Founder and Creative Director of Smart Design Studio, established in 1998. His approach to design is holistic, combining both architectural and interior design with passionate attention to detail. Over the past 23 years, Smart Design Studio has delivered a wide range of projects ranging from large-scale master planning, cultural buildings, offices, workplaces to private houses and product design. Although varied in scale, the projects are united by an ethos of “Architecture from the Inside Out”. |
|---|
Smart Design Studio
Smart Design
View ProjectTRANSCRIPT
00;00;00;02 - 00;00;05;17
Doug Pat (DP)
Let's go inside the vault. The design vault.
00;00;05;19 - 00;00;30;25
William Smart (WS)
The approval authority wants us to respect how it looks from the outside and how it integrates with the streetscape, with the materials of the area, which is predominantly brick with sawtooth roofs. And they also want you to kind of reinforce and retain the great character of the precinct. So to keep these big, large, open plan offices with sawtooth roofs, I feel as a designer, we nailed it. We really got the design exactly right.
00;00;30;27 - 00;03;09;28
DP
This is my guest, William Smart. I'll share more about him shortly. In this episode from the Design Vault will highlight William’s new Smart Design Studio building. The new Smart Design Studio is an innovative, sustainable and sculptural building with both new and renovated facades that sit within an inner city conservation area of brick warehouses. The design relates to the industrial buildings from the precinct.
While it makes a departure with a modern facade of tiles, galvanized sheeting, steel frame windows and dynamic forms of curling and curving brick. Structurally, a large portion of the building feels industrial with precast concrete slabs, structural brick roof vaults and steel. Environmentally, the naturally lit and ventilated studio collects its own water and generates its own power, creating a carbon neutral building.
In addition, large full length clear story windows enable natural light to enter the single industrial scale workspace. The Sawtooth roof trusses and a portion of the facades were retained with the exception of the offices on the western street frontage. That's where a narrow, highly designed apartment runs atop the length of the building. The apartment features four self-supporting offset brick, catenary vaults that allow light into the apartment.
Hi, I'm Doug Pat and this is Design Vault. William Smart is a fellow of the Australian Institute of Architects. He's also the founder and creative director of Smart Design Studio, established in 1998. The Office is a multi-disciplined design studio offering professional services and architecture, interior architecture and design. Over the past 23 years, Smart Design Studio has delivered a wide range of projects from large scale master planning, cultural buildings, offices, workplaces to private houses and product design.
Smart Design Studio’s buildings have received critical acclaim since its inception , SDS has received over 50 international and national awards for architecture, urban design and interior design. William was also the recipient of Indie Award’s Luminary Award. Williams taught and lectured across Australia, published written work and is an active participant in the design community. So welcome, William. Nice to have you with us today.
Before we get started, tell us a little bit about Smart Design Studio. So you're coming to us from about 16,000 kilometers away. So tell us where you're located. What's the size of your firm and the type of work that you do.
00;03;09;28 - 00;04;33;03
WS
Doug It's a real pleasure to be here. Our studio is located in Sydney, which is on the east coast of Australia, and it's a temperate climate, so subtropical. So like today's the middle of winter, the maximum temperature will be 18 degrees Celsius in summer it gets quite warm, reasonably humid, but not quite tropical. It's quite a nice environment.
I'll talk about that in more detail because we've tried to do a very sustainable project for our offices, but we've been running for about 25 years now and with 50 people and we think that's just the perfect size for us because we can do some large projects that run over many years and we can do some small detail projects that allow us to be more innovative or to get a level of detail to explore and develop.
And we love integrating architecture and interiors and view it as one and through our own way of working, we've developed a methodology which we call design from the inside out or architecture from the inside out. And so we try to think of our buildings from the interior perspective. First, what is the space we're making? How do the occupants use the building?
And then we work through from that perspective toward the outside of the building and try to build an armature around it that's responsible, sustainable, complements the character of the community that we live in as well and tries to synthesize all those things together. But the approach is definitely to build it from the internal spaces.
00;04;33;06 - 00;04;34;20
DP
So form follows function.
00;04;34;20 - 00;05;25;19
WS
Absolutely form follows function. But we also think you can be really powerful with form and you can develop emotive responses to form. So just in that idea of internal spaces, we think that in a really great building, and the best of ours achieve this, you take someone to a moment when they go, Whoa, this is amazing, this is beautiful.
And sometimes that's more than the functionality. It can be just an internal space where there's a staircase or a vista or place you go to that's a surprising experience. And I'm often in my mind imagining how an occupant or a user of the building will circulate through it, how they will walk into a room, what the transition of light is from outside, inside and from one room to another.
And how they go to this place and think, Wow, I wasn't expecting this at all.
00;05;25;21 - 00;05;27;03
DP
That's a beautiful description.
00;05;27;10 - 00;05;27;22
WS
Thank you.
00;05;27;29 - 00;05;33;06
DP
Absolutely. So I was on your website, pretty extensive. What type of projects do you guys take?
00;05;33;12 - 00;06;56;17
WS
Well, we've been running for 25 years now, and that means we've really grown the company into a place where we can be careful about the projects we take. So we are looking for projects where we can design the architecture and the interiors as one. And that's borne out of our philosophy of how we work. And we're also looking for projects where we can achieve a lot of detail, and that doesn't necessarily mean we need to use expensive materials.
We actually quite like inexpensive materials, things like the everyday brick is something we're in love with and how we use that is probably where the innovation starts. But we like to do architecture and interiors has one a lot of detail and work on projects from start to end so we can really achieve the details and in that we prefer to have a range of projects.
So at least half of our work are residential projects and they can vary from large apartment buildings where there's more complex of buildings down to small houses and everything in between. And then we also do a few commercial projects, cultural projects such as art galleries, or recently we finished Science Gallery in Melbourne, which is about the fusion of art and science in this new space.
And we use architecture to bring the two together and then we also tend to end up working on a few product design projects as well. So door handles, grip rails, other things going down into there. Very fine detail is something that we love doing concurrently.
00;06;56;24 - 00;07;04;18
DP
That's really cool. I have a lot of questions. We'll get to them in just a minute. So tell us a little bit about yourself. So how did you start Smart Design Studio?
00;07;04;24 - 00;08;50;03
WS
I started my own design studio in ‘98, so 25 years ago. And after graduating, I worked in France for a year and a half and learned about traditional ways of building. Following that, I worked for just over three years at Foster and Partners in London, which is a very big commercial practice and has built a number of buildings in the US.
And then I came back to Australia in ‘96 for the Olympics and I wanted to work on an Olympic project and I wanted to try living in Sydney because I grew up in the country, in Western Australia, in the outback, and I moved to Sydney to work on the railway station at the Olympic site. So I've gone from working on large projects and as that last project was nearing to an end, I felt this need to set up my own studio and do my own projects.
And I chose that name without having any projects in mind or in place. I thought I had something to say and I didn't know what it was, but I just felt I had a voice and I needed to create a platform to develop my own voice. And I wasn't getting that in working for other practices because I was channeling the voice of that practice.
So that's why I set it up and it's taken really sort of 15 years to find out what that voice is. I had things I liked I was interested in. There weren't always the budgets on the first few projects to achieve those things, but over time we've developed these interests in materials who work with the details, who work with the forms, the collaborations with other architects or engineers or other consultants and contractors, and have kind of come up with some buildings that are remarkable that people think and ask us, How did you do that? How was that made? How could you do all that? It seems unbelievable, which is great. I think that's what I wanted to do when I started this practice 25 years ago.
00;08;50;09 - 00;09;02;00
DP
It's great. I have some of the same questions for you today about your building. So clearly when you got started, your office was relatively small. You've grown to 50 people. What's your role in the office now?
00;09;02;02 - 00;10;17;06
WS
How I see my role is to kind of help guide a large team of people towards the great outcome. So we need to achieve. So my favorite thing is preparing drawings or writing specifications. I like that more than the other stuff that comes with running a company of this size and often there's a lot of meetings. But this morning I just was in an early morning meeting with some contractors about trying to nut out some key details that we couldn't let go of on a new commercial building we're doing.
And then the project architect that's running that's doing an amazing job, but at this moment needs me to come in and say to the contractors, this is the way it's going to be. We've got to document and develop in that way. So that's kind of how I end up steering things. And I work four days a week from Sydney and then one or two days a week out of town and on that day I try to sit down on the drawing board and not our new projects or complex projects, but I love that drawing time.
So I'm kind of like a person in the team that's almost like a coach that tries to help everybody get to the right place and at times I'll step in and lend a hand and at times I'll be working in the background, checking things and reviewing things and trying to help develop the direction of projects. But it's sort of like this really strong helping role that I've developed over time.
00;10;17;09 - 00;10;23;05
DP
I'm sure this varies, but how many projects do you typically have in the office running at the same time?
00;10;23;05 - 00;11;21;10
WS
I would say there's probably about 20 active projects at the moment and from that we would have three or four that are going through planning approval processes. And in Australia that's very slow. It takes probably a year for us to get planning consent on a project and they don't take a lot of work, but they take sporadic pieces of work.
So accounts who might come back and say change this time or work on that for a short while. So maybe five or six projects in those stages. We've always got a couple in preparing for planning. We've normally got a few in the documentation stage and then we’ve normally got half a dozen or even more at the moment that are under construction.
And some of those are very large projects that go over three or four years and then some of them are smaller ones. It might be a year or a year and a half, but it just naturally works out that somehow it's all fairly evenly spread between all the different stages, and it means that we can resource it well and improve on our systems and ways of documenting from the work we're building on site all the time.
00;11;21;13 - 00;11;41;15
DP
Well, it certainly sounds interesting for you because you get to bounce around on a lot of different projects at different stages in the process, so it sounds like a lot of fun. So let's dig in here and talk about our building. Tell us about the new Smart Design Studio. So how long have you guys been in your current location and before that, what was your original location?
00;11;41;18 - 00;14;32;23
WS
Before this, we were in an area in Sydney called Surry Hills, which is kind of a beautiful, quite central, historic part of town. And we moved to this new industrial area that's being transformed at the moment, halfway between the center of Sydney and the airport. And that means we're actually only four kilometers from the city center because our main airports very close to town.
What attracted us to this particular area was that we could get a very large piece of land at a relatively inexpensive price and build a studio where the whole of the team could work on one floor. And linked into that is a desire to not grow anymore. We've sort of arrived at 50, for us that’s the perfect size. We can do some large projects, some small ones, and control all of the stage as well.
So we do want to grow anymore. But we did recognize that from our last project and our last office that we needed to all be in one room and work from that space. So we bought an old warehouse building in a conservation area. And for us that means that it's not a heritage listed item, so you can make changes to it.
And quite extensive changes, but you've got to work within the character of the area and the approval authority wants us to respect how it looks from the outside and how it integrates with the streetscape, with the materials of the area, which is predominantly brick with sorted roofs. And I also want you to kind of reinforce and retain the great character of the precinct and to do that internally.
So to keep these big, large, open plan offices with sorted roofs. And that just worked perfectly for how we wanted to use that particular space. So we have an office of about 800 square meters just over. So it's almost 20 square meters per person. It's like a lot of room because we've had our own office before. We've understood what it is that we need and how we work and what the best range would be.
And I feel as a designer, we nailed it. We really got the design exactly right. So it's one big room which is about 20 by 20 meters. And then on the outside of that, we have four separate rooms, one for model making. One is a kind of breakout space, what we call the canteen. One is a materials library, and then the last one is the front of house and meeting room area.
And so the activities that need to be segregated from the main working space are on the outside of that, but within the same volume and then the central space is flooded with natural light and has a beautiful acoustic to it. So you can hear the sound of people talking, but you actually can't hear what they're saying. So it doesn't take your attention away from what you're doing.
It's a really great space to work in. And one of the interesting things is we make a lot of models, we do a lot of hand drawings. All the walls are pinned up with work, and then there's maybe more than 100 models in various states of completion or degradation, over time through the studio space. So you feel like you've walked into this creative space where work is being developed and being designed on the run.
00;14;33;00 - 00;14;51;25
DP
So I've always found that it's really hard to be my own client. And I'm kind of wondering, so you first lay out the programmatic requirements and as you start designing, did that evolve? Did the program change a little bit for you? What was a client like? Just kidding. And did you know right away what you wanted?
00;14;51;28 - 00;16;06;23
WS
I've done a few projects for myself now and I'm designing a couple more and I love working for myself. I don't find it hard being my own client. The only sticking point every time is budget. Actually, I always run over budget dramatically and have to find a way of making that work. But I love designing for myself and the main studio spaces who are designing it.
And in fact the whole building almost felt like it designed itself. I didn't even feel like I was designing it. It just felt like it all fell into place quite easily for us. Those projects are rare, certainly the minority, but this one felt like as soon as we drew something, it felt right. And then you just made minor adjustments along the way and it kind of sold together quite beautifully.
And I feel like in just about every area, we got it really right because we put so much thought into what is it we need and how much space do we need for these kinds of materials? And you know, when we have all the models, what do you want the clients to see when they walk around the studio?
We even thought about that tour through the studio and how we would walk prospective clients and consultants through the space and tell the story of how we work and who we are. There's so many layers to the design and we had time to think about it properly and do a good job. So I feel like we've got it right.
00;16;06;23 - 00;16;11;29
DP
The final design included an apartment. Tell us a little bit about that.
00;16;12;01 - 00;17;59;16
WS
This conservation area in Sydney, what the city wants is for this to be a hub of activity and for that to not be where people live. They want businesses here, they want makers, they want microbreweries, they want art galleries, they want live music. So they're kind of trying to develop that in this particular area. So they have prohibited housing, including apartments in this area except for a caretaker's residence they allow.
So we were able to get an approval to build a caretaker's residence on this site. And that's why it's called the caretaker's residence, because it was permitted under the planning consent. And it's where I live with my partner and my dog and these catenary shaped and structural brick vaults. And there's two big ones and two small ones and the big ones are about seven meters wide and 4.2 meters high.
And the small ones are about five meters wide and 2.7 meters high. And in between these vaults, they're offset from each other, we have these large sheets of glass, and it allows light to flood into the space. I think what we were trying to do with the project on many levels is to be something that was very responsive to this precinct.
So it was a positive contribution to the heritage area that we work in. And also we wanted to just have a bit of fun with the project and do some things we didn't know how. I've been dreaming of doing beautiful vaulted brick structures like you might see in Barcelona. I've been dreaming of them for a long time and I couldn't find a client that wanted to do it because we generally get to a sticking point, which would be a conversation a bit like, Tell us about your experience in doing this.
So I haven't done it before, but I know how I can work it out and then a clients would just get to a point where that's how I want to be your guinea pig. I don't want to test this for you. So we were able to do that with ourselves and it's actually a beautiful space to be in.
00;17;59;18 - 00;18;18;17
DP
It looks really wonderful. I'm going to stop you right there because we're going to come back to the vaults. Let's talk about the building design and we'll start with the basics. So tell us a little bit about the site now. It didn't look like there were any unique topographic features. Seemed pretty straightforward and there was a building on the property already. Tell us a little bit about that.
00;18;18;19 - 00;19;35;27
WS
So there's an existing warehouse here and the front strip of that building, which was where the offices and meetings had been adjusted so many times over the past 60 years that it had lost all its integrity. And we demolished that front seven meters and rebuilt that. And then we kept the rest of the warehouse, which was about 80% of the footprint, and restored that.
And that's where that big room is in our studio. And the front strip, which is seven meters wide, has a beautiful brick vaulted facade that almost looks as though it's peeling open the brick kind of curves outwards and leans downwards. And we worked out a way to lay bricks facing downward direction and peels up again the other way.
And at the top of that three story structure, we have this apartment building which is got the four votes that we spoke of before. And so what we tried to do with the project was to use everyday ordinary materials like galvanized roof sheeting and galvanized steel windows and a very simple brick. But to take these materials and do something extraordinary with them.
So my kind of beautiful sculptural shapes or to make beautiful load bearing brick vaults. So that was one of the primary objectives and that talks to the history of the area and really relates back in a very sympathetic way to the context.
00;19;36;04 - 00;19;45;16
DP
So you'd said it was a conservation area. Were the zoning restrictions challenging for you guys? And then was the building ultimately reviewed by a review board?
00;19;45;22 - 00;21;11;18
WS
Totally. It was very well received and mostly it complies with the planning controls that the biggest challenge for us was getting this caretaker's residence approved. But one of the great initiatives of the project also was we wanted to make all our own power, collect our own water, and reuse that on onsite to be a carbon neutral building.
And the city responded very well to that. And because Sydney's quite a hot climate in summer, we need some way of controlling the climate and really stopping the sun from coming into the spaces. So we designed this sustainable building where we don't have any air conditioning in the studio or the apartment spaces and it's just naturally ventilated. And we have underfloor heating which has got hydraulic pipes that extend and wrap around through the floor and in summer they work in reverse and I call the floor and that chill the space.
And in Sydney, which has relatively high humidity, we have to manage that carefully so you don't get condensation on the floor surface. But we do all that through a building management system, which is like a computer that opens, it controls the windows, it also controls blinds, it controls the fans, it controls how much water goes through the floor and what temperature and so forth.
And tomorrow is thinking about today. And it's managing all that quite beautifully, actually. It all works extremely well. And it's a real milestone. There aren't many buildings in Sydney that are comfortable to be in without air conditioning in summer. It's just so hot here in the summer months and humid that it's a real challenge to make that work.
00;21;11;20 - 00;21;24;00
DP
Yeah, I don't understand that. So it's natural ventilation, meaning windows or open air is flowing through the building. You've got to control the humidity on the interior. How is that done?
00;21;24;03 - 00;23;32;14
WS
So how it works is the building sets up about five different climate times of the year. One of those is extremely hot and extremely cold. So they're two different times of the year. And then you have temperate and then warm and cool and then the perfect temperature. So this time of the year is a cool time of the year.
And what happens now is the windows will stay closed all day and then around midday they'll open for an hour and change the air and they'll close again. So they have little motors that open and control them. They're called actuators. And at nighttime, the building opens up all year round for either two or 5 hours, depending on whether it needs to cool down or heat up or how much air we need to change.
So big volume space, you can do this because there's so much air for the number of occupants that you don't need to have the windows open all day long. If you had a regular office building, you've got to rethink that because you run out of oxygen and people start to feel sleepy and tired. So what the building does is it kind of breathes in a way and lets the oxygen in at nighttime and fills up the space with the fresh air.
And in the daytime, if it's moderate like springtime, the windows just stay open all day long and they don't open a lot. They only open about an inch. So you're not getting air running through at high velocity. You're just getting a trickle of breeze running through the space. And what often happens is the high level windows are normally open a lot to let the hot air out.
So we have an overheating problem more than a problem of being too cold and we've got to warm up the space. But today it would be all the windows would be closed. Now, as I mentioned before, we're trying to hold on to the heat. And then what we're going to try and do is just block some of the heat load to stop, particularly the eastern and western sun from coming into the space and overcooking the space.
The building design has less glass on the east and the west than you would normally see in most office buildings. And then our design thinking is about what you do with the light when it comes into the space. How do you reflect and bounce it and make a beautiful private atmosphere to be in without having a huge amount of glass that would lose a lot of heat in winter and gain a lot of heat in summer?
00;23;32;17 - 00;23;37;25
DP
Very interesting, very different than what we're used to here in the US for the most part.
00;23;37;28 - 00;24;32;03
WS
Yeah. So glass is sort of interesting, isn't it? Because you think of it as the way of bringing light into the space and it absolutely does that. But in another way it's a poorly insulated material compared to others. So if you think of it as a very thin sheet of plastic or cling film or something like that, then even if it's not getting sun directly on it, it's going to let the heat out or the heat in whichever one you don't want.
It's just going to allow the temperature to move towards what's on the outside, even if you don't want it to. So a principle that we have is to reduce the amount of glass in buildings. We try not to do buildings that are mostly glass, you know, in an office building to get at least 30% of the facade is solid, but we're targeting more like 50% solid.
And you have to be very thoughtful about the occupants of the building and the desire of the tenants to have a lot of glass in the spaces and how you're going to be really responsible with that as well.
00;24;32;10 - 00;24;57;21
DP
So let's go back to the building plan for a second so our listeners can imagine this. So you've got, as far as I understand it would be like a large square. The front end is a long rectangle, the series of stories and then the leftover, much larger rectangle is the workspaces. And then along that long front facing rectangle atop that is the apartment, am I correct?
00;24;57;27 - 00;24;58;16
WS
That's exactly right/
00;24;58;16 - 00;25;12;29
DP
Okay. So let's talk a little bit about the style choice now. So when you're walking in the alley in the back, you see one facade and you're walking along the main road in the front, you see a very esthetically different facade. Tell us a little bit about those.
00;25;13;02 - 00;27;58;20
WS
Yeah. So the laneway at the back, which is called Balaclava Lane, is the original facade of the building. And it's interesting when you walk through this precinct because what you see is the laneways are almost exactly as they were built in the 1950s. So you see rusty old windows, old timber, rickety doors, original brickwork that's never been painted.
And they're beautiful, they're just gorgeous to look at. And people who find them think they're incredible. And this is a little bit of an undiscovered area right in the center of Sydney. It's kind of remarkable. And then on the front street faces of the building, all of the people have gone and renovated them, I guess, every ten years and modernized them.
And so there's no good buildings left behind. They've done them cheaply, badly. They've kind of destroyed the integrity of the streetscape. So we saw an opportunity with our building was to leave the back as it was because it's so beautiful. And our work there was to make it durable, waterproof, more environmentally responsible, but not stylistically too different. And then on the front streetscape, we had an opportunity there to be quite expressive.
So we tried to do a modern version of the building opposite ours, which is the only one in our street that hasn't been renovated. And it's a classic sort of modernist style where you have very long horizontal steel frame windows, a kind of beautiful ribbons of glass in between those in a bit of a tower at the end.
And we almost mimic that design. But we did that in a way that was more nuanced to keeping that hot sun out in particular and giving the views out from the internal rooms that we wanted to see. So in the main meeting rooms, we needed to have solid walls in the spaces so we could pin up our work and control the light.
And then we have high level windows to let light into the meeting rooms and low level windows to look out to a garden that's on the street below. So when we worked from that idea of what the internal spaces needed to be, and then we married that with what the environment needed to do and then thought about the context, it led to a new building from the outside, which looks like very long strip windows.
And the positioning of those relates to the internal functions of the space. And then we tried to be creative and inventive and to take that everyday material being a brick and just to kind of push it to do things no one had done with it before in our minds. I mean, you have some amazing architects in America, like Frank Gehry, who's done incredible things with brick as well.
But we sort of thought there's an opportunity here to represent this era of technology and to be a design that came from the 2020s, for example, rather than something from the 1950s.
00;27;58;22 - 00;28;05;25
DP
So tell us a little bit more about this peeling brick facade. How did you guys make these partial vaults?
00;28;05;27 - 00;30;54;05
WS
All of the work is in sections and cross section, not in plan. So when you look at the building as a floor plan, they're all rectangular rooms on the inside. But in section we have a part of the facade that peels outwards at the top and sort of leans outwards. And we worked out a way to lay the bricks on top of each other almost at 45 degrees.
And we're able to do that with creating a small jig to lay them on. And then we laid up to three courses at once and then we'd have to leave it for overnight and then lay another three courses the next day. So it dried and then on the bottom part, we lay them over a steel frame and on that steel frame we had a curved sheet of metal, so they were laid onto that curve sheet of metal and then tied back using brick ties to that other element that that projected outwards.
So that's sort of what was done in construction. How we came up with that was to work collaboratively with our bricklayers and our engineers and just sit down at the table. And we knew who we wanted to build the project before we'd finished all the documentation. And so we were able to sit down with them at a meeting table.
And I kind of said, here's the vision, this is what we want to do, and this is how I thought you might make it. But I don't really know how to lay a brick. Can you help us with this process? And the builders we chose I experts in heritage construction and they also know a lot about engineering. So they were able to sit down with their bricklayers and myself and our structure engineer and we workshopped it together.
And in a few hours we worked out how to do that. And then they went away and did on their own. And what I've learned over the last 25 years of doing my business is that sometimes you need to monitor something very closely and sometimes you actually just have to let it go. And these bricklayers were so good and so careful.
And they loved this job so much that they just wanted to be let go. And I hardly had to do any supervision work at all in the project. It was just developed by them. And one day I remember they turned up on site and they said, William, we think we have to change your brick causing dimension, which I'd set at 51.3 millimeters.
They said, we need to change it to 51.4 millimeters. So that's the height at which each brick goes from one to an x one. And it kind of came out with this big bit of paper that looked at all the maps and showed me how that would work and how many bricks it would be. And then I just thought, if we're talking about 0.1 of a millimeter, then you guys don't let me at all, you are there, you really embrace the project.
So it was 100% a really strong collaboration project where they would come along and say, We thought we'd like to change this part. And this is our suggestion. And most of the time it just made it better. That's the best part of collaboration, I think, is when you enjoy the process and other people make the project even better.
00;30;54;07 - 00;31;12;01
DP
Yeah, for sure. I think I've asked every single guest we've had so far if they had trouble finding a mason, almost every one of them, I think every one of them so far said they did not have a difficult time. I know we've had some challenges over the years finding really talented Masons. It's a dying breed.
00;31;12;03 - 00;32;08;01
WS
This project was a wonderful opportunity for some of those bricklayers to really show their skills and to be proud of what they did, and they're really proud of it. The two bricklayers we had here related that was Gareth, who is over 70 years old, lies drick six days a week, loves doing it, and his son in law, Harvey, Harvey, married Gareth daughter and they've been laying bricks together for like 30 years or something incredible.
And they just really love this project. And I realized that as architects we actually have an opportunity to create buildings where the tradesmen can really shine. And what I believe is that if you kind of create the vision and the project, the people will come to it. You'll find the people to make it. There'll be someone who just loves the challenge of doing something that's not square and upright and the standard thing. They want to kind of do some experimental parts of the project as well.
00;32;08;04 - 00;32;17;03
DP
You said that you were thinking, Well, there's a lot of brick out here. I'd love to use brick. Were there any restrictions because it was a conservation area.
00;32;17;05 - 00;33;57;08
WS
Not explicit. I mean, the cities, it's quite merit based in its assessment, I suppose, because what they're saying is we want you to make a positive contribution to this area. I think if you went in, proposed something like an aluminum clad building, they would reject the plans, but you probably could do concrete or concrete block or maybe stone as well.
But it seems so logical in this area that it'd be made from brick. I've had quite a lot of experience in working with brick site over the years. I've started to understand how to do mortar joints really well, how to make it kind of work gymnastics so it can do more expressive forms and it felt like the right material.
And then for us it came down to the point of choosing exactly the right brick. And we have two types of brick in our building. One is called a dry press brick, and that's made about 60 kilometers from Sydney, so very local. And they're beautiful. They're white, they're in the space that I mean, now they're chalky, they chip easily, they have incredible material quality to them.
And because they're on the inside, we can afford to use these more softer bricks and look after them. Well, and then on the outside of the building, we used a very durable brick called La Paloma, which is made in Spain, actually. And we wanted to use a black brick on the outside of the building for a bunch of different reasons.
But in Australia we don't have the really good clays that make good black bricks, so we had to use the Spanish brick and I made a special profile for us. So they were able to customize it and they're just incredibly strong and durable and look beautiful with the trees and the landscaping that's in this area and marry perfectly with the building opposite that I mentioned.
00;33;57;10 - 00;34;16;12
DP
So let's get back to these unique vaults in the apartment. How did you build these? There's a series of them. I saw some photos. They looked like they were built in one location or perhaps moved or were they built at the spot they ended up in and also really unique shape, right? They're elliptical.
00;34;16;15 - 00;36;58;22
WS
Yes. They're all built in situ. And how we built them was pretty close to what we imagined at the start. So we made a catenary shaped false work curve. So like a hollow boat sitting upside down, we made a timber plywood form and then we literally put the brakes top of that form so that the mortar didn't leak out in between.
We didn't use regular mortar. We use two terracotta tile glue and we glued the bricks together so that there's no mortar joints. And if you’re laying them up down, that's a good way to do it, because you don't have that problem of the mortar leaking out in an uncontrolled way towards the inside face. We made the timber false work that was all CNC cut was put together without using nails.
We worked out that you could make this CNC machine work very hard for you and accented cutting is incredible force work because you can make it a perfect shape and it's really fast. They were all cut overnight, delivered in one day, all assembled within one week. So a very fast process. We laid the bricks across the top and then we put a thin layer of reinforcing mesh over the top of that and we sprayed it with 60 nostics of concrete.
Now, in that process, with all the bricks glued together and you have this concrete on the outside, the brick itself, in this catenary shape doesn't need any support. It will hold itself up. It is the perfect structural shape. And that shape can also be described by or represented by taking a chain and hold it at the two ends that slumps to a catenary shape in tension.
When you invert that and put that up the other way, it stays true to its shape, but it's all in compression and brick has a great material for compression. It's strong when the forces are loaded on top of it. And the person that made that famous is the Sagrada Familia Building in Barcelona uses catenary vaults everywhere. And Antonio Gaudí is the master of how those elements come together.
We laid bricks on top. We spread it with a thin layer of concrete, but we call shock crete. In Australia, it's a similar way to how you build swimming pools. They trialed that off and they left it to drive for a month and then after that we took it away. So the concrete in that system provides provide stability because you could imagine if you make this brick vault, then it's a bit vulnerable when you have kind of a strong sideways force, like a very large wind or a branch or a tree falling on it, it could all fall sideways and topple over and then take it away.
And it stands up beautifully in this place is kind of fun to do all that. We worked collaboratively with one of the local universities who helped with the CNC cutting. They wanted a project where they could talk about real life building within education programs, and they linked that into the software and how you would shape and develop it and how even patterned the bricks internally. It was all done through parametric software as well.
00;36;58;28 - 00;37;01;27
DP
So I'm curious, do the walls have to be insulated?
00;37;01;29 - 00;37;22;02
WS
So in that construction, we have brick on the inside, then we have this thin layer of concrete on the outside of that, we have a 100 millimeters thick insulation that you might only see in a courtroom. So it's rigid insulation, it's got silver socking it, it's very strong. And then outside of that, we have plywood and standing same galvanized roof sheeting.
00;37;22;08 - 00;37;23;04
DP
So you had to curve the plywood?
00;37;23;06 - 00;38;39;22
WS
Yeah, we curved the plywood and they were laid in strips that ran the length of the catenary except for in parts of it where we wanted to see this very thin edge. We use seven millimeters thick plywood and laid them in two different directions and glued them together. Gluing sounds like a horrible word, isn't it? Sounds like you're cheating in a way.
But if you think of it as adhesives, there's a lot of technology that's developed with very strong and durable adhesives now, so they can work well together and as I mentioned earlier, this space we're in now has no air conditioning in the space. It's a beautiful climate. There's a lot of thermal mass. So there's brick walls, stone floors, brick ceilings, effectively relatively small amount of windows.
So maybe 10% of the wall area is window. But it's a bright space because we carefully think about how the light comes into the space. So it is very comfortable all year round. We'll go through that week of very hot weather in the middle of summer where the temperatures soared to over 40 degrees and the humidity is up over 80%.
We go through that week of the year with a maximum temperature in the space would peak at 26 degrees. It's really comfortable. It works very well. It's a good illustration of that concept that a well insulated environment that has a lot of exposed thermal mass will be very resilient in hot weather as long as you keep it well insulated.
00;38;39;24 - 00;38;46;03
DP
It sounds like it. So how long did the process take then from design to completion for the whole project?
00;38;46;06 - 00;40;35;20
WS
The whole project was three years. So it was a year and a half to design and document and get planning consent. So while it was chugging its way through the consent authority, which is a very slow process in Sydney in particular, we were documenting the project and then it took us a year and a half to build. It was a wonderful experience.
I thought to myself at the outset of the project, here’s three years of my life and I've got to keep working at the same time to keep my business running. I really want to enjoy this and make it a special experience that I won't ever forget. So in doing that, I came to site with my dog every Saturday morning from seven and left at about two in the afternoon and spent a lot of time with the builders working through things, thinking about things, making sure we're prepared for the next week, and then did two site meetings a week on Tuesday mornings and Thursday mornings came down for a few hours each time and I got know every single person that was on the building site really well. So to that level where you knew where they lived, you knew what their family was like and developed a really strong kind of bond in the process. And many of these people have gone on to work on other projects, but we all know each other now, so friendships form in that process and I look back on it as a really wonderful time in my life where I kind of immersed myself in construction and it gave back more than I had to give it.
It taught me so much about building, about design, about opportunities with projects, about just if you have a vision, put it out there and just let the people come to it and let them do their magic. That doesn't always work perfectly for everybody because some people just don't want to do the hard stuff. They want to do the easy stuff.
But I feel like if you put it out there in the right way, then you will attract the people who want to do the really good projects.
00;40;35;22 - 00;41;04;18
DP
Yeah, it's my favorite part of the job is the people part. Actually, I love to draw, but I love going out into the field and meeting people and listening to them and asking them questions and really feeling out early on how they would solve a problem before I tell them how it's going to be solved because I'm always going to learn something.
So I completely agree with you. You had said that you loved to draw. Who did the drawing for this building? Was it you and a series of other people or and did you do the drawings in 2D and 3D?
00;41;04;20 - 00;43;25;05
WS
I led the team. For me, it was a personal project and that was my opportunity to have very strong and close leadership on every aspect of it, from the architecture to the interior design. In that interior design sort of realm, we custom designed about 13 new products for the project, from chairs to stools to grab rails to door handles to lighting fixtures.
For us, the product design stuff takes a lot of time, but it's very rewarding and we couldn't develop new product for it. But we went down to custom designing a whole lot of special things. We did the architecture and the interiors, and I led the design team. At its peak it was about five or six people working on the project during the documentation phase where in construction we had a full time architect plus myself and I was working actually about 40 hours a week on the project to kind of do all this, meetings and make sure everything was done properly. So I was probably not just a project architect, but a little bit of a developer, manager and managing the consultant to the council and other people in that process as well. And we drew it all in 2D software called Micro Station, and that was one of the last projects we did with that software.
We now use Revit for most of our documentation and we also used a little bit of software called Rhino, and we did a little bit of scripting for laying out pick patterns with that software, able to very quickly change the shape of the catenary and check the light coming into the space and very quickly change all that brick patterning, which is quite unique, sort of the bricks aren't light in a normal brick bound configuration.
They're laid where the offset is very close to the end of the brick. You get this beautiful rifling pattern of the vertical brick joints through the room. And so we used a bit of software for that, and then we made five cardboard models for the space. There was the early version which didn't have a catenary vault. It had a barrel vault in its roof.
And we made two other models of the apartment space and a few test models for the facade of the. So I've come to realize that the CGIs will kind of give you a perspective view on the space. A cardboard model will give you a three dimensional, very fast feeling of what the volumes are like. You see the light coming in.
It's a very different experience and we find that preparing a cardboard model with a CGI is the perfect way to describe a project to our clients. They love them.
00;43;25;12 - 00;43;38;10
DP
Before we move on to one or two other questions, I wanted to go back to sustainability for a second. We talked a little bit about the lack of HVAC system there. Tell us a little bit about the water savings system.
00;43;38;12 - 00;46;18;07
WS
So in an old warehouse building, we have a large proportion of roof to the floorplan. So the building here is just over a thousand square meters in its footprint on the land and more than 80% of that is a sawtooth roof which has tall windows facing south. That's our kind of not sunny side and then the inclined roofs facing pitching towards the north which is our sunny side in the southern hemisphere.
From that we collect all the water and push it into large rainwater tanks and then that's filtered and used for flushing toilets and for irrigating the property. So we have some irrigation pipes in the ground that drip feed the plants in the area in summer, able to harvest all the water and use that to be honest, we could have put much bigger tanks in because it collects so much water in heavy downpours, a subtropical area, you would kind of go through a month where there isn't any rain or two and then quite often have a big downpour where sometimes it will rain for a week without stopping.
So having bigger tanks is the next stage of the project. Actually, we're going to do the next stage, which is another building a few years on from now, and that building will have really big rainwater tanks in there because we can save it up even more for the future. That roof also allowed us to install 260 solar panels, which is about a 95 kilowatt solar farm system, and that generates in its own right more than twice the power that we need in our office.
And so we've set up a little network where we export the power to one of our neighbors and we sell them the power at the rate that they would buy it from the normal supplier. We just have a meter on it and we use that money to start to pay down some of the investment on this very large solar array system.
We also have a backup battery. So every day we fill up the battery and draw down that in the evening and some of that battery is reserved for backup power. If we were to have a power failure, it will help to run our server to shut down slowly and or things like that. We have a stage two for the project and a few years on from now we're going to build an even larger building on a neighboring site, which we also own, and that building will even be more sustained.
We're going to push this even harder. We've just launched our plans to the city to see if we can get approval for it, and it's being favorably received at the moment. But we believe there's a market in Sydney for spaces without air conditioning, with a lot of natural light, with natural ventilation and kind of a unique character that's not your average copper tiled ceiling tiled, sealed office building. I don't think people want that anymore, but we'll find out in the future.
00;46;18;09 - 00;46;33;14
DP
It sounds profoundly unique and profoundly valuable. I mean, that is incredible. So because you're not spending all this money on energy, you're generating enough power to run not only your building, but you're selling it the energy as well. That’s amazing.
00;46;33;17 - 00;47;54;14
WS
Our sort of energy system is quite advanced in allowing many different roofs of buildings in cities to have solar panels and then to blend that power with the power system of the city. So a lot of people have their own solar array systems. And if there's an excess, so a day like today, it's beautiful and sunny in Sydney and right now we would be making more power than we're using without doubt.
And what would be happening is the surplus power would be used to fill up the batteries and once they're filled up, that goes back into the grid for the city and the blend of power is distributed to other buildings in the area. We thought rather than doing that, we could firstly push it to our neighbors and then any top up power comes from the grid and any surplus power goes back into the great.
So it's the network set up to have these blended power sources and that makes a lot of sense because you really are producing the energy at the same place that you're using it. And a roof, for example, isn't a redundant asset in our mind. A roof should be used for, in addition to its performance to keep water out, it should be used to collect energy or to make green spaces for people and other animals like birds and bees to live in, in those spaces as well.
So we see that as an incredibly valuable asset to every building project.
00;47;54;21 - 00;48;07;14
DP
Very forward thinking, really interesting. So one of the last questions got for you, give me one or two things that you guys learned during the design, drawing and construction process on this job. What was new to you?
00;48;07;16 - 00;50;43;16
WS
One thing that I had thought about for a long time that this project absolutely cemented in my mind was this idea of bringing people to the table. So I spoke earlier about having our bricklayers and our engineers and the builder and myself come to the table and just say, Here's the vision of the project. I don't know how to lay bricks, but this is what I thought they might be like.
And they would say, Yes, it works like this, you don't know that. That was really successful. And we did that almost in every single building element. So we would do the same process for the windows, for laying the floor tiles, for laying the roof shading. I kind of lay out here, here all the drawings. This is what I thought about.
This is what we're working towards. Do you think this is the right way of working? And in that process, I got a lot of respect from particularly the tradesmen doing the work because that really happens within they often get told what to do and they don't get asked what their ideas are. And I also realized that it gave them an opportunity to be engaged with the project mentally.
So they felt invested. And for that the reward that we had was we got a higher standard of construction than you would normally see. We got people bringing their ideas to the project and we got friendly, smiling faces on a building site. So it kind of had this great energy about it. So that was kind of good. I've been trying to roll that idea out in our practice where we call them briefing meetings.
We sit down with a contractor before they start preparing their detailed drawings of how to build what they're going to make. And we tell them about the vision. And people are very, very receptive to that. So that's kind of one thing that I learned in the process. I suppose it ignited this idea that I have now that a part of our role is that we could create opportunities for people to shine like tradesmen, to really show their ways and rather than bricklayers as being borderline ordinary bricks in unremarkable buildings, you could do special things.
And the other one I've touched on as well as just I think if you have a vision, then you probably just can just go after that, go looking for the people to collaborate with you and find them and bring them all together so that it's been kind of really invaluable. And I feel like in that process and in collaborating, this always works this way, you need to get to say this is what we're going to try to get out of the project. And in other times you've got to be loose about it and let the collaboration evolve. The design I hate that is not what I want, but you've actually got to back off a little bit from that and listen to them and hear what they're trying to say, because that's what collaboration is.
It's two minds coming together to make something better than what one person could do on their own.
00;50;43;19 - 00;51;37;06
DP
Yeah, I always find when I ask somebody to give me their opinion or to tell me what they think the solution to a particular challenge is even if the idea they give me isn't something that I'd prefer. I always go back and think about it. And sometimes there are parts of that idea that I end up really falling in love with or liking a lot more than I did or incorporating somewhere else.
So I think as architects, we forget. We don't move beyond design all the time. We forget that this is a people business as much as it is about design and it's about money. So, you know, when we get out there in the field, we're working with human beings and to involve them in our jobs and make them invested in the thing that they're making, it ultimately makes a much better product.
So I think that's all very insightful.
00;51;37;06 - 00;51;40;25
WS
The process is way more enjoyable if you do that as well.
00;51;40;28 - 00;51;43;00
DP
Absolutely. My goodness.
00;51;43;03 - 00;52;28;13
WS
The part that comes to mind really for the project is longevity is something I really believe in and we've spoken a bit about sustainability in terms of energy consumption or collecting water, but another layer of sustainability is if you design things to last a long time, then you can make really big gains in projects. So we won quite a few sustainability awards, principally based on this idea of making way more energy than we use and not having air conditioning, which is a real hurdle to sell over in our environment.
The other thing I think is just if you make buildings last for 50, 100 years, then you know, all the embodied energy that goes into making them is really amortized over a long lifespan and becomes much less significant.
00;52;28;15 - 00;52;51;03
DP
Yeah, in college we hear a lot about timeless architecture, right? That's our goal is to make architecture timeless and it's so incredibly challenging to do just that. So I commend you guys on the building out there. It's really wonderful. So after all these years of being an architect or running a firm, if you could give your younger self some career advice, what would you say? What have you learned?
00;52;51;06 - 00;54;23;16
WS
What I think in architecture is that it's a very broad spectrum of opportunities. You could be really good at detailing or you could be really good at design, or you could be really great with clients and consultants and approval, in a way you’re so good with words. What I feel like is that there aren't many people who can do all of those things extremely well.
People tend to have an area that they're good at for people to excel. I feel like you kind of got to go with what you're naturally good and develop and grow that skill and become amazing at that. That's probably what there is to do now that can be architectural detailing, or it could be a type of building that you're interested, or it could be a place you get excited.
Like I get excited about incredible internal spaces. That's my favorite thing to design and that's sort of what I try to build is opportunities with our projects. How do we build these amazing interiors? For me, the outside is secondary to that. I always do the insides first and then come to the outside afterwards. That's my favorite thing. And then I kind of work on the things that I'm not very good at.
I find conceptual design really hard. It exhausts me. I put a lot of time into it. I set my standards very high, so I do it again and again and again. So I get it right. But once I've got the foundation right, it feels like a lot of our projects, everything falls into place. So the second part's much easier.
Okay. I guess in my advice, you don't leave the parts you're not so good alone, but you probably have to recognize where your strengths are and also play to those as well.
00;54;23;18 - 00;54;38;12
DP
Yeah, I always heard in business pick one thing and do it really well and ultimately you'll be successful. So that's a part of it for sure. So, William, it's been great to have you here. Thank you very much for your time. Where can people go to learn more about this Smart Design studio?
00;54;38;18 - 00;55;04;16
WS
Now Website SmartDesignStudio.com has a lot of information about the projects we've completed and our team. And then also just on Instagram, we kind of put a lot of work in to updating people on what's happening, what's currently happening. So that's @Smart.Design.Studio. There's a lot of updates on that side about who we are and how we're working on all the very current information. It's been a great pleasure to be on the podcast again. Thank you for inviting me.
00;55;04;18 - 00;55;24;12
DP
It was great to have you here, William, I learned an awful lot. The building's beautiful and the architecture your firm does is really quite wonderful. So check out the website.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!
Design Vault Ep. 11 Surf Avenue with Jay Valgora
ABOUT THE ARCHITECT:
|
Inspired by the industrial architecture in his hometown of Buffalo, from the grain elevators to the steel mills where his father worked, Mr. Valgora pursued his passion for architecture. Receiving degrees from Cornell University, Harvard University GSD, and a Fulbright Fellow to the United Kingdom, he gained valuable experience in firms from Boston to London. Finally arriving in New York City, he honed his experience at classic firms before founding STUDIO V Architecture, a practice dedicated to the reinvention of the city. Mr. Valgora’s work is defined by an extraordinary range of projects and scales, encompassing new construction, adaptive re-use, renovation, and interiors. His designs have been internationally recognized for engaging history, culture and context with innovative contemporary design: creating inspirational public spaces, encouraging diversity, restoring historic artifacts, and bringing new life to the edges and interstices of our city while reconnecting communities. |
|---|
Surf Avenue
Studio V
View ProjectTRANSCRIPT
00;00;00;02 - 00;00;05;12
Doug Patt (DP)
Let's go inside the vault. The design vault.
00;00;05;14 - 00;00;33;10
Jay Valgora (JV)
So, it's very complex. It's two residential towers and it's mixed use. It has retail at the base with a series of astonishing amenities and public spaces that link them together, including a fantastic pool deck overlooking the ocean, overlooking the roller coaster, and a whole series of public spaces. Because, you know, there's a social life to a building, too.
00;00;33;17 - 00;02;02;09
DP
This is my guest, Jay Valgora. I'll share more about him shortly. In this episode of The Design Vault, we highlight Jay's project 1515 Surf Avenue. It is a two tower, 26 and 16 story residential building complex in Coney Island, Brooklyn, designed by Studio V Architecture. This street corner project will span 470,000 square feet and yield 461 units 139 designated for affordable housing and 11,000 square feet of ground floor retail.
The building facade is variegated white to cream colored brick, with the main building podium facing Surf Avenue, featuring a soaring ground floor elevation with several diagonal columns, its sloped roofline is further defined by a stepped series of wooden platforms the design team calls the vertical boardwalk. The building features curved glass lined balconies and amenity deck heated pool and green roof.
Residents have panoramic views of Coney Island Amusement Park and the Atlantic Ocean. The total outdoor space will span over 20,000 square feet. The building includes a fitness center, lounges, co-working spaces, indoor basketball court, handball court and accessory off street parking. When completed in 2024, the property will be the largest geothermal heated and cooled building in New York City.
00;02;02;12 - 00;03;17;08
DP
Hi, I'm Doug Pat and this is Design Vault. Jay Valgora is the founder and principal of the architectural design firm Studio V Architecture in New York City. Jay grew up in Buffalo. He tells the story that it was the steel mills where his father worked and the historic grain elevators of Buffalo that influenced him to become an architect.
Jay received his Bachelor of Architecture at Cornell University and his master's degree at the Harvard Graduate School of Design. He was also a fellow in the Fulbright program to the United Kingdom. At Harvard, Jay studied under Pritzker Prize winning Portuguese architect Alvaro Cesar. Mr. Valdora is on the forefront of urban design with nine projects on the New York City waterfront.
He works closely with entrepreneurs to create innovative designs and programs, collaborates with government agencies to address policy infrastructure, environmental issues and approvals, and is deeply engaged with communities through innovative public space design. Welcome, Jay. Nice to have you with us today. So tell us a little bit about Studio V architecture in New York City. Where are you guys located? What's the size of your firm and what type of work do you do?
00;03;17;11 - 00;04;07;23
JV
So Studio V is right in the heart of Manhattan. You know, we're right in the middle of the island. I like to say that we live in a city of four islands and a peninsula, and we're right in the middle on 32nd Street and Park Avenue. Actually, by the time you broadcast this or soon thereafter, we've even purchased a small building, which we're currently redesigning right now, and we'll be moving to 111 East 29th Street, where we've created our own studio, which is currently under construction.
I guess the only other thing I can tell you is that Studio V is really all about the people. We have a really incredible range of people that work with us. We're about two dozen, and so we really see ourselves as a boutique architecture firm, but we handle tremendously large and complex projects because we have a really wonderful team and very diverse clients and very diverse projects. So we really pride ourselves on doing things that are a little bit different.
00;04;07;26 - 00;04;13;20
DP
So tell us a little bit about the firm. When did you get started and what's your role in the office now?
00;04;13;27 - 00;04;57;04
JV
So I began the firm and founded it in 2006. So I guess we've been around about nearly eight years and I'm the principal and the founder of the firm, but I have seven senior staff. They collaborate with me on all the projects. It's really an open atelier. I intentionally always call it a studio. It's not really an office, it's not really a firm.
It has the whole atmosphere and character of a studio. We have no offices, we have entirely open spaces. We have huge collaborative areas. So my role really is to work with and inspire the great designers and talented architects with whom I work and to provide leadership. But really they play an essential role. It's not Valgora architects, it's Studio V, and the studio really comes first.
00;04;57;08 - 00;05;10;16
DP
It's really interestingly described. I haven't heard somebody talk about their office like that. So tell me a little bit about how you get your people to pull mostly from New York City? And do people hear about your office and they want to work for you?
00;05;10;20 - 00;05;59;16
JV
We have a really diverse range of people, but there's sort of a running joke in Studio V that isn't really intentional, but somehow it proves to be true. I would say that many of the people at Studio V come from two places. It's really not intentional. It's not a policy. But many come from the heartland of America. I myself grew up in Buffalo and I consider that really secretly to be part of Ohio, not New York state.
It's completely part of a midwestern kind of ethos. And many of our talented architects come from around the American heartland in the Midwest, but the other half come from all over the world, throughout Europe, Asia, South America. And so I'm very proud of the fact that we really are part of New York City and kind of represent the diverse talents that come from New York City. And yet I think we're also grounded in certain optimistic ideals that come from my upbringing.
00;05;59;18 - 00;06;08;03
DP
Well, it's really great to hear. So let's dig in here and talk about your buildings. So tell us a little bit about 1515 Surf Avenue. So how did your office get the project?
00;06;08;05 - 00;06;58;14
JV
Well, first, we really can't do great projects without having a great client. And LCOR is our client on this. And they approached us with the building and it was really a breakthrough building for us. So Anthony Tortora, who is the partner at LCOR, knew me from another firm at which he had worked before, and he decided he wanted to give us a try.
But they did a competition and they put us against some really other serious architects, and we were really proud of the fact that we were able to prevail in that. I think it's all about the power of our ideas. It's about the design concepts that we bring, but also about solving our client's problems. And I think Studio V is really about those two things.
It's about maintaining ideals and an optimism about what a great design could be, and at the same time solving our client's real problems about bringing a project in on budget and doing something creative that they can actually build and that meets their needs.
00;06;58;17 - 00;07;01;28
DP
So how many people were involved in the competition to get the job?
00;07;02;04 - 00;07;45;09
JV
There were a handful of us. I put a couple of my best designers on it. It was a paid competition, albeit a small amount. Yes. And so we were up against these other serious firms. And really, I'm sure we spent three times the amount, but I was determined to do something special for it. And also I was inspired by Coney Island.
The principal, the partner, Anthony, actually grew up near there and he really was committed to the idea of remaking this neighborhood and that also fit studio visit. Those were really interested in transforming communities, rebuilding communities. And Coney Island has an incredible history and past and yet has suffered terribly under urban renewal and other elements. And so now we see this as one of the signature projects that's helping reestablish this really important and historic neighborhood.
00;07;45;17 - 00;07;51;07
DP
So that's a great place to start. So tell us a little bit about the history of the location where this building is.
00;07;51;14 - 00;08;49;12
JV
So this is right at the corner of Surf Avenue there, these great street names in Coney Island. You know, it's between Surf and Mermaid Avenue, and it's between 15th and 16th Streets. As a matter of fact, it's right across the street from a roller coaster and sits right on the beach with stunning views of the iconic Coney Island Beach and boardwalk.
So to me, I don't know if I'll ever get to work on a site again that is next to a roller coaster overlooking the Atlantic Ocean with stunning views of the historic parachute drop. It looks diagonally right down at Nathan's Hot Dogs. And it's catty corner to the iconic cyclone. So really, it's a fantastic site. Historically, all of these elements that I just described were part of it.
And historically it was part of the whole Coney Island landscape. But by the time we got there, it was a parking lot. There was nothing there. And so really it's an opportunity on this major avenue that had so much historic importance in Coney Island to really help rebuild one of the essential centers of this community.
00;08;49;19 - 00;08;55;18
DP
Yeah, you must have been amazed when you got out there and stood on that property and looked out, thought, wow, this is going to be really cool.
00;08;55;25 - 00;09;17;26
JV
Even now that construction is going along very well and it's fully tapped out and they're adding all the facade elements as we climb up through the building. It's stunning the relationship it has to the Manhattan skyline, to the ocean, to these iconic architectural rides and amusements and buildings. It really sits in the landscape and kind of draws these elements into it in a way like no other site I've ever had.
00;09;17;28 - 00;09;21;24
DP
So what was the scope of the project? What were the client's programmatic requirements?
00;09;21;27 - 00;10;02;00
JV
So it's very complex. It's two residential towers and it's mixed use. It has retail at the base and one of the towers is market rate and the other is affordable. And yet they wanted us to treat them both with the highest degree of quality, with a series of kind of astonishing amenities and public spaces that link them together, including a fantastic pool deck overlooking the ocean, overlooking the roller coaster, and a whole series of public spaces.
Public spaces, meaning spaces for the residents to share because, you know, there's a social life to a building, too. And I think this is one of the key elements of the building that we were inspired by the social life of residential buildings in New York and how we could create spaces that would bring people together.
00;10;02;07 - 00;10;14;15
DP
So let's talk a little bit about the building design. So we already discussed the site. There weren't any unique topographic features raised, just a giant flat parking lot. Was it a parking deck or was it just a giant lot?
00;10;14;21 - 00;11;14;17
JV
It was an open parking lot, and I guess the geographic features would just be these iconic buildings and structures that surrounded it and the ocean itself. The ocean is one of the key elements that did really influence the project, though, because there's a topography to the project, even though the site was flat that responds to the ocean. And that, of course, is resiliency.
You'd mentioned earlier, Doug, that we do a lot of waterfront projects. And one of the things for me is that this sits in the middle of a vast floodplain and we're creating 461 new residences, and we're really at the forefront of dealing with resiliency and climate change. We're very proud of the work we do there, including pro-bono work.
So one of the things we had to do is elevate the entire building and yet still really engage the streetscape. So as a matter of fact, this led to the main design concept, the vertical boardwalk, the idea of elevating the building with a series of step platforms that protects it, and major storm events such as Sandy, and yet also creates a series of spiraling public spaces that work their way up through the building and create these stunning views of the surrounding landscape.
00;11;14;24 - 00;11;23;13
DP
So that's a good way to segue. Tell us a little bit about the project restrictions, the zoning codes, how far off the ground to the building have to be raised?
00;11;23;16 - 00;12;56;02
JV
Sure. So of course, like most buildings in New York City, it's an as of right building. So we worked within the existing zoning ordinance. And so in a sense, some of the massing of the towers was pre-established city planning had done a rezoning of this community a few years before, and that actually led to this development and has helped catalyze the transformation of Coney Island.
But then within that, there are certain requirements from FEMA and from flood requirements. But I'll tell you also that the client was very supportive of this. We exceeded those requirements. We didn't just meet the code, we added additional feet of elevation. We did three feet of free board. On top of that, we really pride ourselves on exceeding the code requirements.
As a matter of fact, after we finished the initial permitting of the building, the city amended the code partly in response to advocating that we had done in order to allow buildings to increase their height, to allow extra elevation for climate change and have that not count against the development because it's a positive thing to lift the building up.
The other thing we did that was also important though, is not just lifting it up, it's still engaging the street. So for example, at the corner of 15th Street and Surf Avenue, we created this great porch as the client had this idea that we really need to bring back the streetscape, the retail streetscape, and that would be a fantastic site for a restaurant.
So we created this wonderful porch that has multiple levels that actually allows it to engage the street instead of being too far elevated seven or eight feet up. That's only three feet up. And we allow that to flood in a storm event. But it doesn't go into the building. And that way we can have these series of stepped platforms and public spaces that activate the streetscape and bring Surf Avenue back to life.
00;12;56;05 - 00;13;01;23
DP
So how do you do that? How do you make these objects that can flood and yet they're still functional?
00;13;01;29 - 00;13;53;26
JV
So we really worked with a great team of people, the overall residential levels and all the habitable levels are well above the floodplain. So they're really up to about elevation 13, which is three feet of freeboard above. These are NAVD 88, which is the datum that's used in New York City. And then for the lower areas, really the lobby is accessible.
So we're using flood barriers there to protect one tiny small area, which is a grade which allows the full lobby to be accessible. But all the areas are elevated and then the retail spaces are also elevated. But we stepped it down with this outdoor porch, and that's designed very specifically so that the floodwaters can come in, but they won't enter the building.
They just enter this kind of lower porch level that really engages the street. There's also a parking garage and that does go a bit below grade, and that is allowed to flood. But it has special vents and special technical requirements for the materials that allow it to be flooded and to drain out. And that's the right way to do it.
00;13;53;29 - 00;13;57;10
DP
So tell us about the building plans. We've got two buildings out there.
00;13;57;13 - 00;15;41;24
JV
So the building plans were really interesting. And this is one of the things we did in the competition. It's a little hard to describe, but there are the kind of inside corners of buildings where it's difficult to put residences, the kind of the reentrant in corners when you have large, complex residential buildings, it's difficult because you can't put windows there.
And so we came up with a really, I think, creative scheme, and that's actually what helped us win the competition. What we did is we took the left over the dead spaces where you could put windows and we created double height amenity spaces, public spaces for the residents, and we created the coolest, craziest collection of these spaces. There's a media library with a basketball court overlooking it and an elaborate kitchen and a pool deck and a gym.
All these different elements weave together and overlook one another. So we took the kind of hidden corners and places that you normally can't use in the development. And we created instead vast, soaring two story spaces overlooking one another, creating this almost voyeuristic experience where one space in one activity overlooks another. We find today, too, in a post-COVID environment or whatever environment we're in now, that more people are living and working in more creative ways, sometimes they're working from home, sometimes they're going to work.
And we think the idea of having this fantastic residence right on the Coney Island beach, but then you can work within the building. We created many different spaces for people to interact socially, for co-working, for living, for entertaining. And so these staggered multilevel spaces work their way all the way up through the plan. And it's even kind of telegraphed under the facade with this series of folded plans that you referred to earlier that really bring you all the way up to the rooftop and to the pool deck. And so this was really the big move on the plan. And the client was so excited about that that they awarded us the project.
00;15;41;27 - 00;15;45;04
DP
So how long was the design process then?
00;15;45;04 - 00;16;36;15
JV
Overall to do a building of this complexity, the complete design probably takes about a year. One reason why I think this was also a great client is we really collaborated from the beginning. We didn't just do a design and then hope it would work out. We worked with them at every step with their marketing people, their technical people, their construction people.
We did budgeting throughout, which is really important to me. As a matter of fact, it's critical that if we're going to do a creative design, we have to work with the client in order to figure out how we're going to hit their budget exactly, which I'm very proud of with this project. For example, we have a whole series of highly sculptural elements that are made of GFRC, glass fiber reinforced concrete, and they really wrap around the brick elements, which we'll talk about a little bit later and kind of create these wonderful transitions.
These are very complex forms, and we really had to work closely from the beginning to make sure we could meet budgets. Same thing on the brick. We're using some really unusual and more expensive and more fine forms of brick and custom brick that we'll talk about. And we had to make sure that we could really work within budgets and yet maximize the impact and create something that would be really special that hadn't really been done in this neighborhood before.
00;16;51;25 - 00;17;02;12
DP
So that's a good segway to style choice and the style that your office works within and the style that you chose for this building. Can you tell us a little bit about that?
00;17;02;18 - 00;17;58;10
JV
Well, I believe I'm an unrepentant modernist. I believe that we live in an astonishing time in the 21st century when we're redefining so many things technologically, socially. So I believe very much in creating works that are of our time and that are contemporary. But I love to combine that with traditional understandings of urbanism, of the way people live within cities and materials.
So, for example, a project like this really combines both of those where we're really using first we're creating very unusual forms, complex shapes. We're working with special computer technology in order to model these. We're working with computer numerically controlled bills and robots to actually build components of the building. And on the other hand, we're working with Brick, which is one of the most ancient materials that we have, one of the most enduring and beautiful materials.
And I love the idea that we're combining these different elements together to create something that is both timeless and of our time.
00;17;58;12 - 00;18;06;26
DP
So you said design was about a year long after that. What about city review? And then ultimately it's still under construction right?
00;18;06;28 - 00;18;59;24
JV
So I would say the total design process to complete all the technical documents and we did this project in Revit, we did it to the highest technical standards and construction documents, which is really helpful to figure out the different components takes about a year overall for the full design, but really at the same time as we're doing that, we're working on the permitting.
And so the permitting was really ready to go right at the conclusion of that. And because the project was as of right as we were developing the final technical documents, we were already going through the process of doing permits and then obtaining the foundation permit and then moving directly into constructions that really allowed us to facilitate the schedule and go quickly.
I would say one of the challenges on the design, which is really one of its greatest features, is the geothermal, because that required a lot of planning up ahead and doing a geothermal project of this scale in New York was very difficult in the construction because it required coordinating all of the geothermal wells with the foundation elements and doing that right from the beginning.
00;18;59;27 - 00;19;02;25
DP
So whose idea was it to do geothermal?
00;19;02;28 - 00;20;13;23
JV
I have to give the client credit again, like we really do a lot of projects that address sustainability, and I was very excited to do the largest geothermal project in New York, but it really required the commitment of the client and they had a great partner in Eco Save who was the engineering and geothermal firm that actually helped develop the geothermal systems and also work out the financial models that would allow it to work.
So this was really a terrific thing, but the client gets the credit and that's really also due to the changing codes in New York City, which are so stringent that the client felt it was worth the investment in new sustainable technologies. Well, actually, geothermal is a very old technology, but applying it in new ways, in ways that aren't typically done.
One of the things I'm most proud of is the second largest geothermal project in New York today, after this one's finished, is called St Patrick's Cathedral. So really doing geothermal on this scale for a residential rental building is the bread and butter of New York City, that kind of makes up the fabric of neighborhoods for me as groundbreaking. And also one of the buildings is an affordable building.
So the fact that we could do that level of sustainable design and help combat some of the future issues we're dealing with energy and climate change with this kind of building, I think is the extraordinary thing.
00;20;13;25 - 00;20;33;07
DP
So you said that you brought in the contractor early, so as a high end residential architect, we typically bring a contractor in right after schematic design to take a look at the project and help us determine whether or not we're going to be even close in terms of price, did that help you guys working with the contractor early on?
00;20;33;14 - 00;21;24;10
JV
Absolutely. And again, L Corps had a partnership with LRC Construction, So they're the construction manager doing the job. And really we worked with them on a pre-construction basis closely with the client. You know, often it's described as sort of a three legged stool with architects, you know, the architect, the owner and the contractor and really if one leg of the stool doesn't hold up, you know, it falls down.
And so really all three of us worked together intensely from the beginning. And this was critical, for example, with some of the brick elements, because we wanted to work with this beautiful format called Roman Maximus, very unusual format. We really found that very compelling. It was something we wanted to do from the beginning of the job and we had to work out how would we meet budgets, what would the cost of that be, how would we integrate that with the other elements, how much of it would we use? And so we really worked out those elements of the pricing very early in the schematic phases of the design. Instead of waiting till the end.
00;21;24;13 - 00;21;28;01
DP
Did you ever think about using another material rather than rrick?
00;21;28;03 - 00;21;56;05
JV
You know, we looked at different things for the building and we looked at GFRC at first for the whole building. But I love the idea of brick because I think it's such a classic material and in the end we ended up doing a hybrid where the brick is the majority material for the building, which I think works very well.
And the GFRC elements, these kind of sculptural concrete pieces are sort of the transitional pieces around the front entries and around the main amenity spaces and public spaces of the building. So I think it's very balanced by having both of them, although brick is the main material.
00;21;56;07 - 00;21;58;20
DP
So how did you end up dealing with Glen Gary.
00;21;58;22 - 00;23;19;27
JV
So Glen Gary really was very special for the project because they had this really unique product we've been looking for actually for years before I'd even heard of Glen Gary, I loved Roman Brick for my own studies. Even as a student at Cornell and at Harvard, I would travel extensively around the world. I would travel through Europe, and I loved the old Roman brick, which of course is a longer thinner brick.
And I saw in contemporary brick manufacturing they were starting to return to that. As a matter of fact, for years I tried to use it and so few manufacturers would really work with it. Then we found Glen Gary was doing something even more special. It was a longer thinner brick, what they call Roman Maximus, if you will. It's even more elongated and there's something special about that proportion.
It doesn't just stack up in the way that regular bricks do, which is fine too, but it almost creates a beautiful surface. And then we also did the detailing which was very important, where we created deep reveals along the horizontal edges of the brick. It's an old trick that Frank Lloyd Wright used to use. And so by creating a raked joint at the horizontals, it kind of creates this beautiful texture, almost like corduroy, and that along with the long, thin proportions of the brick, gives it a kind of a beautiful surface quality that's much more monolithic and much more beautiful.
And so we use this material all around the base of the building in order to really accentuate that and create a very strong presence to the street.
00;23;20;00 - 00;23;22;05
DP
So you had a good mason from the get go.
00;23;22;11 - 00;23;33;08
JV
We had to work very closely with our Mason and work out all of the details. Let's just say that there were a lot of mockups and a lot of reviews in order to make sure that we would maintain the quality of the project.
00;23;33;10 - 00;23;40;07
DP
So did you do drawings in house? First of combinations of brick or colors or you worked most of that out in the field?
00;23;40;09 - 00;24;06;17
JV
We actually worked extensively on all of that, so we had to work out special brick shapes. We did do curved bricks because they're a series of curves throughout the project, which were critical and we had to do specials for that. We work closely with the technicians at Glen-Gery as well as with the masons in order to work out how to do the specials.
We also had a great facade consultant, Frank Seta & Associates who were really integral to helping us work out the different components of the brick, the attachment, the waterproofing. They're really terrific.
00;24;06;24 - 00;24;16;10
DP
Interesting. We had talked a little bit about geothermal and sustainability. Was that a larger issue for some of the wall systems, insulation, etc.?
00;24;16;14 - 00;24;30;23
JV
Absolutely. I mean, the building has a very, very robust energy envelope and again, as I say, helped us with that as well as we did full energy modeling with IMG Engineering of the building in order to make sure that it met and exceeded really all the sustainability standards. Absolutely.
00;24;30;26 - 00;24;34;23
DP
So you talked a little bit about Revit. How long has your office been on Revit?
00;24;34;25 - 00;25;44;26
JV
That is a great question, Doug. So really, I guess we probably did our first Revit project ten years ago, and it was pretty early for us. We've always embraced new forms of technology and always embraced tools that help us be better designers. But I would say in the last several years, we've really moved towards using Revit on all of our larger projects.
We don't use it on every project yet, but more and more, even in our own office building, even on our own studio building that we're building out now for ourselves, we're doing the project and Revit, so we're moving towards using it now on smaller projects as well as definitely on all of our larger ones. I have to tell you what I like about it, in addition to the technical aspects, the way it helps you with construction takeoffs, integrating different components in real time of the architectural drawings, having them refer to each other, updating drawings. But I love it as a design tool. And in this project where we had this whole series of really interesting, complex spaces, Revit was terrific for actually allowing us to really make cuts through the building and understand the relationship of all the different components, relationship of inside to outside, relationship of one space to another, relationship of one material and how it meets another. Revit was fantastic as a design tool and really helped us do this building in particular.
00;25;45;04 - 00;25;57;23
DP
Yeah, I would imagine clients. Well, I already know this. I mean, clients love looking at three dimensional renderings. They come in and or you send them drawings by email and they're blown away right? I mean, it's like the building's already done.
00;25;57;25 - 00;26;53;19
JV
Renderings are a big part of what we do. And it's interesting here we were talking a little bit earlier because to me, one of the things I'm impressed by is we work really hard to make the renderings reflect the final design, but it's almost impossible to convey ideas of color and lighting and in renderings. People often think they represent reality, but you can manipulate it.
One of the things we did in the renderings for this project was we really tried to convey the color and character of the brick, where you could really sense the warmth of it when the light hit it and how it changes color and becomes a little bit more neutral and shadow. And it creates a real modeling for the building in sunlight, which I think is really critical.
And something I'm proud of with the renderings that we did is I'm amazed as the brick goes on now, I can see that it really reflects exactly how the brick is operating and how it takes on different colors and textures in changing patterns of light. It's especially important on a site like this, which is open and facing south directly overlooking the ocean. So it really gets tremendous light.
00;26;53;21 - 00;26;58;00
DP
Did you guys end up with any masonry on the interior? Any brick on the interior?
00;26;58;02 - 00;27;51;25
JV
So I love the idea of bringing inside and outside together. And so there are a few key places where we brought the brick into the interior. Actually, in the lobby we're doing something very special where I brought the brick right into the inside and actually made it a major feature right behind the front desk, kind of the entry point and I even pushed and pulled that great Roman Maximus brick to give it fantastic texture.
And we lit it beautifully. We're working with Susanne Tillotson, a remarkable lighting designer who's going to light up the texture of that. We're going to put artwork there too, and we brought brick into a few other places in the interior. Also, it's at the rooftop space that we call the Skydeck, where it folds in and becomes the base for some of the seating.
There's an area that we call the living room with the kitchen that overlooks a giant garden over the parking garage. And we pulled the brick in there too. It's in a few places in the entry sequence, going up to the gardens from the lobby. So I like the idea of referring to the brick. It's mostly on the outside, but there's a couple of key places where it makes its appearance on the interior.
00;27;52;02 - 00;28;10;29
DP
Might be a dumb question. You do a lot of projects along the water. Of course it affects the materials and the choices you make, but is it a large consideration for you in most of the buildings that you do? I see a lot of wood on the interior at the front entryway here. What are you guys doing? Are you treating those materials differently?
00;28;11;01 - 00;28;42;01
JV
Absolutely. So it's very important when doing projects on the water that we have to address that it really probably affects other things more. It certainly affects our window specifications. It affects the coatings used on the windows, which have to be to a higher standard. Again, this is where FSA was a great help to us. Brick is a great material for the waterfront because it's really a rain screen.
Brick doesn't really stop the water. The water barriers are behind the brick, but the brick itself is so durable that it does really well in, you know, difficult environments such as Coney Island where we really have a maritime environment and a lot of salt in the air.
00;28;42;03 - 00;28;44;22
DP
So how big was the team that worked on the job?
00;28;44;24 - 00;28;51;07
JV
Gosh, it's hard to say because there were so many different people. I would say, you know, a dozen people. And then, of course, there's a really wonderful team of consultants that we worked with. So a very large number, probably 12 or 15 consultants who really played a key role. And then the client too. It was really a tremendous team and a really great group effort.
00;29;06;26 - 00;29;16;01
DP
So did your office or you in specific learn anything unusual or interesting along this journey of making these two buildings?
00;29;16;07 - 00;30;10;16
JV
You know, I learned things from every project. My favorite thing about my job today is that I feel like I'm certainly teaching a great deal and hopefully working hard too, if I can lead and inspire. But I find my younger staff are teaching me every day. They're showing me how they're using the technology, they're showing me better ways of doing things.
So I learned a tremendous amount in this. I certainly learned a lot about and I thought I knew quite a lot about brick detailing, doing special bricks, some of the special fabrication we're doing, the robotic fabrication with the GFRC. And to me, every project is really an opportunity to figure out how can we do that even better? How can we apply to the next job, how can we build our body of knowledge?
I also love the fact that all of our projects are different. Our real signature at Studio V is that each design is really unique to that site, that client. So for example, we're doing another building with this client now on a different site in New Rochelle, and it's a completely different look and feel, even if the program is somewhat similar.
00;30;10;22 - 00;30;23;20
DP
It must be reassuring for the client, right? Because they feel a lot more special because the building you're designing every time the program changes and the site changes, you change with that, right? So that must be great for them.
00;30;23;25 - 00;31;20;04
JV
Exactly. Doug I don't believe in the idea of like the architect as an agent where they kind of put their name on it even. That's why I said it's not Valgora Architects, it's Studio V, it's a collective of people. And to me what's really important is that we find a solution for each project. We definitely have obsessions and themes that I think work through our work.
For example, we were just in the Venice Biennale early this year and we're still up actually, it's up through November and we showcase this project along with four other projects. And so one of the themes of that show was called On Edge, where we talked about all of our work, which is about edges, gaps, interstices, kind of repairing the frayed edges of our cities.
And Coney Island is one of them, both literally and figuratively as a community, as well as an oceanfront site. And so to me, the idea of instilling a series of social spaces within that and yet kind of repairing the edge of this community, remaking Surf Avenue and really helping be an agent for transformation is really what our work is about.
00;31;20;07 - 00;31;28;17
DP
So you've been an architect for some time. If you could give your younger self some career advice, can you think of something you'd tell yourself many years ago?
00;31;28;19 - 00;32;50;11
JV
I guess I've certainly made many mistakes in my career, and although those have been things that I've learned greatly from. But the other thing that's driven my career is optimism. Where I would often go from project to project, place to place, city to city early in my career, I actually found myself going from San Francisco to London to Toronto and eventually ending up in New York.
And really I feel lucky about that. So I guess in terms of advice, I'm wondering if there was a kind of serendipity to that kind of an unplanned nature to that, and I would almost hate to interfere with that. I think the freedom that I had in my youth to try different things, learn from different people, live different places, was actually the most transformative thing.
So I guess I would say that to myself, but I guess I was lucky enough just to fall into that. Maybe some of it came from where I grew up because I guess I couldn't really stay in Buffalo when my dad worked in the steel mills when I was part of those industrial buildings. That was just at the point when that was all failing and they were getting ready to tear it down.
Now, the mill where my father worked is no longer there, but now my greatest inspiration is to go back and try to reinvent those communities. One of the things I'm most proud of is that I'm going back to Buffalo and doing work there now to bring back my hometown and to create transformative buildings there, including at the old grain elevators at Silo City are other projects in the heart of Buffalo, like where we're doing projects over in the Elmwood District, our wonderful historic district where we're doing a new building now.
00;32;50;13 - 00;32;57;07
DP
Wow. Well Jay it's been great to have you here. Thanks for your time. Where can people go to learn more about Studio V Architects and yourself?
00;32;57;09 - 00;33;23;22
JV
Well, they can certainly find us online at StudioV.com. They can find us at our Instagram site. And most of all, you know, if you're ever in New York City, we'd encourage you to come see us. Come visit us at our studio itself, which is going to be at 111 East 29th Street. Or visit some of our projects, such as the Empire Stores, one of our most iconic projects in Brooklyn that's been very popular with people. We'd really welcome to have people get in touch with us or please come by the studio.
00;33;23;26
DP
Thank you very much.
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!
Design Vault Ep. 12 50 Nevins Street with John Woelfling
ABOUT THE ARCHITECT:
|
John Woelfling is committed to creating sustainable and resource-efficient designs, using an integrated and holistic approach that reduces impacts on the environment and positively effects the health and comfort of building occupants. He leverages his broad experiences working across project typologies, from education and recreation to healthcare and infrastructure, to inform his leadership of the firm's mixed-use residential projects. A recognized Passive House expert, John's focus on sustainable design practices is guided by proactive education of evolving green technologies and incorporating them into his design work.
He frequently lectures about affordable housing and sustainability, speaking at the Center for Architecture, AIA NYS, Urban Green and GreenBuild, Forum for Urban Design, Reimagine Conference, and the PHIUS Passive House Conference. John holds a Bachelor of Architecture from Virginia Tech. |
|---|
50 Nevins Street
Dattner Architects
View ProjectTRANSCRIPT
00;00;00;02 - 00;00;05;14
Doug Patt (DP)
Let's go inside the vault. The design vault.
00;00;05;17 - 00;00;33;16
John Woelfling (JW)
We looked at that rectangle and where the opportunity was to expand the building horizontally, and then really started to figure out where the best units would be located, where the best apartment layouts would be in the existing building. It was actually a challenge. We were not going to change the fenestration where the windows are located or the size of the windows.
So that really dictated a lot of the apartment placements and the size. So I think we were pretty clever about putting all the like fundamentals and figuring out how the floorplan would come together.
00;00;33;23 - 00;03;17;20
DP
This is my guest, John Woelfling. I'll share more about him shortly. In this episode from the Design Vault, we highlight John's project 50 Nevins Street. 50 Nevins Street is located in downtown Brooklyn. It literally appears to be two buildings in one. The approach was to reinvigorate a century old building through gut renovation and addition, which provides affordable housing, housing for formerly homeless individuals and mental health services.
The historic site, with its new ten story addition, features 129 new apartments. The building was originally designed by famed Brooklyn architect Frank Freeman, opened in 1913 as a YWCA. In the early 1930s an extensive portion of the building was shaved off to enlarge. Schermerhorn Street and make way for the subway line. That adjustment resulted in an imbalance to the original Colonial Revival building.
The new couple design ascribes value to the existing building and helps restore the balance it had lost. The existing red brick building remains shorter with a classical cornice. The new building sits slightly taller, flush and adjacent with a recessed connector which visually separates the architecture. The contrast in masonry color, dark connector and stylistic changes to the forms and facades set the two buildings apart esthetically, though clearly their co-combined.
Hi, I'm Doug Pat and this is Design Vault. John Woelfling is a partner at Dattner Architects in New York City and holds a Bachelor of Architecture from Virginia Tech. John leverages his broad experiences working across project types like education, recreation, health care and infrastructure to inform his leadership of the firm's mixed use residential projects.
John is a recognized passive house expert. His focus on sustainable design practices is guided by proactive education of evolving green technologies and incorporating them into his work. John's committed to creating sustainable, efficient designs that use an integrated, holistic approach. He frequently lectures about affordable housing and sustainability. Speaking at the Center for Architecture, the New York State AIA, Urban Green and Green Build, Forum for Urban Design, Reimagine Conference and the Phius Passive House Conference.
So welcome, John. Nice to have you with us today. So tell us a little bit about Dattner Architects in New York City. Where are you guys located? What's the size of the firm and what type of work do you do?
00;03;17;22 - 00;05;20;11
JW
So Dattner Architects is a firm that's been around for close to 60 years. We are located in Midtown Manhattan, just like a ten minute walk from the studio, so it's nice and easy to get over here. We've been there for a little over a year and a half, but our offices have been in New York City for our entire life of the firm, we’re about 110 people now.
I just met with a few people and we're looking at hiring some more people. So it's a good time to be practicing in New York City and working on housing and the wide variety of work that my firm does. We do a mixed bag of cornucopia of project types. We do housing, which is what we're going to talk about today.
We do subway stations, we do marine transfer stations for garbage, we do a salt shed here or there, medical health care, schools, libraries, a whole mixture of projects. I'm going to talk about some of the advantages that gives us a little bit further on if we can.
One of the projects that you or maybe some of your listeners know is a project that's on the West Side Highway at Spring Street. It is a salt shed. These types of projects that you might normally see that are a salt shed are very utilitarian domes, and they just protect the salt from the elements. But our project, we did something kind of clever, which was we created this shell that was inspired by the crystal and shape of the salt. So it's this kind of crystal that sits along the water along the West Side highway.
So if you're going up and down the West Side Highway, you've probably seen this. Keep your eyes open for it now. But that's an example of how my office has this sensibility of taking these very civic things that could be very plain and very understated and look for those opportunities. And sometimes we hit a home run, sometimes, you know, we get on base.
But each one of those projects is a real opportunity to take a civic piece of architecture, which is what we do. We do civic architecture, and we look to make the city, the city that we live in the best that it can be. So I'm very proud to be part of the work that we do. It's a large group of people, as I said, 110 people. It's inspiring every day to be able to go into the office and work with such a great group of people.
00;05;20;14 - 00;05;37;25
DP
That's so great. I mean, you're doing exactly what you're taught to do in architecture school, right? You're taking advantage of the project at hand, you're being creative, you're being thoughtful, you're impressing the client, you're making beautiful things for people that live in the city. It sounds fun and it's a good time to be working. You said you're busy.
00;05;38;02 - 00;06;15;19
JW
Yes, we are busy. We've had some ups and downs. But I do think one of the advantages of our firm is that we have this mixed group of typologies. So, you know, when housing was like going gangbusters a couple of years ago, we were really busy and a lot of our work was housing. But as things have shifted over to more infrastructure, which is actually what we're seeing, we're seeing a lot more investment in infrastructure.
We're having those subway type projects, those marine transfer stations, those types of utilitarian transportation and infrastructure projects are taking over a greater percentage of our work. So we're continuing to stay busy. So the old adage of diversifying your portfolio applies to many, many things.
00;06;15;21 - 00;06;20;29
DP
So you are a principal in the firm. How long have you been there and what's your role in the office now?
00;06;21;01 - 00;08;13;19
JW
So I have been a principal there for 20 years. I've been practicing as an architect in the city for 30 years. So I landed at Dattner relatively early in my career and found it to be a great place to stay and work. So I've been there for that long. One of the things that I focus on now is our housing work, our housing studio.
As I mentioned a few minutes ago, the housing work has been a great source of workload in the past decade, 15, ten years. As that work became more and more important in the office, we needed to have leadership to take over and really guide that practice. And one of the things that me and others in the office have been focusing on is integrating really innovative, sustainable design strategies into our housing.
And this, I think, has its biggest benefit in affordable housing. The way housing often gets developed in dense urban environments like New York City is that it is the harder to develop sites that are most likely to be affordable housing because they are the less desirable sites, the sites that are either adjacent to a highway, adjacent to a subway, difficult geometry, a lot of rock, some sort of challenging situation, which thank you for the recognition that my firm and me personally are doing what architects are trained to do looking at these challenges and finding the opportunities.
So that's what we do. We often are faced with challenging sites that maybe are right near infrastructure that is really adding to pollution and environmental degradation. So this idea of sustainable, affordable housing I think is really in our work translated into environmental justice, taking people who might normally live in these underserved communities that have this infrastructure and a real inequity for environmental considerations and trying to make that better. And one of the ways we do that is through Passive House.
00;08;13;21 - 00;08;20;04
DP
So let's dig in here and talk about our building. Tell us a little bit about 50 Nevins Street. So how did your office get the project?
00;08;20;06 - 00;10;13;14
JW
So one of our clients, ICL, which stands for Institute for Community Living, and they are a not for profit organization that does just tremendous, phenomenal work in the city, serving really at-risk underserved people in New York City. They owned this building. They purchased it in 1986. As you mentioned in the intro, it was originally designed as a YWCA as an SRO, a single room occupancy building.
So all the rooms were like single bedded rooms. There was a common cafeteria and kitchen and common bathing facilities. So it was like really stacking people in. And this was like an old model of housing people that was, you know, appropriate at a certain time in the city's history. But not really contemporary residential standards, what we would expect today.
So that was kind of the history of this building. You also mentioned the shaving off of the north end of the building, which actually we suspected that through some research, but we didn't really get it confirmed until we got into the building and started doing the demolition and saw, oh, this is where they replaced this column with a different type of steel that was in the original building.
It was riveted steel. In the new portion it was rolled sections. We'd see the back up wall or actually the composite wall. And the original building was all brickwork. It was all bonded brick wall in the new building in the modified part that happened when they widened the street, it became a terracotta block back up with then the finished brick in front, the window details were different. So it was actually really interesting to have that kind of confirmation and see it once the demo all happened. The building has this legacy of being modified and I think serving the greater good, the widening of the street and the shaving off of 20 feet of the building was done so that there would be this greater public amenity of the subway station that would be improve the life of all New Yorkers.
00;10;13;16 - 00;10;18;24
DP
Yeah, interesting. It's all related. So what was the building next to your building?
00;10;18;27 - 00;11;33;13
JW
The building next to our building was a recently constructed hotel, which was a very different building type, superstructure type construction techniques, and much taller than the existing building as well. So it was a really dominating presence. So one of the things that we tried to do and I think we were pretty successful is kind of mitigate that presence.
It was just to the west of our site. But yeah, we wanted to kind of bridge that more contemporary with the traditional classic building that was retained on the site. The strategy that we employed for the redevelopment was to expand the building both vertically and horizontally. The horizontal piece was easy. You just, you know, you build next to the building.
There was a parking lot. Basically a service area for the existing building, which is, you know, very handsome pre-war building. But that pre-war building kind of vintage came with a lot of burdens or a lot of legacy issues that made the building more difficult to use as a contemporary building that needed to be handicapped accessible.
The systems were out of date really at the end of their service life. So we had to do some major kind of heroic things to this existing building to keep it.
00;11;33;13 - 00;11;34;14
DP
And you wanted to keep it?
00;11;34;21 - 00;12;03;18
JW
Yeah, absolutely. It was such a handsome building also, I've mentioned sustainable design, but one of the most sustainable things that you can do if you're doing a project is to keep an existing building, keep the shell, keep as much as you can. Now, obviously, you've got to like do some demolition and throw some materials away. But if you can keep that building out of the landfill, keep that building from having to be shipped to the landfill and all the energy that goes into that retaining that energy that was originally used to build the building, that's one of the most sustainable things that you can do of all.
00;12;03;24 - 00;12;06;09
DP
So tell me, is the subway system still there?
00;12;06;11 - 00;12;21;03
JW
Oh, yeah, yeah, yeah. It is. We don't quite feel it rumbling in the building when it goes by, but there were some really special supportive excavation considerations that we had to do. We had to be really concerned about settlement. So there was a lot of thought put into the foundations of this building.
00;12;21;03 - 00;12;22;27
DP
Yeah, the new foundations.
00;12;23;00 - 00;13;57;28
JW
So the new foundations were complicated. The existing building foundations were also complicated. When we did this vertical expansion above the existing building, I mentioned earlier the term heroic, and it really was heroic. I mean, when I look back on this, I think, Oh my God, what was I thinking? And we actually convinced somebody to do this. We convinced a contractor to do this.
We convinced our client, which, you know, there are great clients. I don't want to make it sound like I've deceived them, but it was a really courageous project to both undertake by all parties. In the existing building we built above, there was additional load that we were superimposing on the existing superstructure in that building. We had to brace one of the columns so that we could lower the footing and increase the size of the footing.
And the way we did that was and when I say we, I mean it's really the contractor that did this. We came up with the concept, but they executed it. There was a huge beam that was spanned from one column to another that supported this column temporarily, that we were going to lower the footing on, and they jacked that beam up and supported that column so that the existing footing that was undersized could be pulled out, excavated further down, and then a new footing could be introduced and an extension of the column.
So gutsy acrobatics to do this. And the way they tested whether that beam, a temporary beam that was put in, whether it separated the footing from the column, was they took a piece of paper and they slipped it between the footing and the base plate of the column to see if it was actually separated. So they wanted to test that to make sure there was daylight before they pulled out that existing footing. Phenomenal construction sequencing and logistics. It was a gutsy project I'm very proud of.
00;13;58;01 - 00;14;00;21
DP
So what were the project restrictions like for you guys?
00;14;00;26 - 00;15;33;11
JW
So there were a couple of restrictions. When we first started looking at this, we wanted to increase the density of the project because it was a rare kind of once in a building's lifetime opportunity to increase the amount of affordable and supportive housing that could be provided in downtown Brooklyn. So our client ICL, knew that this was kind of their one chance.
So we looked at a couple ideas, a couple of options, and to get to 129 units, we had to bend, maybe break the rules of the New York City zoning resolution. And the way you do that is you go through something called a ULURP. It's a process that involves community engagement. It involves talking to city planning, New York City city planning departments, and doing something that is not as of right.
The current zoning resolution and building code allow you to build certain things. As long as you get approval from the Department of Buildings, you can build those. But we needed to bend the rules here or break the rules to make this actually happen. So we went to the various city agencies, went to community boards and made this proposal to expand the building vertically, to increase the floor area ratio, the amount of floor area that you can build on the site.
And we were successful in that because I think a lot of these stakeholders recognized that this project was going to really make a difference to so many people's lives and be a community asset. So normally we've all heard the term NIMBY, not in my backyard. Normally. That's one of the things that we bought up against when we do these types of projects and there was some of that, but I think it was much more toned down because people recognized the benefit of this project.
00;15;33;18 - 00;15;37;18
DP
So did you guys have the building completely designed when you went to the people?
00;15;37;21 - 00;15;48;12
JW
No. We had the vision. We kind of had a good idea how many units were going to go into the building. We knew what the program was going to be. We had some of the renderings completed because that's really important to making that pitch to stakeholders.
00;15;48;18 - 00;15;51;24
DP
What about height requirements for you guys? What limited you?
00;15;52;00 - 00;16;15;09
JW
I'm going to try not to get too much into the weeds and the zoning resolution, but this is it actually falls into a limited height district in downtown Brooklyn, which we adhered to, but we needed the increased floor area. The height was somewhat limiting, but there were other limitations on the building as well. We could only add so many floors onto the existing building before we kind of maxed out on what we could really feasibly do with the existing foundations and the existing superstructure.
00;16;15;11 - 00;16;24;13
DP
So let's talk a little bit about the building plan. So the existing building is like a long rectangle. So what did you guys do with your additions?
00;16;24;15 - 00;17;55;23
JW
So one of the really critical things for affordable housing in most housing, all housing is efficiency. And the efficiency was really driven by the desire to maximize the number of units that we could put here so we could serve the most people. So we looked at that rectangle and where the opportunity was to expand the building horizontal lean and located our cores, our elevator and our stairs in a spot that worked best for that, and then really started to figure out where the best units would be located, where the best apartment layouts would be. In the existing building, it was actually a challenge. We were not going to change the fenestration where the windows are located or the size of the windows. So that really dictated a lot of the apartment placements and the size. New York City has something called light and air requirements for the apartments, you need to have a certain size window for a certain size room, and you can't go below that for both light daylight and ventilation.
So the existing building’s layout was determined largely not completely, but largely by the existing fenestration layout. And then we had more flexibility in the new building portion, but that was also a challenge because it was a very limited floor plates and it really had to integrate with the existing building. We had corridors that we had to figure out.
We placed the elevator in the inside corner where the two buildings meet, because that's a place where you can't really put apartments because there's no windows there. So I think we were pretty clever about putting all the, like, fundamentals and figuring out how the floor plan would come together.
00;17;55;25 - 00;18;01;04
DP
How did the apartment sizes compare from the old building to the new building? Are they exactly the same?
00;18;01;06 - 00;18;57;09
JW
No, it is dramatically different. The original SRO, the single room occupancy, I mean, the rooms were eight feet wide, ten feet deep. So really puny and not in any way contemporary or fair housing model for the residents that were going to come back. So we basically blew out all those interior partitions and relaid out the building interiors.
The original building was actually a double loaded corridor. And when I said below the corridor, I mean there's a hallway down the middle and it's got apartments on either side, fairly efficient way to do it. But it was such a narrow building and the site is so narrow that when we redid the building in this more contemporary model of apartments, we couldn't fit a double loaded corridor in there.
So it's really a single loaded corridor in the existing building. In the new building, we had more flexibility in the site dimension, so we were able to do a double loaded corridor in that portion. But it was, yeah, a real challenge to adapt the existing building. But as I said, you know, it's one of the most sustainable things you can do.
00;18;57;16 - 00;19;01;06
DP
Are the apartments a lot larger in the new building and the windows taller?
00;19;01;12 - 00;20;38;07
JW
I would say in the new building, no, they're not significantly larger. They're just kind of what they are. I think the windows are maybe a little bit taller, certainly wider. We wanted to have some affinity between the two buildings. We didn't want to have like completely different fenestration sizes, which really I think would be inequitable to the people who would move into this building.
But we did in many ways, we made the new building distinct from the existing building. You go around New York City or any other city that's been around for a while and you see these buildings that are historic and have been adapted. You know, there's a couple of ways you can do it. You can either be matchy matchy about it and try to replicate in new construction and new materials a very similar thing.
And that's usually pretty apparent. It's never seamless, even if you could make it perfectly matching, I just don't think that's genuine. I don't think it's a truthful representation of where we are in the construction and it's not necessary. There may be times when it's merited, but it shouldn't be your knee jerk reaction. It shouldn't be the starting point.
So one way is to be absolutely seamless about it. One is to put a cap on top of the building. But we wanted to make this building really tell a story about the history of it. So we basically wrapped this new piece of contemporary construction up in around the existing building and allowed it to kind of finish off the existing building.
You mentioned earlier some of the adaptations that have happened to the building that I think really compromised the original integrity of the design, the symmetry and the way the building ended. So I think we kind of rectified that with this new construction that comes over the top and helps finish the building in a way that I think looks more appropriate.
00;20;38;12 - 00;20;42;27
DP
So tell me about the cornice on the existing building. Is that new or was that there?
00;20;43;02 - 00;20;51;14
JW
That's actually a really interesting question. The cornice we thought from the street level. Oh, that's the original cornice. It looks very detailed and looks contemporary on the building.
00;20;51;16 - 00;20;52;11
DP
It's gigantic.
00;20;52;11 - 00;21;05;12
JW
It's gigantic. Yeah, it's probably four feet tall and overhangs three feet. It's yeah, it's enormous. But we got up there and when we started to do that demolition that I mentioned earlier, it's made of fiberglass. So it was actually done some time, I think in the…
00;21;05;12 - 00;21;06;06
DP
Sixties or so?
00;21;06;06 - 00;21;27;27
JW
I think it was actually in the eighties. I think after ICL originally bought the building, they did a couple modifications to make it better suit their needs, not to the extent that we'd most recently renovated, but they, I think, replaced the existing cornice with a fiberglass one. The fiberglass one is in great shape. We kept it. We like took it off where we had to for construction sequencing and logistics, but then put the thing back and just re-caulked it. It's done now.
00;21;27;28 - 00;21;40;09
DP
But it's a great cap to the existing building and it really sets the two buildings apart. And when you look at the additions, it all kind of makes sense. And that cornice I think does a lot to do that.
00;21;40;14 - 00;21;53;23
JW
Yeah, it's a very formal gesture, that retaining it and then allowing that to be part of this kind of bridge. In this reveal that you also mentioned earlier, the reveal is very intentional to help make that separation very visible and legible.
00;21;53;29 - 00;22;01;25
DP
So did you guys have to make many structural changes to the existing building? You gutted it and it's steel? On the interior?
00;22;01;25 - 00;22;06;18
JW
Steel frames, multi exterior wall. We did do window replacements.
00;22;06;20 - 00;22;08;26
DP
Changed the way the walls are insulated?
00;22;08;29 - 00;23;14;11
JW
We did, yeah. We did a spray-on insulation. I know there's some critique of spray on insulation, but it really was the right material for this because it gave us our vapor barrier and our improved insulation all in one shot. But yeah, we did that on the inside of the building. One of the principles of Passive House, which is a system to really decrease the building's energy requirements, you significantly drive down the energy loads in a building using the system.
And the way you do that is a high performance building exterior. That's one of the strategies, is you make a high performance building exterior, which is both your windows and your insulation and your continuity of the insulation and your air vapor barrier. So in historic buildings you're somewhat limited with what you can do with that continuous insulation because you've got your slabs coming in, the slabs are buried on the exterior wall or the steel, but there's thermal bridges that just can't be avoided in these buildings of this timeframe.
But we did the best we could. And on balance, with the insulation on the inside and the new building’s envelope, we were able to get a building that could easily comply with the energy code. So yeah, we had to insulate the existing buildings walls and that's how we dealt with that.
00;23;14;18 - 00;23;22;17
DP
You guys had to replace some of the existing brick. So talk a little bit about that and then tell us what kind of brick you used on the new addition.
00;23;22;20 - 00;24;41;25
JW
Sure. Yeah. The existing brick, we had to undo some sins of the past at lintels the repairs that were done previously. Not quite sure when they were done with maybe a little bit less sensitivity to matching the brick and the mortar. So that was some of the repair work that we did at the existing building. The existing building also has a base, a very formal base.
It's a very classical design to have that base. So we wanted to, that was another one of these affinity points that we wanted with the new building. So we created this base, which was a dark grounding brick that's a Glen-Gery product, it's a Black Hills velour. The velour is the finish on the brick. So that kind of established the base of the building.
Then above that, we did a much lighter, more contemporary brick, also a Glen-Gery product, White Plains velour. Again, the velour is the finish of the texture of the face of the brick, and we did similar coursing, the mortar is very different. The mortar in the White Plains is its own mortar. The existing buildings, mortar repairs were their own mortar, so they would match that building's texture and coloration.
But through a combination of the same brick size, the same coursing, and also picking up on that limestone detailing that's in the existing building we did kind of create this affinity between the two buildings. So they're definitely distinct from each other, but they're also kind of of a family.
00;24;42;01 - 00;24;48;23
DP
Yeah, it's a nice touch. It ties the two buildings together. So how long did this whole process take from beginning to end?
00;24;48;25 - 00;26;00;29
JW
That is a good question. So the ULURP is something that you don't normally undertake. The ULURP is a discretionary approval process, so that added about a year to the design time. So I would say it took about 18 months to design the building, and the construction of it was also really complicated. It took, I think, 30 months to build it, and that included demolition, it included the excavation, and a global pandemic.
So it was one of these projects where, you know, we had to figure out how to do this, how to work remotely, work with the contractor, with all these site safety considerations. So we were fortunate enough that in the city there was a program that allowed for affordable housing to proceed. So it was told to the Department of Buildings that this is an affordable housing project and they give you a special permit that you post on the construction barricade.
And that allowed us to proceed. Now, it doesn't mean that we could proceed business as usual. Before the pandemic, there were all sorts of hand-washing stations and protocols for staff to be, you know, separate. And we would show up on site, we'd have masks, we wouldn't walk between crowds of people. So the fact that it got done in two and a half years is kind of a real testament to the partnership between ICL, the contract and the design team.
00;26;01;05 - 00;26;21;21
DP
So you'd mentioned the unique construction detail with this steel column that you guys had to alter the foundation for. What about some of the masonry on the exterior? Were there any unique construction details that you guys had to come up with? For example, for the connector, how did you guys end up doing that? I mean, is it all pretty straightforward?
00;26;21;23 - 00;27;03;24
JW
Well, yeah, I guess straightforward is a real simplification of what's involved. But yeah, we had to figure out where the steel was going to go, where we were going to break that new steel versus the existing steel. There's got to be some tolerances for movement and construction tolerances. That bridge was really made through that recessed metal reveal that you see separating the two buildings.
So we made it easier on ourselves by doing it in that different material that allowed for a lot of tolerance. It could be pushed back 18 inches and if, you know, was 16 inches in one place and a little bit different on the other side, you couldn't really tell because it was a very different material. So I think we're smart about making our lives in the contractors' lives a little bit easier.
00;27;04;01 - 00;27;08;11
DP
And how does the new additions touch the building next to it?
00;27;08;11 - 00;27;12;07
JW
There is a seismic joint.
00;27;12;07 - 00;27;13;06
DP
Really? Is that pretty typical?
00;27;13;06 - 00;27;41;21
JW
It's pretty typical, yeah. And it's based upon the various heights of the building. For every 50 feet it's one inch. So I think we had a setback from the property line three inches because we were just over 100 feet. So for every 50 feet you got one inch. So if you're 110, you got three inches. So we had something called an MCO joint, which is just a squishy finished joint that you kind of stuffy in after everything else is up and constructed. And that allows for any sort of seismic movement in case there's an earthquake.
00;27;41;23 - 00;27;45;28
DP
So tell me a little bit about the Enterprise Green Communities Program.
00;27;46;00 - 00;31;03;17
JW
It is a program that any affordable housing project that is going to be using public funds needs to adhere to. It's a little bit like LEED, LEED is a very broad system. So Enterprise and LEED are broad. They talk about community connected communities, recycled materials, water usage, energy usage, healthy interior environments. So that system is really helpful and I think it helps there be a consistency through all of the affordable housing that's being built now that there is this level of sustainability that is not only about carbon, it's about water, it's about interior indoor air quality.
So that's a really important system. The Passive House system that I've touched on a little bit earlier takes one piece of that, the energy piece of it and really ramps it up. So Passive House is about investing in that building exterior. You have a high quality envelope with continuous insulation, continuous air barrier that allows for very little air to come in or out of the building.
And that continuity is also part of the windows. And the windows are usually high performance windows that are either triple glazed or just high performance glazing. And what that really allows the envelope of the building to do is to be almost like a winter jacket. I think a good analogy aside from the winter jacket analogy, is like a thermos, an insulated cup versus just the standard deli coffee cup.
Your deli coffee cup is going to lose the heat in the coffee pretty quickly. If you've got the thermos, it's going to retain that heat for a lot longer. So what that allows you to do in the building is retain interior internal heat gains. And the internal heat gains are lighting, appliances, people occupying the space. So those internal heat gains that you can gain passively and retain in the building allow you to really drive down those heating loads in the building.
So in a building built in New York City, similar to 50 Nevins on its scale and its size and its number of occupants, you can heat the apartment with a hand dryer, so you really drive down those heating loads. You've got to cool the building too. So that high performance envelope also helps keep that cooled air, that energy that's invested in the air, keep that inside the building.
It's not leaking outside the building. You're not getting hot, humid air bleeding into the building when you're exhausting the bathrooms and the kitchen. So Passive House is really taking the energy component of any affordable housing building and really ramping up the stakes and making it a much more high performance building. There's more to it than that. The mechanical systems need to be designed and balanced for that.
There's domestic hot water that needs to be taken into consideration, but it's an area of practice that we are really pushing for and advocating with our clients for not only just being democratic and equitable for the buildings and the environments that they're often located in, but there's also regulatory pressures that are coming down the pike. There's something called Local Law 97, which is going to fine buildings if they don't have certain energy performance, if they emit too many emissions, whether it's carbon or sulfur dioxide or whatever, there's metrics for buildings of certain types and their sizes. And if you are not meeting those standards, there's going to be penalties to pay.
00;31;03;19 - 00;31;04;26
DP
So that's coming down the pike.
00;31;04;26 - 00;31;42;01
JW
That's coming down the pike. I think 2025 is the first threshold or maybe it's 2026. But we're designing buildings now that are going to take a year to design, two years to build. So by the time they're operational, we're in Local Law 97. So we're advising clients to not put your heads in the sand on this. You know, a lot of people aren't doing this.
The intense heat that we've been feeling, the wildfires in Canada, the fires and migration, we're starting to see the stuff hit the fan. So our clients are reading the writing on the wall. Local Law 97. There is a Local Law 154 that's banning gas usage.
00;31;42;04 - 00;31;43;20
DP
Natural gas.
00;31;43;20 - 00;31;53;10
JW
Yeah, natural gas. And you've actually done something that I want to check you on. Yeah, sure. It's natural gas, but who told you it's natural gas? It's fossil gas. The idea of that, it's natural. Okay.
00;31;53;10 - 00;31;55;02
DP
I was distinguishing from propane.
00;31;55;06 - 00;32;17;11
JW
Okay, well, it's kind of all the same stuff. It's all carbon that goes into the atmosphere and affects our climate. So I don't mean to be a jerk about it. And I find myself kind of being programmed by certain, you know, sales pitches and how they want you to perceive these things. So, yes, there's a natural gas ban, however nice you want to say it. So there's all these regulatory pressures.
00;32;17;11 - 00;32;20;23
DP
When you say local law. So this is New York State, New York City?
00;32;20;26 - 00;33;06;12
JW
Local law is just New York City. There's state legislation that's also banned gas fired equipment. And California's doing a similar thing. So it's amazing how much the landscape is shifting under our feet. There's a building in New York City not too far from where we are right now that was designed six or seven years ago. And one of the really innovative, cutting edge technologies that they used was to use a gas turbine to produce all of their electricity.
There was a cogen plant, so on the top of the building on the 73rd floor, they've got a gas turbine. And I believe it's also producing domestic hot water for the building's use, which seems, you know, at the time innovative, were going to be more independent. But I can't imagine trying to propose that sort of strategy now. So it's really amazing how much the landscape is shifting under our feet.
00;33;06;14 - 00;33;12;19
DP
So you've been an architect for 30 years. If you could give your younger self some career advice, what would it be?
00;33;12;21 - 00;33;55;23
JW
Knowing what I know now, I wish I would have been more thoughtful about sustainability and how important that is, because I think the decisions that we're making now, we're only really going to see the benefits of that or the implications or the results of that down the road and when I think about how much carbon has been put into the atmosphere since, like I think 1992, I think 50% of the carbon that's in the atmosphere was produced I think since the nineties. So it's not climate change, global warming. It's often thought about as something that's occurred in over a century. And a lot of the legacy emissions were from the beginning of the industrial revolution, but it's really not the case. It's really in this compressed time frame that's in the last 30, 40 or 50 years.
00;33;55;25 - 00;34;02;22
DP
John, it's been great to have you here. Thanks for your time. Where could people go to learn more about Dattner Architects in New York City and yourself?
00;34;02;25 - 00;34;18;20
JW
It's really easy. We've got a website, Dattner.com, I think we have a good representation of our work there. You'll see that all of our work is basically in the city and we can ride the subway to get to our site. So it's a pleasure to have spoken to you today and glad to be able to share some of my experience.
00;34;18;23
DP
Thank you very much and great to have you here
You May Also Be Interested In
We Can Help With Your Next Project
Discover the latest + greatest in design trends, industry news & pro tips from pros.
For all of your project needs, you’ll find everything you need at a Supply Center.
Let Us Know How We Can Help!